@Itsyou My figures for possible production from Kilimapesa show that approaching 50koz production is possible with fully upgraded Plants 1 & 2 plus new HL Plants 3 & 4 on 3-month HL cook cycle ... the trick will be mining enough of the right grade ore profile to keep it fed!
Updated steady state Scenario for Jul-2023 onwards = 4,020oz/month or 48,240oz/year
Plant 1 & 2 (30ktpm) = 30kt *2.5g/t /31.1 *92% = 2,200oz/month combined crush, mill, grind, gravity, CIL and leach
Plant 3 (4x 5kt pads) = 20kt/3 *1.72/31.1 *70% = 260z/month assuming 3-month HL cook cycle time
Plant 4 (2x 60kt pads) = 120kt/3 *1.72/31.1 *70% = 1,560oz/month assuming 3-month HL cook cycle time
Note 1: Assumes plant 1 & 2 %efficiency 91%>92% after full-refurb & plant upgrades
Note 2: Assumes plant 3 & 4 %efficiency 53.5% on 2-week HL cook cycle to 70% on 3-month HL cook cycle
We have not seen any figures for what their new HL plant is REALLY capable of and if they can compress the cycle time to up the throughput with minimal loss of % recovery ... as every 5% recovery is +/-390oz.