RE: PFS11 Oct 2021 11:19
If you have listened to my tour :)) then standing at the end of the Decline looking towards the ore there is about 10m of concreted breccia between there and the sulphide were after. This sulphide pocket looks around 75mx75x100m so at 3 specific gravity is around 1.7mtons @4.1 this increases to 2.3m tons.
They won’t stop there though , there are further high grade breccia behind it and also further high grade sulphide pockets to the left and right.
The Decline is only capable of removing 2m tons according to Hannams so on that 2m ton extraction the grades are very important
5g/t = 370,000 oz gold for 4.1sg
6g/t = 445,000 oz
7g/t = 520,000oz
8g/t = 593,000 oz
The latest drills found 11 g/t = 815,000 oz
From the same tonnage
This prize is enormous