The latest Investing Matters Podcast episode featuring Jeremy Skillington, CEO of Poolbeg Pharma has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksXtract Regulatory News (XTR)

Share Price Information for Xtract (XTR)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 1.00
Bid: 0.90
Ask: 1.10
Change: 0.00 (0.00%)
Spread: 0.20 (22.222%)
Open: 1.00
High: 1.00
Low: 1.00
Prev. Close: 1.00
XTR Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Manica Q1 2023 Gold Production Update

6 Jul 2023 07:00

RNS Number : 1202F
Xtract Resources plc
06 July 2023
 

 

 

6 July 2023

Xtract Resources Plc

("Xtract" or the "Company")

Manica Q1 2023 Gold Production Update

 

Xtract Resources Plc ("Xtract" or the "Company") announces the preliminary unaudited results for gold production for the Fair Bride deposit and other mining within the Manica Concession in Mozambique, for the three-month period ended 31 March 2023 ("Q1 2023").

 

Highlights

 

Fair Bride:

· Fair Bride, where Xtract has a 23% share of net profit, is now the main project at Manica ("Fair Bride"). Fair Bride gross gold production continued to increase during Q1 2023 and was 140Kg (equivalent to approximately 4,522 ounces)

· Fair Bride's average gold sales price for Q1 2023 was US$1,859 per ounce

· Month on month, gold production has increased from 37.6 kg in January Q1 2023 to 66.3kg in May of the current quarter (Q2 2023)

· Clear indications are that post the heavy rains, results are improving significantly and Q2 2023 is showing a marked improvement with plant throughput increasing from 30,000 tonnes per month in Q1 2023 to current nameplate capacity of more than 40,000 tonnes per month

· Application of a more robust grade control process has resulted in a marked improvement in run of mine grade delivered to the plant

· Mill running time has increased from 67.3% availability in Q3 2022 to a reported 82% availability in May Q2 2023

· The unit cash cost for Q2 2023 is anticipated to be in-line with similar sized operations on a global basis as the operation stabilises

 

Other Manica Projects:

· For the other projects at the Manica Concession, including the Alluvial and other hard rock production, Xtract is entitled to a percentage share of the gold produced ("Other Manica Projects")

· The total gold production for these the Other Manica Projects in Q1 2023 was 36Kg (equivalent to approximately 1,156 ounces) of which the Xtract's share was 183 ounces

· Other Manica Projects' average gold sales price for Q1 2023 was US$.1,812 per ounce

 

Colin Bird, Executive Chairman said: "We are very pleased with the progress being made at Manica and the first Quarter performance was excellent when one considers the effect of the heavy and prolonged rains that the Project was exposed to during the post-commissioning phase. The second Quarter results have seen a continued improvement in performance with more consistent gold production in April and May returning 68 and 66kg respectively. We will provide regular updates and anticipate continued improvement in the unit cash cost of production as the benefits of improvement and optimisation of mining, processing and grade control are felt by the operation".

 

 

 

 

Fair Bride Operation

 

The Fair Bride gold deposit is within the Manica concession situated 270km NW of the city of Beira within Licence 3990C in the Odzi-Mutare-Manica Greenstone Belt of Mozambique.

 

Mutapa Mining and Processing, LDA ("MMP"), is operator of the Manica carbon-in-leach plant (CIL).

 

Table 1 shows the quarterly gold production and sales prices for Quarter 1 2023 for the Fair Bride project and year to date figures for 2023. The production statistics for Fair Bride are provided by Contract miner, MMP.

 

Table 1: Gold Production and sales prices - Fair Bride (Xtract 23% share of net profit)

Q1

 2023

Year to date 2023

Tonnes Mined & Processed (tons)

107,023

107,023

Average grade (g/t)

1.51

Au Production (ounces)

4,522

4,522

Au recovery (%)

87.70

87.70

Average sales price per ounce in US$

1,859

1,859

Cost per oz of Au (US$) 

1,185

1,185

 

Gross monthly mine production from Fair Bride has grown month on month as the operation has bedded down and typical post-commissioning issues have been resolved. Steady improvement has been reported in throughput tonnes processed, run of mine grade, mill throughput rate and mill availability, all of which are expected to result in continued improvement in the unit cash cost per ounce of gold produced which can be expected to benefit revenue.

 

Table 2: Ore Tonnes Processed Q3 2022 to Q2 2023

Period under review

 

Ore Processed

(tpm)

July 2022

15,300

November 2022

21,800

February 2023

30,500

May 2023

43,200

 

 

Table 3: Mill throughput Rate Q3 2022 to Q2 2023

Period under review

 

Ore Tonnes Milled per hour

(t/hr)

July 2022

30.5

November 2022

42.1

February 2023

56.2

May 2023

61.4

 

 

 

 

 

 

 

 

Table 4: Fine Gold Poured Q3 2022 to Q2 2023

Period under review

 

Fine Gold Poured

(kg)

July 2022

14.3

November 2022

25.5

February 2023

37.6

May 2023

66.3

 

 

Revenue and therefore Xtract's share of net profit was impacted by two main factors. Operation through the first rain season in Manica resulted in a shortfall in plant throughput as wet clay-rich near-surface mined material affected the operating efficiencies of both screens and the mill. Measures have been put in place to alleviate the problem and the impact of improvements can already be seen with the month-on-month ore processing figure rising from 30,000 tonnes per month in February of Q1 2023 to a current reported estimate of approximately 43,000 tonnes per month in May Q2 2023.

 

A significant amount of additional close-spaced drilling was completed during Q1 2023 specifically to improve grade control and the ability to better predict the Run of Mine grade that could be anticipated by the processing plant. This work had an almost immediate impact on improvement in the run of mine grade with the average rising from 1.2g/t Au in February Q1 2023 to a current reported grade for May Q2 2023 of approximately 1.8g/t Au. An increase in grade equivalent to an additional $36 per tonne of ore delivered to the plant at the current gold price could also have a significant positive impact on revenue and margin.

 

Xtract Resources and Manica Project Revenue Stream and Reporting

 

Production at Manica is now dominated by Fair Bride. The gold mined at Manica projects other than Fair Bride is now significantly scaled down as the mineable resource for these projects is significantly reduced. Accordingly, the Company has adopted a new format for quarterly reporting which is set out below. Other Manica Projects production will no longer be reported quarterly.

 

Xtract will receive 23% of the net profit at Fair Bride when the prevailing price of Gold is greater than US$1,250 per ounce. Xtract's share reduces to 21.5% if the prevailing gold price is greater than US$1,175 but less than US$1,250 and to 20% if the prevailing price of Gold is less than US$1,100 per ounce. Profit is defined as: Revenue on Sale less deductible costs (excluding non-cash items) and corporation tax of 32% after utilising any tax losses. At the current gold price Xtract is due 23% of the net profit.

 

Xtract will be reporting production and gold price statistics for Fair Bride on a quarterly basis with Xtract's 23% net profit share to be included in its annual and interim financial accounts.

 

 

 

Further details are available from the Company's website which details the company's project portfolio as well as a copy of this announcement: www.xtractresources.com

 

Xtract Resources Plc

Colin Bird,

Executive Chairman

 

+44 (0)20 3416 6471

www.xtractresources.com

Beaumont Cornish Limited

Nominated Adviser and Joint Broker

Roland Cornish

Michael Cornish

Felicity Geidt

+44 (0)207628 3369

www.beaumontcornish.co.uk

 

Novum Securities Limited

Joint Broker

 

Jon Bellis

Colin Rowbury 

 

+44 (0)207 399 9427

www.novumsecurities.com  

 

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulation (EU) No. 596/2014 as it forms part of UK Domestic Law by virtue of the European Union (Withdrawal) Act 2018 ("UK MAR").

Qualified Person:

Colin Bird: The technical information contained in this announcement has been reviewed, verified, and approved by Colin Bird, C.Eng, FIMMM, South African and UK Certified Mine Manager and Director of African Pioneer plc, with more than 40 years' experience mainly in hard rock mining.

Glossary

 

Au

 

Gold

oz

 

Ounces

Kg

Kilogrammes (there are 32.1507 ounces in a Kilogramme

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDZZGGNMKGGFZZ
Date   Source Headline
3rd Apr 20241:00 pmRNSZambian Exploration Licence Joint Venture
23rd Feb 20249:00 amRNSCompletion of Disposal of Manica Gold Project
16th Feb 20249:05 amRNSDisposal of Manica Gold Project
13th Feb 20241:15 pmRNSResult of Meeting
8th Feb 20247:00 amRNSUpdate on Zambian Copper Joint Venture & Strategy
24th Jan 202411:00 amRNSProposed disposal of Manica Gold Project
6th Nov 202311:30 amRNSBushranger pit optimisation & financial study
23rd Oct 20231:32 pmRNSManica Q2 2023 Gold Production Update
29th Sep 202311:10 amRNSHalf-year Report
24th Aug 20239:24 amRNSZambian exploration licences joint venture
28th Jul 20236:00 pmRNSResult of AGM
20th Jul 20239:05 amRNSBushranger Pre-Concentration Test Results
6th Jul 20237:00 amRNSManica Q1 2023 Gold Production Update
5th Jul 202310:28 amRNSNotice of AGM
29th Jun 20234:16 pmRNSFinal Results
20th Jun 202312:55 pmRNSAccounts and Annual General Meeting update
6th Apr 20237:00 amRNSFourth quarter 2022 production update
30th Mar 20237:00 amRNSChange of auditor
7th Mar 20234:35 pmRNSPrice Monitoring Extension
7th Mar 20237:00 amRNSUpdate on Open Pit Mining Study for Bushranger
26th Jan 20237:00 amRNSKakuyu Copper Project Zambia update
23rd Jan 20234:40 pmRNSSecond Price Monitoring Extn
23rd Jan 20234:35 pmRNSPrice Monitoring Extension
13th Jan 20239:44 amRNSDirector/PDMR Shareholding
9th Jan 20231:25 pmRNSThird quarter 2022 production update
19th Dec 202211:42 amRNSAscot Prospect Maiden Mineral Resource
15th Dec 20223:53 pmRNSKakuyu copper project Zambia
8th Dec 20224:08 pmRNSHolding(s) in Company
5th Dec 202210:32 amRNSTotal Voting Rights
23rd Nov 202211:05 amRNSSecond Price Monitoring Extn
23rd Nov 202211:00 amRNSPrice Monitoring Extension
23rd Nov 20227:00 amRNSRacecourse Prospect Updated Mineral Resource
22nd Nov 202212:21 pmRNSApplication update
4th Nov 202210:43 amRNSAward of share options and settlement shares
6th Oct 202211:00 amRNSAscot Prospect final assay results
30th Sep 202210:52 amRNSHalf-year Report
30th Sep 20227:00 amRNSProduction update
24th Aug 202210:20 amRNSResult of AGM
15th Aug 20221:05 pmRNSBushranger results of metallurgical test work
8th Aug 20224:40 pmRNSSecond Price Monitoring Extn
8th Aug 20224:35 pmRNSPrice Monitoring Extension
8th Aug 20222:06 pmRNSSecond Price Monitoring Extn
8th Aug 20222:00 pmRNSPrice Monitoring Extension
4th Aug 20229:13 amRNSBushranger completion of phase two drilling
29th Jul 202211:37 amRNSNotice of AGM
27th Jul 202212:14 pmRNSBushranger assay results and drilling update
21st Jul 20227:00 amRNSFair Bride Update
7th Jul 202212:18 pmRNSBushranger assay results and drilling update
1st Jul 202211:06 amRNSSecond Price Monitoring Extn
1st Jul 202211:00 amRNSPrice Monitoring Extension

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.