RE: egm vote20 Jul 2018 11:07
The vote and EGM should take place in September, I'm assuming November is a date given so that the paper work can be signed and ratified with TPDC. My guess is the real physical action by APT will start at that point with Drill & Seismic during the dry season. I'm hoping to hear that equipment is being shipped and prepared in readiness soon after the EGM
With the Seismic being done side by side with Ch1 drill, once the results are analysed (Q1), I wouldn't be at all surprised to see further drilling during next year. By that time all permits and approvals should be in place and as APT have the cash there is no reason for them to hang about so full steam ahead it is for me!