RE: Slow4 Jun 2019 17:31
Its not actually slow is it. They started drilling again on Sunday some time, ROP is typically 30-50m perday, therefore 5 days or so to reach the gas target area. Rig is not the most up to date and impressions from the short video on the rig crew, they are not busting a gut to make those connections in record time but progress is being made and they can only drill as fast as is prudent or as fast as the rig can manage with adding weight to the bit and keeping it rotating safely. No worries, have drilled with equipment 4 x as big and managed to get 10m a day at some point. deep well, high pressure and temperature, tricky stuff. They will be going as quickly as they feel safe to go. Timescales in drilling or very approximate, give or take 20%.