RE: VALUATION18 Feb 2026 12:53
7MWp "Upon completion of the construction, the Company estimates gross proceeds of approximately €14.8 million, in the first 10 years." Equals €2,114,285 per MWp.
7MWp cost €3,870,000 including the land. Equals €552,857 per MWp
Profit: €2,114,285 minus €552,857 equals €1,561,428. A return on investment in the first 10 years of 282.42%.
The current 125.5MWp portfolio would have gross proceeds of €265,342,767 over the first 10 years, generating(!) €195,957,597 in gross proceeds.
A 200MWp portfolio (at end of 2026) would have gross proceeds of €422,857,000 over the first 10 years, generating(!) €312,283,023 in gross proceeds.
Solar panels last at least 25 years, some up to 40 years with minimal degradation, and these are now over 25-year-old technology. Newer panels are expected to last even longer with the new technology that Zenith Energy will be installing, so these numbers are not even the minimum return on these projects.
https://www.energysage.com/solar/how-long-do-solar-panels-last/