The latest Investing Matters Podcast episode featuring Jeremy Skillington, CEO of Poolbeg Pharma has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksXtract Regulatory News (XTR)

Share Price Information for Xtract (XTR)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 1.00
Bid: 0.90
Ask: 1.10
Change: 0.00 (0.00%)
Spread: 0.20 (22.222%)
Open: 1.00
High: 1.00
Low: 1.00
Prev. Close: 1.00
XTR Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Ascot Prospect final assay results

6 Oct 2022 11:00

RNS Number : 0363C
Xtract Resources plc
06 October 2022
 

 

For immediate release

6 October 2022

 

Xtract Resources Plc

("Xtract" or the "Company")

Ascot Prospect Final Assay Results

 

The Board of Xtract Resources Plc ("Xtract" or the "Company") is pleased to announce assay results for follow up drill holes BRDD-22-051, BRDD-22-052 and BRDD-22-055, which were drilled to further investigate the copper-gold intersections in drill hole BRDD-21-035 which represented the discovery hole at the Ascot porphyry system on the Bushranger Project in central New South Wales, Australia. The holes were planned in particular to check the up-dip projection of the intersections in BRDD-21-035 where mineralisation might be potentially amenable to open pit extraction. The drilling completed by Xtract throughout 2021 and 2022 has confirmed the presence of two significant porphyry systems at the Racecourse and Ascot prospects on the Bushranger Project. 

 

Highlights

 

· Drill hole BRDD-21-051 was drilled above hole BRDD-21-035, at a shallower inclination, and intersected the Zones 2 and 3 of copper-gold mineralisation as follows:

§ 18m @ 1.8% CuEq from 432m (Zone 3) - amongst the highest grade intervals intersected to date on the overall Bushranger Project

§ 8m @ 0.12% CuEq from 278m and 18m @ 0.12% CuEq from 292m and (Zone 2)

· Drill hole BRDD-22-052 was drilled from the west to east, whereas drill hole BRDD-21-035 was drilled east to west, and intersected copper-gold mineralisation as follows:

§ 16m @ 0.49% CuEq from 419m (Zone 3)

§ 18.16m @ 0.25% CuEq from 493m (Zone 2)

§ 8m @ 0.23% CuEq from 652m (Zone 1)

· Hole BRDD-22-055 was drilled to test the Ascot mineralisation at depth; due to drilling issues the hole was not completed as planned, but did intersect 63m @ 0.22% Cu Eq from 616m downhole depth, including 4m @ 1.07% Cu Eq at the top of this zone

· The copper-gold mineralisation intersected in the Ascot drill holes is laterally extensive and has been traced over 1km of strike in a north-south direction

· Xtract is currently compiling a geological model of the copper-gold mineralisation at Ascot with the objective of defining a maiden Mineral Resource Estimate for the Ascot prospect

Colin Bird, Executive Chairman said: "The Ascot prospect continues to produce some very encouraging drill intersections. The 18m @ 1.8% CuEq is amongst the highest grade copper intersections on the overall Bushranger Project and it confirms that the excellent intersection of 64m @ 0.58% CuEq (Zone 3) in drill hole BRDD-21-035, continues to shallower depth. The results from holes BRDD-21-051, 52 and 55, when combined with the results of other holes we have released from the Phase 2 drilling programme at the Ascot prospect, show that the copper-gold mineralisation at Ascot is laterally extensive, extending over approximately 1km of strike. It is also worth noting that the higher grade copper mineralisation in Zone 3 at Ascot is open both up and down dip and to the south. We are now working on the overall geological model for Ascot, which will then be used to produce a maiden Mineral Resource Estimate for the Ascot Prospect. This will be in addition to the updated Racecourse mineral resource estimate which is close to completion."

Bushranger Project Drill Hole Location Plan

 

http://www.rns-pdf.londonstockexchange.com/rns/0363C_1-2022-10-6.pdf

 

Ascot Prospect Geological Cross Section for Drill Holes BRDD-21-035, 051, 052 & 055

 

http://www.rns-pdf.londonstockexchange.com/rns/0363C_2-2022-10-6.pdf

 

Ascot Prospect Drill Hole Assay Results

Drill hole BRDD-21-035 was the second hole drilled into the Ascot discovery, situated 1.5km to the south-east of the centre of the Racecourse prospect and followed up the encouraging results recorded in drill hole BRDD-21-033, the discovery hole at Ascot (see announcements dated 19 January 2022 and 9 December 2021) BRDD-21-035 returned three zones of substantial copper and gold mineralisation including;

 

§ 66m @ 0.26% CuEq from 166m including 18m @ 0.39% CuEq from 194m (Zone 1)

§ 52m @ 0.26% CuEq from 356m including 8m @ 0.52% CuEq from 394m (Zone 2)

§ 164m @ 0.35% CuEq from 552m including 64m @ 0.58% CuEq from 552 (Zone 3)

 

BRDD-22-051 was drilled at an inclination of -50 degrees towards the west (azimuth of 267o true north) and was completed at a final depth of 555.3m. It was drilled primarily to intersect the Zone 2 and Zone 3 intersections from drill hole BRDD-21-035, but at shallower depths (see assay results in Table 1).

 

Table 1 -Assay Results from Drill Hole BRDD-21-051*

Hole ID

From (m)

To (m)

Interval (m)

Cu (%) 

Au (g/t)

Ag (g/t)

CuEq (%)**

Zone No.

BRDD-21-051

278.00

286.00

8.00

0.09

0.03

0.8

0.12

2

292.00

310.00

18.00

0.06

0.08

0.70

0.12

432.00

450.00

18.00

1.44

0.36

14.3

1.80

3

*Assays undertaken by Bureau Veritas Minerals Pty. Ltd. Laboratory, Adelaide, Australia

**CuEq Formula: CuEq = Cu% + 0.6578xAu (g/t) + 0.0088xAg (g/t)

 

BRDD-22-052 was drilled at an inclination of -55 degrees towards the east (azimuth of 102o true north) and was completed at a final depth of 704.5m. This hole was drilled to cut the Zone 3 intersection from drill hole BRDD-21-035 at shallower depth above that hole and to intersect the Zone 1 mineralisation at greater depth below drill hole BRDD-21-035 (see assay results in Table 2).

 

Table 2 -Assay Results from Drill Hole BRDD-21-052*

Hole ID

From (m)

To (m)

Interval (m)

Cu (%) 

Au (g/t)

Ag (g/t)

CuEq (%)**

Zone No.

BRDD-21-052

345.00

349.00

4.00

0.21

0.06

2.90

0.28

419.00

435.00

16.00

0.02

0.71

0.70

0.49

3

493.00

511.16

18.16

0.20

0.07

0.80

0.25

2

652.00

660.00

8.00

0.10

0.17

2.20

0.23

1

*Assays undertaken by Bureau Veritas Minerals Pty. Ltd. Laboratory, Adelaide, Australia

**CuEq Formula: CuEq = Cu% + 0.6578xAu (g/t) + 0.0088xAg (g/t)

 

BRDD-22-055 was drilled from west to east to test the deeper mineralisation below the Zone 3 intercept in hole BRDD-21-035. It intersected a 63m interval of moderate copper/gold mineralisation (see assay results in Table 3) but the hole was truncated due to drilling difficulties without testing the full planned target interval.

Table 3 -Assay Results from Drill Hole BRDD-21-055*

Hole ID

From (m)

To (m)

Interval (m)

Cu (%) 

Au (g/t)

Ag (g/t)

CuEq (%)**

Zone No.

BRDD-21-055

616.00

678.00

62.00

0.18

0.05

1.40

0.22

3

Incl.

616.00

642.00

26.00

0.24

0.08

2.10

0.31

3

 Incl.

616.00

620.00

4.00

0.73

0.44

6.30

1.07

3

*Assays undertaken by Bureau Veritas Minerals Pty. Ltd. Laboratory, Adelaide, Australia

**CuEq Formula: CuEq = Cu% + 0.6578xAu (g/t) + 0.0088xAg (g/t)

 

 

In summary, three steeply dipping, sub-vertical zones of copper-gold mineralisation were intersected in holes BRDD-21-035, BRDD-22-051 and BRDD-22-052 at the Ascot prospect which are open up and down dip and along strike to the south.

 

The intersection in hole BRDD-22-051 of 18m @ 1.8% CuEq from 432m (Zone 3) occurred 170m up dip of the intersection of 64m @ 0.58% CuEq in drill hole BRDD-21-035 suggesting that high grade copper mineralisation does extend closer to surface and potentially within depths which would be amenable to open pit extraction.

 

In addition to the Ascot drilling, two exploration drill holes, FTDD-22-001 and 002 completed at the Footrot prospect, about 7km south-southeast of Racecourse, intersected lengthy intervals of alteration and iron sulphide mineralisation along with traces of copper and possible gold indicator minerals. This could suggest proximity to a mineralised porphyry - further modelling of the geophysical results here will be required.

 

 

 

Xtract is now incorporating all the geological and geochemical data from the Ascot prospect into a geological model which will be used to estimate a maiden Mineral Resource (JORC 2012) for the Ascot prospect. In tandem with this, a revised resource estimate is in preparation for the Racecourse deposit. This will then be used as the basis for an updated conceptual open pit mining study.

 

 

 

 

Further information is available from the Company's website which details the company's project portfolio as well as a copy of this announcement: www.xtractresources.com

 

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014 as it forms part of UK Domestic Law by virtue of the European Union (Withdrawal) Act 2018 ("UK MAR").

 

The person who arranged for the release of this announcement on behalf of the Company was Colin Bird, Executive Chairman and Director.

 

Enquiries:

 

Xtract Resources Plc

Colin Bird,

Executive Chairman

 

+44 (0)20 3416 6471

www.xtractresources.com

Beaumont Cornish Limited

Nominated Adviser and Joint Broker

Roland Cornish

Michael Cornish

Felicity Geidt

+44 (0)207628 3369

www.beaumontcornish.co.uk

 

Novum Securities Limited

Joint Broker

 

Jon Belliss

Colin Rowbury 

 

+44 (0)207 399 9427

www.novumsecurities.com  

 

 

Qualified Person:

Information in this announcement relating to the exploration works has been reviewed by Edward (Ed) Slowey, BSc, PGeo, a consultant to Xtract. Mr Slowey is a graduate geologist with more than 40 years' relevant experience in mineral exploration and mining, a founder member of the Institute of Geologists of Ireland and is a Qualified Person under the AIM rules. Mr Slowey has reviewed and approved the geological content of this announcement.

 

Qualified Person:

In accordance with AIM Note for Mining and Oil & Gas Companies, June 2009 ("Guidance Note"), Colin Bird, CC.ENG, FIMMM, South African and UK Certified Mine Manager and Director of Xtract Resources plc, with more than 40 years' experience mainly in hard rock mining, is the qualified person as defined in the Guidance Note of the London Stock Exchange, who has reviewed the technical information contained in this press release.

 

TECHNICAL GLOSSARY

The following is a summary of technical terms:

 

"Ag"

Silver

"Au"

Gold

"Cu"

Copper

"CuEq"

Copper equivalent grade, calculated using assumed metal prices for copper, gold and other metals

"Induced Polarisation (IP)"

A method of ground geophysical surveying which employs the passing of an electrical current into the ground to test for indications of conductive metallic sulphides

 

"Inferred Mineral Resource"

That part of a Mineral Resource for which quantity and grade (or quality) are estimated on the basis of limited geological evidence and sampling. Geological evidence is sufficient to imply but not verify geological and grade (or quality) continuity. It is based on exploration, sampling and testing information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes

"mineralisation"

process of formation and concentration of elements and their chemical compounds within a mass or body of rock

"porphyry"

a deposit of disseminated copper minerals in or around a large body of intrusive rock

 

ENDS

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
DRLFIFSAIALRIIF
Date   Source Headline
3rd Apr 20241:00 pmRNSZambian Exploration Licence Joint Venture
23rd Feb 20249:00 amRNSCompletion of Disposal of Manica Gold Project
16th Feb 20249:05 amRNSDisposal of Manica Gold Project
13th Feb 20241:15 pmRNSResult of Meeting
8th Feb 20247:00 amRNSUpdate on Zambian Copper Joint Venture & Strategy
24th Jan 202411:00 amRNSProposed disposal of Manica Gold Project
6th Nov 202311:30 amRNSBushranger pit optimisation & financial study
23rd Oct 20231:32 pmRNSManica Q2 2023 Gold Production Update
29th Sep 202311:10 amRNSHalf-year Report
24th Aug 20239:24 amRNSZambian exploration licences joint venture
28th Jul 20236:00 pmRNSResult of AGM
20th Jul 20239:05 amRNSBushranger Pre-Concentration Test Results
6th Jul 20237:00 amRNSManica Q1 2023 Gold Production Update
5th Jul 202310:28 amRNSNotice of AGM
29th Jun 20234:16 pmRNSFinal Results
20th Jun 202312:55 pmRNSAccounts and Annual General Meeting update
6th Apr 20237:00 amRNSFourth quarter 2022 production update
30th Mar 20237:00 amRNSChange of auditor
7th Mar 20234:35 pmRNSPrice Monitoring Extension
7th Mar 20237:00 amRNSUpdate on Open Pit Mining Study for Bushranger
26th Jan 20237:00 amRNSKakuyu Copper Project Zambia update
23rd Jan 20234:40 pmRNSSecond Price Monitoring Extn
23rd Jan 20234:35 pmRNSPrice Monitoring Extension
13th Jan 20239:44 amRNSDirector/PDMR Shareholding
9th Jan 20231:25 pmRNSThird quarter 2022 production update
19th Dec 202211:42 amRNSAscot Prospect Maiden Mineral Resource
15th Dec 20223:53 pmRNSKakuyu copper project Zambia
8th Dec 20224:08 pmRNSHolding(s) in Company
5th Dec 202210:32 amRNSTotal Voting Rights
23rd Nov 202211:05 amRNSSecond Price Monitoring Extn
23rd Nov 202211:00 amRNSPrice Monitoring Extension
23rd Nov 20227:00 amRNSRacecourse Prospect Updated Mineral Resource
22nd Nov 202212:21 pmRNSApplication update
4th Nov 202210:43 amRNSAward of share options and settlement shares
6th Oct 202211:00 amRNSAscot Prospect final assay results
30th Sep 202210:52 amRNSHalf-year Report
30th Sep 20227:00 amRNSProduction update
24th Aug 202210:20 amRNSResult of AGM
15th Aug 20221:05 pmRNSBushranger results of metallurgical test work
8th Aug 20224:40 pmRNSSecond Price Monitoring Extn
8th Aug 20224:35 pmRNSPrice Monitoring Extension
8th Aug 20222:06 pmRNSSecond Price Monitoring Extn
8th Aug 20222:00 pmRNSPrice Monitoring Extension
4th Aug 20229:13 amRNSBushranger completion of phase two drilling
29th Jul 202211:37 amRNSNotice of AGM
27th Jul 202212:14 pmRNSBushranger assay results and drilling update
21st Jul 20227:00 amRNSFair Bride Update
7th Jul 202212:18 pmRNSBushranger assay results and drilling update
1st Jul 202211:06 amRNSSecond Price Monitoring Extn
1st Jul 202211:00 amRNSPrice Monitoring Extension

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.