The latest Investing Matters Podcast episode featuring Jeremy Skillington, CEO of Poolbeg Pharma has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksXtract Regulatory News (XTR)

Share Price Information for Xtract (XTR)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 1.00
Bid: 0.90
Ask: 1.10
Change: 0.00 (0.00%)
Spread: 0.20 (22.222%)
Open: 1.00
High: 1.00
Low: 1.00
Prev. Close: 1.00
XTR Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Phase Two Drilling Update at Bushranger

29 Jul 2021 11:39

RNS Number : 9333G
Xtract Resources plc
29 July 2021
 

 

For immediate release

29 July 2021

 

Xtract Resources Plc

("Xtract" or the "Company")

Phase Two Drilling Update at Bushranger

 

The Board of Xtract Resources Plc ("Xtract" or the "Company") is pleased to report on progress of the Phase Two diamond drilling programme at the Bushranger copper-gold porphyry exploration project in New South Wales, Australia.

 

Highlights

 

· First completed hole of Phase 2 drill programme encountered well-developed copper mineralisation over approximately 120m length in angled hole BRDD-21-008

· Logging and core splitting is under way to prepare samples for assay

· Drilling of hole BRDD-21-007 is continuing from adjoining pad about 100m distant, with a third, steeper angled hole already under way from the first drill pad

Colin Bird, Executive Chairman said: "The Phase 2 drilling programme at the Racecourse deposit is now well under way at two sites. The first completed hole, BRDD-21-008, encountered strongly developed copper mineralisation, as anticipated. Drilling of the initial hole at the second drill pad is still continuing and we will report on this hole when completed. Work on site continues to progress rapidly and the third hole of the programme has already commenced."

Phase 2 Drilling Progress to Date

Drilling commenced as planned at Racecourse from two drill pads utilising one diamond drill rig at each pad. Hole BRDD-21-008 was completed at 591.4m depth and drilling on hole BRDD-21-007 is continuing. Drilling on a third hole at the first drill pad is already under way.

BRDD-21-008 was drilled at an angle of -50 degrees towards the northeast. The hole encountered traces of disseminated/vein type chalcopyrite copper mineralisation from about 170m downhole, with particularly strong mineralisation developed between 260-380m approximately (view core photographs linked to this announcement). Further copper traces continued until about 580m depth. The width of the main mineralised interval was much as anticipated in advance of drilling. Detailed logging and core cutting is well under way and samples will be dispatched for assay shortly.

 

BRDD-21-008: Sulphide mineralisation at about 291m depth

http://www.rns-pdf.londonstockexchange.com/rns/9333G_1-2021-7-29.pdf

 

BRDD-21-008: Vein-type mineralisation at about 297m depth

http://www.rns-pdf.londonstockexchange.com/rns/9333G_2-2021-7-29.pdf

 

BRDD-21-008: Close-up of chalcopyrite mineralisation at 309m depth

http://www.rns-pdf.londonstockexchange.com/rns/9333G_3-2021-7-29.pdf

 

 

Phase 2 Drilling Programme at the Racecourse Mineral Resource - Background

The Bushranger porphyry copper-gold project is located in the highly prospective Lachlan Fold Belt ("LFB") of New South Wales, Australia. The current JORC (2012)-compliant Inferred Mineral Resource on the Racecourse deposit is estimated as 71Mt @ 0.44% Cu and 0.064g/t Au, at a 0.3% Cu cut-off, without inclusion of data from the Phase One drilling programme which was recently concluded and reported.

The Phase Two programme is designed primarily to follow up on the results obtained by Anglo American Exploration Australia Pty Ltd ("Anglo") in 2014 and 2015 and to define further the shallower part of the Resource with a view to possible development of a large open pit. A total of approximately 8,000m of drilling is planned in the first block of 13 holes using two drill rigs, focussing primarily on further definition of the potentially open-pittable, higher-grade copper-gold zone in the central part of the resource area.

 

Further information is available from the Company's website which details the company's project portfolio as well as a copy of this announcement: www.xtractresources.com

 

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014 as it forms part of UK Domestic Law by virtue of the European Union (Withdrawal) Act 2018 ("UK MAR").

 

The person who arranged for the release of this announcement on behalf of the Company was Colin Bird, Director.

 

 

Enquiries:

 

Xtract Resources Plc

Colin Bird,

Executive Chairman

 

+44 (0)20 3416 6471

www.xtractresources.com

Beaumont Cornish Limited

Nominated Adviser and Joint Broker

Roland Cornish

Michael Cornish

Felicity Geidt

+44 (0)207628 3369

www.beaumontcornish.co.uk

 

Novum Securities Limited

Joint Broker

 

Jon Belliss

Colin Rowbury

 

+44 (0)207 399 9427

www.novumsecurities.com  

 

 

Qualified Person:

Information in this announcement relating to the exploration works has been reviewed by Edward (Ed) Slowey, BSc, PGeo, a consultant to Xtract. Mr Slowey is a graduate geologist with more than 40 years' relevant experience in mineral exploration and mining, a founder member of the Institute of Geologists of Ireland and is a Qualified Person under the AIM rules. Mr Slowey has reviewed and approved the geological content of this announcement.

 

Qualified Person:

In accordance with AIM Note for Mining and Oil & Gas Companies, June 2009 ("Guidance Note"), Colin Bird, CC.ENG, FIMMM, South African and UK Certified Mine Manager and Director of Xtract Resources plc, with more than 40 years' experience mainly in hard rock mining, is the qualified person as defined in the Guidance Note of the London Stock Exchange, who has reviewed the technical information contained in this press release.

 

 

TECHNICAL GLOSSARY

The following is a summary of technical terms:

 

"Au"

Gold

 

"chalcopyrite"

A copper-iron sulphide mineral, CuFeS2, often found in copper ores

 

 

"Cu"

Copper

 

"Inferred Mineral Resource"

That part of a Mineral Resource for which quantity and grade (or quality) are estimated on the basis of limited geological evidence and sampling. Geological evidence is sufficient to imply but not verify geological and grade (or quality) continuity. It is based on exploration, sampling and testing information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes

 

 

"JORC Code"

Australasian Institute of Mining and Metallurgy Joint Ore Reserves Committee code on mineral resources and ore reserves

 

"mineralisation"

process of formation and concentration of elements and their chemical compounds within a mass or body of rock

 

"porphyry"

a deposit of disseminated copper minerals in or around a large body of intrusive rock

 

 

ENDS

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
DRLEAEXNADSFEFA
Date   Source Headline
3rd Apr 20241:00 pmRNSZambian Exploration Licence Joint Venture
23rd Feb 20249:00 amRNSCompletion of Disposal of Manica Gold Project
16th Feb 20249:05 amRNSDisposal of Manica Gold Project
13th Feb 20241:15 pmRNSResult of Meeting
8th Feb 20247:00 amRNSUpdate on Zambian Copper Joint Venture & Strategy
24th Jan 202411:00 amRNSProposed disposal of Manica Gold Project
6th Nov 202311:30 amRNSBushranger pit optimisation & financial study
23rd Oct 20231:32 pmRNSManica Q2 2023 Gold Production Update
29th Sep 202311:10 amRNSHalf-year Report
24th Aug 20239:24 amRNSZambian exploration licences joint venture
28th Jul 20236:00 pmRNSResult of AGM
20th Jul 20239:05 amRNSBushranger Pre-Concentration Test Results
6th Jul 20237:00 amRNSManica Q1 2023 Gold Production Update
5th Jul 202310:28 amRNSNotice of AGM
29th Jun 20234:16 pmRNSFinal Results
20th Jun 202312:55 pmRNSAccounts and Annual General Meeting update
6th Apr 20237:00 amRNSFourth quarter 2022 production update
30th Mar 20237:00 amRNSChange of auditor
7th Mar 20234:35 pmRNSPrice Monitoring Extension
7th Mar 20237:00 amRNSUpdate on Open Pit Mining Study for Bushranger
26th Jan 20237:00 amRNSKakuyu Copper Project Zambia update
23rd Jan 20234:40 pmRNSSecond Price Monitoring Extn
23rd Jan 20234:35 pmRNSPrice Monitoring Extension
13th Jan 20239:44 amRNSDirector/PDMR Shareholding
9th Jan 20231:25 pmRNSThird quarter 2022 production update
19th Dec 202211:42 amRNSAscot Prospect Maiden Mineral Resource
15th Dec 20223:53 pmRNSKakuyu copper project Zambia
8th Dec 20224:08 pmRNSHolding(s) in Company
5th Dec 202210:32 amRNSTotal Voting Rights
23rd Nov 202211:05 amRNSSecond Price Monitoring Extn
23rd Nov 202211:00 amRNSPrice Monitoring Extension
23rd Nov 20227:00 amRNSRacecourse Prospect Updated Mineral Resource
22nd Nov 202212:21 pmRNSApplication update
4th Nov 202210:43 amRNSAward of share options and settlement shares
6th Oct 202211:00 amRNSAscot Prospect final assay results
30th Sep 202210:52 amRNSHalf-year Report
30th Sep 20227:00 amRNSProduction update
24th Aug 202210:20 amRNSResult of AGM
15th Aug 20221:05 pmRNSBushranger results of metallurgical test work
8th Aug 20224:40 pmRNSSecond Price Monitoring Extn
8th Aug 20224:35 pmRNSPrice Monitoring Extension
8th Aug 20222:06 pmRNSSecond Price Monitoring Extn
8th Aug 20222:00 pmRNSPrice Monitoring Extension
4th Aug 20229:13 amRNSBushranger completion of phase two drilling
29th Jul 202211:37 amRNSNotice of AGM
27th Jul 202212:14 pmRNSBushranger assay results and drilling update
21st Jul 20227:00 amRNSFair Bride Update
7th Jul 202212:18 pmRNSBushranger assay results and drilling update
1st Jul 202211:06 amRNSSecond Price Monitoring Extn
1st Jul 202211:00 amRNSPrice Monitoring Extension

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.