RE: PM Email Reply on Farm Out News Due Soon/ 200MW Hybrid Project - Coming Together!3 Dec 2025 09:11
Lot of mind games and false figures being posted here, best stick to the facts, farm in new well advanced, that was a few months ago so no doubt more progress made.
Gazelle initial production set at 200 bopd, assuming reservoir pressure is hanging in there every chance we could see an increase in bopd at Gazelle, H2 beam pump was realigned and started pumping 5th November (RNS), cannot see why we would still be pumping if we are not getting anything out, i would suspect the well would have been shut in by now and reworks next season but that has not happened so i would guess we are pumping oil, even low bopd is fine, perforation blockage was mentioned in 5th Nov RNS, if thats the case it could be sand same as we had early days at H1 but we know H1 sand was flushed through, that could well be where we are with H2, pumping oil and flushing sand out.
All to play for, we are sitting on billions of dollars of oil and to make things even better Mongolia really need that oil for the refinery, block XX is the only untapped oil field capable of delivering oil in the quantity the refinery needs, hencr bloxk XX being designated special purpose land (Ref RNS 5th Feb 2025).