George Frangeskides, Chairman at ALBA, explains why the Pilbara Lithium option ‘was too good to miss’. Watch the video here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksUk Oil & Gas Regulatory News (UKOG)

Share Price Information for Uk Oil & Gas (UKOG)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.0285
Bid: 0.027
Ask: 0.03
Change: -0.004 (-12.31%)
Spread: 0.003 (11.111%)
Open: 0.0325
High: 0.0294
Low: 0.0285
Prev. Close: 0.0325
UKOG Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

EWT Update: Horse Hill-1

10 Oct 2018 13:55

RNS Number : 6284D
UK Oil & Gas PLC
10 October 2018
 

UK Oil & Gas PLC

("UKOG" or the "Company")

 

Extended Well Test ("EWT") Update: Kimmeridge oil flows continuously to surface

Horse Hill-1 ("HH-1") Portland and Kimmeridge Oil Discovery, Weald Basin, UK

 

UK Oil & Gas PLC (London AIM: UKOG) announces that Horse Hill Developments Ltd ("HHDL"), a UKOG subsidiary company and the operator of the HH-1 Kimmeridge Limestone and conventional Portland Sandstone oil discovery, has informed the Company that the Kimmeridge Limestone 3 ("KL3") EWT programme has recorded sustained light, sweet, 40-41° API crude oil flow continuously and naturally to surface over the past 50 hours at sustained rates significantly exceeding those recorded during the KL3 short flow test programme in 2016. HH-1 is located in licence PEDL137 in which UKOG holds a 46.735% beneficial interest. Key EWT results to date are summarised below:

 

Key Points:

 

· KL3 EWT flow sequence commenced ahead of planned KL4 test.

· KL3 flowed 40-41° API continuously and naturally to surface (i.e. without any pump) over a 50 hour initial planned oil flow period. Oil flow initiated instantaneously with minimal pressure "draw-down". First planned 24-hour shut-in and pressure build-up test ("PBU") now underway.

· Sustained continuous oil rates of between 563 and 771 barrels of oil per day ("bopd") on 36/64 and 38/64 inch choke, respectively, recorded over last 24 hours through test separator. Gas rates up to 186,000 cu ft per day measured through enclosed flare. Flow sustained at constant stable bottom hole pressure.

· Recorded sustained rates significantly exceed the 464 bopd over a short 7.5-hour total flow period reported in 2016.

· Initial well productivity index of between 1.4 to 2.5 bpd/psi is around twice that seen in 2016 KL3 test.

· To date four tankers of KL3 crude have been exported to Fawley refinery.

· Zero formation water produced. Metered associated water rates of 52 barrels per day ("bpd") decreasing to 14 bpd (i.e. 9% decreasing to 2%) in the past 24 hours. Produced water consists wholly of returned heavy completion brine. Well continues to "clean-up" with decreasing water content. 

· Simultaneous pressure data recorded in overlying KL4 is indicative that KL3 and KL4 are one single connected oil pool with an implied minimum vertical extent of 358 ft.

· Further updates to be provided in due course following completion of the ongoing PBU test, further well clean-up, flow stabilisation, downhole oil sampling and further pressure build up tests.

· The KL4, which flowed at a reported rate of 901 bopd over a 4-hour period in 2016, will be flow tested after completion of the current KL3 EWT.

 

Stephen Sanderson, UKOG's Chief Executive, commented:

 

"I am delighted to have witnessed first-hand the resumption of significant continuous and sustained oil flow from the Kimmeridge at Horse Hill. Whilst it has been a long wait since the successful 2016 flow tests, it has been made more momentous by the Kimmeridge's significantly increased performance and productivity.

 

Whilst these are early days in the planned KL3 EWT sequence, with the well still "cleaning-up", the continuous and sustained high oil rates can only be seen as highly encouraging for the overall EWT objective of establishing the commerciality of the Kimmeridge. The Directors consider that these positive KL3 test results now make it increasingly likely that both the Kimmeridge and Portland oil pools are set to make Horse Hill one of the UK's leading onshore producing oil fields. Permanent production at Horse Hill is targeted in 2019. I look forward to the continuing news flow from the remainder of the KL3 test and the final KL4 EWT."

 

Qualified Person's Statement

 

Matt Cartwright, UKOG's Chief Operating Officer, who has over 35 years of relevant experience in the oil industry, has approved the information contained in this announcement. Mr Cartwright is a Chartered Engineer and member of the Society of Petroleum Engineers.

 

For further information, please contact:

 

UK Oil & Gas PLC

Stephen Sanderson / Kiran Morzaria Tel: 01483 243450

 

WH Ireland (Nominated Adviser and Broker)

James Joyce / James Sinclair-Ford Tel: 020 7220 1666

 

Cenkos Securities PLC (Joint Broker)

Joe Nally / Neil McDonald Tel: 0207 397 8919

 

Novum Securities (Joint Broker)

John Bellis Tel: 020 7399 9400

 

Public Relations

Brian Alexander / David Bick Tel: 01483 243450

 

Glossary

 

discovery

a discovery is a petroleum accumulation for which one or several exploratory wells have established through testing, sampling and/or logging the existence of a significant quantity of potentially moveable hydrocarbons

draw down

the difference between the average static reservoir pressure and the flowing bottomhole pressure

extended well test

a flow test or well test, as per the permission granted by the Oil and Gas Authority, with an aggregate flow period duration over all zones of greater than 96 hours and up to 90 days maximum

flow test

a flow test or well test involves testing a well by flowing hydrocarbons to surface, typically through a test separator. Key measured parameters are oil and gas flow rates, downhole pressure and surface pressure. The overall objective is to identify the well's capacity to produce hydrocarbons at a commercial flow rate

Productivity Index

A mathematical means of expressing the ability of a reservoir to deliver fluids to the wellbore. The PI is usually stated as the volume delivered per psi of drawdown at the sandface (bbl/d/psi).

 

UKOG Licence Interests

 

The Company has interests in the following UK licences:

 

Asset

Licence

UKOG Interest

Licence Holder

Operator

Area (km2)

Status

Avington 1

PEDL070

5%

UKOG (GB) Limited

IGas Energy Plc

18.3

Field currently shut in

Broadford Bridge 4

PEDL234

100%

UKOG (234) Ltd 4

UKOG (234) Ltd 4

300.0

BB-1 & 1z oil discovery, planning application approved

Holmwood 3

PEDL143

40%

UKOG

Europa Oil & Gas (Holdings) plc

91.8

Seeking alternate sites to drill Holmwood and other Kimmeridge prospects

Horndean 1

PL211

10%

UKOG (GB) Limited

IGas Energy Plc

27.3

Field in stable production

Horse Hill 5

PEDL137

46.735%

Horse Hill Developments Ltd 

Horse Hill Developments Ltd 

99.3

Production tests ongoing, 2 further appraisal wells scheduled for 2018/19

Horse Hill 5

PEDL246

46.735%

Horse Hill Developments Ltd

Horse Hill Developments Ltd 

43.6

As above

Isle of Wight (Onshore) 2, 3

PEDL331

65%

UKOG

UKOG

200.0

Preparing planning submission for Arreton-3 oil appraisal well and Arreton South exploration well

Markwells Wood 2

PEDL126

100%

UKOG (GB) Limited

UKOG (GB) Limited

11.2

Revised drilling and testing planning application underway

Notes:

1. Oil field currently in production.

2. Oil discovery pending development and/or appraisal drilling.

3. Exploration asset with drillable prospects and leads. PEDL234 contains the Broadford Bridge-1 and 1z oil discovery well, the extension of the Godley Bridge Portland gas discovery plus further exploration prospects.

4. UKOG has a 100% interest in UKOG (234) Ltd, which has a 100% interest in PEDL234.

5. Oil discovery in 3 zones, EWT ongoing, two further wells HH-1z and HH-2 planned in early 2019

6. UKOG has a direct 71.9% interest in HHDL, which has a 65% interest in PEDL137 and PEDL246.

 

The information contained within this announcement is deemed by the Company to constitute inside information under the Market Abuse Regulation (EU) No. 596/2014

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
DRLURVURWUARAAA
Date   Source Headline
20th Mar 202011:00 amRNSPrice Monitoring Extension
19th Mar 20204:54 pmRNSLoan Balance Reduction
16th Mar 20202:06 pmRNSSecond Price Monitoring Extn
16th Mar 20202:00 pmRNSPrice Monitoring Extension
13th Mar 20207:00 amRNSHorse Hill Granted Long-Term Production Consent
12th Mar 20204:44 pmRNSSecond Price Monitoring Extn
12th Mar 20204:37 pmRNSPrice Monitoring Extension
9th Mar 202010:00 amRNSDry Oil Flows to Surface- Water Shut-Off Programme
5th Mar 20207:49 amRNSLoan Balance Reduction
26th Feb 20203:19 pmRNSLoan Balance Reduction
19th Feb 202012:30 pmRNSHH-2z Water Shut Off Intervention Commences
17th Feb 20207:00 amRNSLoan Balance Reduction
12th Feb 202012:57 pmRNSResult of General Meeting & Loan Update
3rd Feb 20204:25 pmRNSLoan Balance Reduction
31st Jan 20204:40 pmRNSSecond Price Monitoring Extn
31st Jan 20204:35 pmRNSPrice Monitoring Extension
28th Jan 20207:00 amRNSHorse Hill & Loxley Update - Notice of GM
13th Jan 20203:25 pmRNSLoan Balance Reduction
7th Jan 202011:09 amRNSHolding(s) in Company
2nd Jan 20203:55 pmRNSIssue of Shares
30th Dec 201912:47 pmRNSLoan Balance Reduction
23rd Dec 20197:00 amRNSHH-1 and HH-2z Extended Well Test Update
2nd Dec 20197:00 amRNSResult of Placing
29th Nov 20193:35 pmRNSLoan Balance Reduction
27th Nov 20197:00 amRNSHH-2z Completed - Horse Hill
22nd Nov 20194:36 pmRNSLoan Balance Reduction
15th Nov 20191:04 pmRNSLoan Balance Reduction
12th Nov 20197:00 amRNSHH-2z Horizontal Drilling Completed
7th Nov 20194:33 pmRNSLoan Balance Reduction
4th Nov 20197:00 amRNSHorse Hill Oil Field: HH-2z Horizontal Update
22nd Oct 20197:00 amRNSHH-2 Pilot Completed & HH-2z Horizontal Underway
15th Oct 20199:00 amRNSSuccessful Completion of HH-2 Coring Operations
11th Oct 20198:56 amRNSCoring Operations Underway at Horse Hill
9th Oct 20194:05 pmRNSFurther Loan Balance Reduction
9th Oct 20197:31 amRNSHorse Hill-1 Kimmeridge "Sim-Ops" Flow Test Update
8th Oct 20197:00 amRNSDrilling Update - Horse Hill
30th Sep 20197:01 amRNSHH-2/2z Drilling Commences ("Spud") at Horse Hill
30th Sep 20197:00 amRNSGrant of Options and Share Incentive Plan
27th Sep 20193:58 pmRNSLoan Conversion
24th Sep 20197:00 amRNSRig Arrival at Horse Hill
16th Sep 201911:33 amRNSLoan Conversion
12th Sep 20197:00 amRNSDrilling and Testing Update
11th Sep 201912:36 pmRNSHorse Hill Granted Long-term Production Consent
11th Sep 20197:00 amRNSCompletion of Acquisition in Horse Hill
20th Aug 20197:00 amRNSLicence Extensions on PEDL331 and PEDL143
9th Aug 20194:41 pmRNSSecond Price Monitoring Extn
9th Aug 20194:36 pmRNSPrice Monitoring Extension
7th Aug 20197:00 amRNSAcquisition of Further Interest in Horse Hill
1st Aug 20197:00 amRNSHorse Hill-1 Production Test Update
28th Jun 20197:00 amRNSHalf-year Report

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.