Less Ads, More Data, More Tools Register for FREE

Pin to quick picksXtract Regulatory News (XTR)

Share Price Information for Xtract (XTR)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.95
Bid: 0.90
Ask: 1.00
Change: 0.00 (0.00%)
Spread: 0.10 (11.111%)
Open: 0.95
High: 0.95
Low: 0.95
Prev. Close: 0.95
XTR Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Investment Update

2 Nov 2007 13:07

Xtract Energy plc02 November 2007 2 November 2007 AIM: XTR XTRACT ENERGY PLC ("Xtract" or the "Company") PROJECT UPDATE - MEO Australia Ltd Xtract is pleased to refer shareholders to the following press release announcedin Australia by MEO Australia Ltd ("MEO"). Xtract currently holds approximately 21.3% of the issued capital of MEO. "HERON-2 WELL WEEKLY DRILLING REPORT - No 3 Key Points: • 20 inch casing landed and cemented• Currently testing and installing 15,000 PSI Blow-out Preventer stack (BOP)• Preparing to drill 171/2 inch hole to 2200m MELBOURNE, AUSTRALIA (November 2, 2007) -- MEO Australia Limited (ASX: MEO)submits this drilling report for the period ending 1000 hours, November 1, 2007.The Heron- 2 well was spudded at 2230 hours (ACST) on October 12, 2007 in Exploration Permit,NT/P68. The rig completed the running and cementing of the 20 inch casing is currentlytesting and installing the 15,000 PSI Blow-out Preventer stack (BOP). The 15K stack is required for the higher reservoir pressures predicted in the Plover sandstones of the Heron North structure. MEO expects to shortly commence drilling the 171/2 inch hole to a target depth of 2200m. The participants in the well are: TSP Arafura Petroleum Pty Ltd (MEO subsidiary) 45%Oz-Exoil Pty Ltd (MEO subsidiary) 45%Petrofac Energy Developments Oceania Ltd (Petrofac Limited subsidiary) 10% Heron-2 is being drilled by Seadrill's West Atlas jack-up rig contracted to MEOfor two firm wells and one option well. The Heron-2 well is designed as avertical well to penetrate and production test the Epenarra Darwin Formation andthe deeper Elang/Plover Formation of the Heron North structure. The plannedtotal depth of the well is approximately 4300m below sea level. The Heron-1 well drilled by ARCO in 1972 intersected a 52m gas bearing column inthe Darwin Formation (a fractured carbonate reservoir) within the 1,200 squarekm mapped closure of the large Epenarra structure. Heron-1 also reached a gascharged zone in the deeper underlying Elang/Plover horizon, which is a secondaryobjective for the Heron-2 well." Further information on MEO can be found at www.meoaustralia.com.au. As an ASX listed company, MEO is not subject to the AIM Rules and this drilling update has not been reviewed by a named "qualified person" as defined and required by the AIM Guidance Note for Mining, Oil and Gas Companies. Enquiries please contact: Xtract Energy plc Andy Morrison, CEO +44 (0) 20 7079 1798 Smith & Williamson David Jones +44 (0) 20 7131 4000Corporate Finance Limited Azhic Basirov Scott Harris Stephen Scott +44 (0) 20 7653 0030 Annabel Michie For further Information on Xtract please visit www.xtractenergy.co.uk About Xtract Energy Plc Xtract identifies and invests in a diversified portfolio of early stage energysector technologies and businesses with very significant growth potential. Weaim to work closely with the associated management teams to achieve criticalproject milestones, to finance later development stages and to build andcrystallise value for all shareholders and partners. Xtract is supported by its cornerstone investor, Cambrian Mining Plc (AIM:CBM) adiversified resource investment house which holds 51.5% of issued share capital. A short description of the principal assets of Xtract is set out below. Theseassets are either held directly or through wholly owned subsidiaries of theCompany. MEO Australia MEO is focused on developing gas-to-liquids ("GTL") projects in the Timor SeaAustralia, in an area of shallow water known as Tassie Shoal. It has securedCommonwealth Government environmental approvals for two large scale (1.8 Mtpa)methanol plants (50 per cent. interest) and a 3 Mtpa LNG plant (100 per cent.interest) which are adjacent to the Evans Shoal gas field. Elko Energy Elko is an oil & gas exploration company which has an interest in a 5,370km2exploration and production licence in the Danish North Sea and an investment inDragon Energy Inc, a private Canadian company, with a development project inGansu Province, China. Wasabi Energy Wasabi is a diversified investor in renewable energy and low greenhouse emissiontechnologies, with interests in geothermal waste/heat, uranium exploration inAustralia's Northern Territory and biodiesel investments in Victoria. Central Asian Interests Xtract's Central Asian interests include a production sharing agreement withKyrgyzneftegaz to instigate a water injection project on the Beshkent- Togap oilfield. Xtract also holds interests in several exploration licences in the TashKumyr area and in the Toktogul exploration licence. Oil Shale Xtract has oil shale and related petroleum product exploration rights over mining tenements in the Julia Creek area of Queensland and has recently been granted an exploration permit which gives rights to explore for oil shale in anarea in the South of New Zealand. It is investigating the commercial productionof hydrocarbons (crude oil) from oil shale. Xtract is also available for trading on the open market segment of the FrankfurtStock Exchange (ticker R9X.FSE). This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
1st Jul 202211:06 amRNSSecond Price Monitoring Extn
1st Jul 202211:00 amRNSPrice Monitoring Extension
30th Jun 20224:33 pmRNSFinal Results
22nd Jun 20229:06 amRNSProduction Update
31st May 202211:14 amRNSAscot Prospect Drill Results Summary
27th May 20223:03 pmRNSBushranger Project Assay Results
17th May 20229:14 amRNSBushranger Project Assay Results
10th May 20227:00 amRNSBushranger Project Assay Results
9th May 20225:27 pmRNSTotal Voting Rights
22nd Apr 20227:00 amRNSExercise of warrants
6th Apr 20227:00 amRNSBushranger Project Drilling Update
31st Mar 202212:19 pmRNSBushranger Project Assay Results
21st Mar 20226:12 pmRNSChange of auditor
21st Mar 20227:00 amRNSBushranger Project Assay Results
7th Mar 20227:00 amRNSBushranger Project Assay Results
2nd Mar 20227:00 amRNSBushranger Project drilling update
28th Feb 20224:40 pmRNSSecond Price Monitoring Extn
28th Feb 20224:36 pmRNSPrice Monitoring Extension
28th Feb 202212:56 pmRNSBushranger Project MIMDAS geophysical survey
10th Feb 20221:30 pmRNSBushranger Project Assay Results
3rd Feb 20222:30 pmRNSBushranger Project Assay Results
28th Jan 202212:04 pmRNSHolding(s) in Company
26th Jan 20227:00 amRNSMetallurgical test work planned at Bushranger
19th Jan 20223:45 pmRNSBushranger Project Assay Results
18th Jan 20227:00 amRNSManica Gold Update
6th Jan 202211:39 amRNSDirectorate Change
4th Jan 20224:41 pmRNSSecond Price Monitoring Extn
4th Jan 20224:36 pmRNSPrice Monitoring Extension
4th Jan 20222:06 pmRNSSecond Price Monitoring Extn
4th Jan 20222:00 pmRNSPrice Monitoring Extension
4th Jan 202211:05 amRNSSecond Price Monitoring Extn
4th Jan 202211:00 amRNSPrice Monitoring Extension
21st Dec 20217:00 amRNSBushranger Project Assay Results
17th Dec 20211:41 pmRNSBushranger Project Phase 2 Drilling Update
9th Dec 20212:53 pmRNSNew Porphyry Copper System at Bushranger Project
2nd Dec 20217:00 amRNSBushranger Project Drilling Update
24th Nov 20217:00 amRNSBushranger Project Assay Results
19th Nov 202111:42 amRNSBushranger assay results and drilling update
12th Nov 202110:25 amRNSBushranger Project Assay Results
9th Nov 202112:30 pmRNSBushranger Project Phase 2 Drilling Update
2nd Nov 20219:07 amRNSBushranger Project Phase 2 Drilling Update
29th Oct 20217:00 amRNSBushranger Project Further Assay Results
25th Oct 20215:29 pmRNSResult of AGM
21st Oct 20212:42 pmRNSBushranger Project Assay Results
20th Oct 20212:10 pmRNSBushranger Phase 2 Drilling Programme Update
14th Oct 20217:00 amRNSManica Gold Update
13th Oct 20217:00 amRNSBushranger drilling and licence update
7th Oct 20216:06 pmRNSBushranger Project Assay Results
7th Oct 202110:01 amRNSBushranger Phase 2 Drilling Programme Update
5th Oct 20217:00 amRNSManica Alluvial Gold Update Notice of AGM

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.