Less Ads, More Data, More Tools Register for FREE

Pin to quick picksXtract Regulatory News (XTR)

Share Price Information for Xtract (XTR)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.95
Bid: 0.90
Ask: 1.00
Change: 0.00 (0.00%)
Spread: 0.10 (11.111%)
Open: 0.95
High: 0.95
Low: 0.95
Prev. Close: 0.95
XTR Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Investment Update

2 Nov 2007 13:07

Xtract Energy plc02 November 2007 2 November 2007 AIM: XTR XTRACT ENERGY PLC ("Xtract" or the "Company") PROJECT UPDATE - MEO Australia Ltd Xtract is pleased to refer shareholders to the following press release announcedin Australia by MEO Australia Ltd ("MEO"). Xtract currently holds approximately 21.3% of the issued capital of MEO. "HERON-2 WELL WEEKLY DRILLING REPORT - No 3 Key Points: • 20 inch casing landed and cemented• Currently testing and installing 15,000 PSI Blow-out Preventer stack (BOP)• Preparing to drill 171/2 inch hole to 2200m MELBOURNE, AUSTRALIA (November 2, 2007) -- MEO Australia Limited (ASX: MEO)submits this drilling report for the period ending 1000 hours, November 1, 2007.The Heron- 2 well was spudded at 2230 hours (ACST) on October 12, 2007 in Exploration Permit,NT/P68. The rig completed the running and cementing of the 20 inch casing is currentlytesting and installing the 15,000 PSI Blow-out Preventer stack (BOP). The 15K stack is required for the higher reservoir pressures predicted in the Plover sandstones of the Heron North structure. MEO expects to shortly commence drilling the 171/2 inch hole to a target depth of 2200m. The participants in the well are: TSP Arafura Petroleum Pty Ltd (MEO subsidiary) 45%Oz-Exoil Pty Ltd (MEO subsidiary) 45%Petrofac Energy Developments Oceania Ltd (Petrofac Limited subsidiary) 10% Heron-2 is being drilled by Seadrill's West Atlas jack-up rig contracted to MEOfor two firm wells and one option well. The Heron-2 well is designed as avertical well to penetrate and production test the Epenarra Darwin Formation andthe deeper Elang/Plover Formation of the Heron North structure. The plannedtotal depth of the well is approximately 4300m below sea level. The Heron-1 well drilled by ARCO in 1972 intersected a 52m gas bearing column inthe Darwin Formation (a fractured carbonate reservoir) within the 1,200 squarekm mapped closure of the large Epenarra structure. Heron-1 also reached a gascharged zone in the deeper underlying Elang/Plover horizon, which is a secondaryobjective for the Heron-2 well." Further information on MEO can be found at www.meoaustralia.com.au. As an ASX listed company, MEO is not subject to the AIM Rules and this drilling update has not been reviewed by a named "qualified person" as defined and required by the AIM Guidance Note for Mining, Oil and Gas Companies. Enquiries please contact: Xtract Energy plc Andy Morrison, CEO +44 (0) 20 7079 1798 Smith & Williamson David Jones +44 (0) 20 7131 4000Corporate Finance Limited Azhic Basirov Scott Harris Stephen Scott +44 (0) 20 7653 0030 Annabel Michie For further Information on Xtract please visit www.xtractenergy.co.uk About Xtract Energy Plc Xtract identifies and invests in a diversified portfolio of early stage energysector technologies and businesses with very significant growth potential. Weaim to work closely with the associated management teams to achieve criticalproject milestones, to finance later development stages and to build andcrystallise value for all shareholders and partners. Xtract is supported by its cornerstone investor, Cambrian Mining Plc (AIM:CBM) adiversified resource investment house which holds 51.5% of issued share capital. A short description of the principal assets of Xtract is set out below. Theseassets are either held directly or through wholly owned subsidiaries of theCompany. MEO Australia MEO is focused on developing gas-to-liquids ("GTL") projects in the Timor SeaAustralia, in an area of shallow water known as Tassie Shoal. It has securedCommonwealth Government environmental approvals for two large scale (1.8 Mtpa)methanol plants (50 per cent. interest) and a 3 Mtpa LNG plant (100 per cent.interest) which are adjacent to the Evans Shoal gas field. Elko Energy Elko is an oil & gas exploration company which has an interest in a 5,370km2exploration and production licence in the Danish North Sea and an investment inDragon Energy Inc, a private Canadian company, with a development project inGansu Province, China. Wasabi Energy Wasabi is a diversified investor in renewable energy and low greenhouse emissiontechnologies, with interests in geothermal waste/heat, uranium exploration inAustralia's Northern Territory and biodiesel investments in Victoria. Central Asian Interests Xtract's Central Asian interests include a production sharing agreement withKyrgyzneftegaz to instigate a water injection project on the Beshkent- Togap oilfield. Xtract also holds interests in several exploration licences in the TashKumyr area and in the Toktogul exploration licence. Oil Shale Xtract has oil shale and related petroleum product exploration rights over mining tenements in the Julia Creek area of Queensland and has recently been granted an exploration permit which gives rights to explore for oil shale in anarea in the South of New Zealand. It is investigating the commercial productionof hydrocarbons (crude oil) from oil shale. Xtract is also available for trading on the open market segment of the FrankfurtStock Exchange (ticker R9X.FSE). This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
1st Oct 202111:30 amRNSNotice of AGM
30th Sep 20212:50 pmRNSHalf-year Report
28th Sep 20217:00 amRNSBushranger Assay Results and Drilling Update
22nd Sep 20217:00 amRNSFurther Bushranger Drilling Programme Update
20th Sep 20213:32 pmRNSEureka Phase 2 Drilling Final Assay Results
14th Sep 202111:43 amRNSFurther Drilling Progress Update at Bushranger
14th Sep 20217:00 amRNSEureka Copper Project - Phase 2 drilling update
2nd Sep 20211:22 pmRNSFurther drilling progress update at Bushranger
23rd Aug 20212:59 pmRNSDirector/PDMR Shareholding
20th Aug 202110:55 amRNSDirectorate Change
19th Aug 202112:49 pmRNSFurther drilling progress update at Bushranger
12th Aug 20217:00 amRNSBushranger drilling update and licence renewal
4th Aug 20212:11 pmRNSDirectorate Change
2nd Aug 20219:00 amRNSBushranger phase two drilling update
29th Jul 202111:39 amRNSPhase Two Drilling Update at Bushranger
26th Jul 202110:30 amRNSBushranger conceptual open pit mining study
16th Jul 202111:47 amRNSPhase two drilling commences at Bushranger
13th Jul 20217:00 amRNSBushranger Project Footrot Prospect Update
12th Jul 20217:00 amRNSBushranger Project Phase Two Drill Planning
2nd Jul 20213:02 pmRNSManica alluvial gold & corporate update
30th Jun 20215:50 pmRNSTotal Voting Rights
28th Jun 202111:06 amRNSFinal Results
22nd Jun 20212:35 pmRNSBushranger Copper-Gold Project Drill Assay Results
21st Jun 20216:15 pmRNSExercise of warrants
1st Jun 20217:00 amRNSTotal Voting Rights
26th May 20217:00 amRNSBushranger Project - Further Drill Assay Results
21st May 20214:15 pmRNSExercise of warrants
17th May 20217:00 amRNSIP Survey Initial Results at Racecourse Prospect
5th May 20217:00 amRNSEureka Copper Project - Phase 2 drilling update
19th Apr 20213:07 pmRNSDirector/PDMR Shareholding
19th Apr 20217:00 amRNSPlacing to fund Bushranger phase 2 drilling
6th Apr 202111:37 amRNSCompletion of phase one drilling at Bushranger
31st Mar 20217:00 amRNSGeophysical surveying at Bushranger
29th Mar 20219:54 amRNSReconnaissance Drilling Results Kalengwa
26th Mar 20214:59 pmRNSManica Alluvial Gold & Corporate Update
24th Mar 20212:48 pmRNSDrilling Update Bushranger Project
23rd Mar 202110:56 amRNSDrilling Update Bushranger Project
19th Mar 20217:00 amRNSFirst drill assay results - Bushranger Project
17th Mar 20219:27 amRNSIssue of Equity
11th Mar 202112:47 pmRNSBushranger Project Drill Progress Update
4th Mar 20214:30 pmRNSIssue of Equity
3rd Mar 20219:05 amRNSSecond Price Monitoring Extn
3rd Mar 20219:00 amRNSPrice Monitoring Extension
2nd Mar 20212:06 pmRNSSecond Price Monitoring Extn
2nd Mar 20212:00 pmRNSPrice Monitoring Extension
1st Mar 20215:30 pmRNSTotal Voting Rights
1st Mar 20215:21 pmRNSBushranger Project Further Drilling Update
25th Feb 20212:06 pmRNSSecond Price Monitoring Extn
25th Feb 20212:01 pmRNSPrice Monitoring Extension
25th Feb 20219:55 amRNSDirector/PDMR Shareholding

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.