RE: Apache5 Feb 2024 17:55
BG, I am not too sure how that connects directly to the Drill Rig contract? The "Gathering Station" is there to collect gas in the absence of the pipeline as I understand it; they can gather gas from NT1 without the need of the Rig. Moreover it has yet even to be designed and engineered let alone constructed. So, I will stick to my original assertion - there will be plenty of time to buy at these levels.