RE: They're in no rush to RNS.9 Jan 2025 09:15
@doc he did previously answer this a few times to be fair and with pretty fair figures imo
“Doc, 9 million paid for H1 completion, H2 drilling and testing and GOBI 1 drilling, H2 is not a dud, its drilled, from there remedial works will improve on the 30 bbl/d, GOBI quite possibly similar, its drilled, could be it now needs fracked, costing for all are below, i posted these a month ago and from Progressive report it seems i was quite accurate.
We know two costs. To drill a well costs 1.5 million, we also know the entire cost to bring a well to production is 4 million, To bring a well to production includes 3 processes which are as follows:
1: Drill the well, (1.5 million fact)
2: Well test. (1.25 million est)
3: Completion. (1.25 est)
So fair to say Well test and completion costs 2.5 million. (have estimated 1.25 million for each)
H1 was drilled and well tested in 2019, this year H1 costs were completion only so we could start producing so H1 costs this year around 1.25 million.(note surface completion equip-ment such as beam pump & compressors were onsite before the infamous fund raise so paid for from funds before the raise).
H2 was drilled and well tested, it has not been completed so H2 costs around 2.75 million.
(H2 came in drilled a week early so I would assume slightly lesser cost than above.)
Gobi 1 was drilled, not well tested and not completed so Gobi 1 cost 1.5 million.
The remainder of the 9 million is cash in bank enough for daily costs/salaries until around end of April, i have made no account for nor included oil in storage.
You appear to want perfection and gushers with every well drilled, grow up, lifes not like that.“