RE: NCM growth27 Oct 2021 12:30
The 2m ton per annum is an assumption, an early stage interim assessment to kick start the mining approvals.
The PFS though was walkways going to be out of date before it was issued, the last drills included were from last January.
Forget the 2m ton per annum assumptions it’s dead in the water look at the 3m ton potential but that won’t be with us very long.
The mining plan is an initial plan that will be adopted but expect adaptions ,revisions , upgrade, extensions, and definitely cheaper alternative mining methods.