We would love to hear your thoughts about our site and services, please take our survey here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksUk Oil & Gas Regulatory News (UKOG)

Share Price Information for Uk Oil & Gas (UKOG)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.0375
Bid: 0.035
Ask: 0.04
Change: 0.00 (0.00%)
Spread: 0.005 (14.286%)
Open: 0.0375
High: 0.0375
Low: 0.0375
Prev. Close: 0.0375
UKOG Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

HH-1 and HH-2z Extended Well Test Update

23 Dec 2019 07:00

RNS Number : 7435X
UK Oil & Gas PLC
23 December 2019
 

UK Oil & Gas PLC

("UKOG" or the "Company")

 

Horse Hill Oil Field: HH-1 and HH-2z Extended Well Test ("EWT") Update

 

UK Oil & Gas PLC (London AIM: UKOG) is pleased to announce the successful completion of the first phase of open hole EWT and associated well clean-up at its Horse Hill-2z ("HH-2z") horizontal well, in which the Company has an 85.635% net controlling interest. During the initial clean-up phase, HH-2z achieved initial rates of up to 1,087 barrels of fluids per day and oil cuts of up to 60%, demonstrating the horizontal's ability to flow at rates significantly greater than the HH-1 vertical well. Produced oil, brought to surface via an electronic submersible pump or "ESP", has been exported to Perenco's Hamble oil terminal for onward sale at market price.

 

HH-2z is currently shut-in for a scheduled long duration pressure build-up test ("PBU"), during which time preparations will be finalised for a series of planned interventions to further optimise flow rates from the Portland reservoir's sweet-spot.

 

Whilst HH-2z continued to clean-up prior to the current shut-in, returning oil, completion and drilling fluids to surface, evidence of formation water ingress was also recorded. Consequently, an additional routine intervention is planned to shut-off the water source, currently interpreted to be from an open natural fracture in the "toe" (or far end) of the horizontal trajectory. During the "long-term production" phase, which will follow after the EWT, formation water will likely be reinjected to maintain reservoir pressure and to minimise water disposal costs.

 

The HH-2z interventions are planned to commence in the New Year following completion of the ongoing HH-2z PBU and will be reported in due course.

 

Downhole pressure gauges also confirmed that HH-2z penetrated a near virgin pressure section of the Portland oil pool. This finding has likely positive implications for the magnitude of connected oil in place and recoverable reserves seen by the field's two wells. Determining the oil volume connected to HH-2z remains a key EWT objective.

 

Immediately following the current HH-2z shut-in, flow lines were reconnected to HH-1 and dry Kimmeridge oil flow was resumed on 18 December at an initial half-hourly rate of 354 barrels of oil per day ("bopd") with an average daily rate of 301 bopd.

 

A further test spread will now be connected to permit EWT production from both HH-1 and HH-2z.

 

Furthermore, upon establishment of stable oil flow from HH-2z, a short HH-1 intervention is also planned to further optimise both Kimmeridge and Portland test production from the vertical wellbore.

 

A field development plan ("FDP") was also submitted to the Oil and Gas Authority, seeking consent for the field's planned first "long-term production" phase which will follow the conclusion of the EWT. This phase will consist of two producing wells, HH-1 and HH-2z. Subsequent phases, involving further infill production wells and a possible water reinjection well, are planned to be submitted as FDP addenda in the coming year once longer-term well behaviour is more comprehensively understood.

 

UKOG holds a controlling 85.635% interest in the Horse Hill oil field and surrounding highly prospective PEDL137 and PEDL246 licences, which are operated by UKOG's subsidiary company, Horse Hill Developments Ltd.

 

Stephen Sanderson, UKOG's Chief Executive, commented:

 

"Although it's still early days in the EWT campaign, we are very encouraged by the magnitude of the initial flow rates. These confirm that HH-2z's horizontal trajectory can deliver flow rates from the Portland sweet-spot that significantly exceed those delivered by the HH-1 vertical discovery well.

 

Our team's efforts are now firmly focused upon the routine elimination of water ingress and the continued optimisation of HH-2z's near-wellbore, both of which are designed to ensure HH-2z can deliver the best possible stable oil production rates over the coming year.

 

Whilst there is still much to be done, these early results, together with the timely submission of the FDP to the OGA, mean we are well on the way to delivering significant production at Horse Hill."

 

Qualified Person's Statement

 

Matt Cartwright, UKOG's Commercial Director, who has over 36 years of relevant experience in the global oil industry, has approved the information contained in this announcement. Mr Cartwright is a Chartered Engineer and member of the Society of Petroleum Engineers.

 

For further information, please contact:

 

UK Oil & Gas PLC

Stephen Sanderson / Kiran Morzaria Tel: 01483 900582

 

WH Ireland Ltd (Nominated Adviser and Broker)

James Joyce / James Sinclair-Ford Tel: 020 7220 1666

 

Cenkos Securities PLC (Joint Broker)

Joe Nally / Neil McDonald Tel: 0207 397 8919

 

Novum Securities (Joint Broker)

John Bellis Tel: 020 7399 9400

 

Public Relations

Brian Alexander Tel: 01483 900582

 

Glossary

 

 

horizontal well

a well that during drilling is steered so as to follow and remain within a particular geological stratum or reservoir unit having a trajectory that runs approximately parallel to the top and or base of the target horizon

long-term production

stable oil production over the life of the well and or field during the 25 year Prodcution phase of the licence. The establishment of such production is subject to the OGA's consent of the Field Development Plan

oil field

an accumulation, pool or group of pools of oil in the subsurface that produces oil to surface

well test

or flow test involves testing a well by flowing hydrocarbons to surface, typically through a test separator; key measured parameters are oil and gas flow rates, downhole pressure and surface pressure. The overall objective is to identify the well's capacity to produce hydrocarbons at a commercial flow rate and volumes.

 

UKOG Licence Interests

 

The Company has interests in the following UK licences:

 

Asset

Licence

UKOG Interest

Licence Holder

Operator

Area (km2)

Status

Avington 1

PEDL070

5%

UKOG (GB) Limited

IGas Energy Plc

18.3

Field currently temporarily shut in

Broadford Bridge/Loxley/Godley Bridge 2, 3, 8

PEDL234

100%

UKOG (234) Ltd 4

UKOG (234) Ltd 4

300.0

BB-1/1z oil discovery, Loxley-1 gas appraisal well planning application submitted

A24 3

PEDL143

67.5%

UKOG

UKOG 7

91.8

Finalising new site selection to drill Portland and Kimmeridge prospects

Horndean 1

PL211

10%

UKOG (GB) Limited

IGas Energy Plc

27.3

Field in stable production

Horse Hill 5

PEDL137

85.635%

Horse Hill Developments Ltd 

Horse Hill Developments Ltd 

99.3

Production tests ongoing, HH-2/2z drilling completed

Horse Hill 5

PEDL246

85.635%

Horse Hill Developments Ltd 

Horse Hill Developments Ltd 

43.6

As above

Isle of Wight (Onshore) 2, 3

PEDL331

95%

UKOG

UKOG

200.0

Preparing planning submission for Arreton-3 oil appraisal well and Godshill exploration well

Markwells Wood

PEDL126

100%

UKOG (GB) Limited

UKOG (GB) Limited

11.2

MW-1 P&A

Notes:

 

1. Oil field currently in stable production.

2. Oil discovery pending development and/or appraisal drilling.

3. Exploration asset with drillable prospects and leads.

4. Contains the Broadford Bridge-1/1z Kimmeridge oil discovery, the eastern extension of the Godley Bridge Portland gas discovery, plus further undrilled Kimmeridge exploration prospects.

5. Portland and Kimmeridge Oil field with productive and commercially viable zones, EWT ongoing, production planning consent granted in September 2019, appraisal/development drilling campaign completed. Long term production start expected late 2019.

6. UKOG has a direct 77.9% interest in HHDL, which has a 65% interest in PEDL137 and PEDL246.

7. OGA consent received for the transfer of operatorship from Europa to UKOG

8. Gas discovery pending appraisal drilling and development with underlying Kimmeridge potential

 

The information contained within this announcement is deemed by the Company to constitute inside information under the Market Abuse Regulation (EU) No. 596/2014

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
MSCBCBDDUSDBGCD
Date   Source Headline
19th Apr 202411:59 amRNSLoan Reduction via Equity Share Subscription
2nd Apr 20247:00 amRNSAnnual Report for the year ended 30 September 2023
27th Mar 20247:00 amRNSLoxley Gas Project Update
19th Mar 20245:00 pmRNSBroadford Bridge Planning Update
13th Mar 20249:29 amRNSLoan Reduction via Equity Share Subscription
5th Mar 20243:28 pmRNSResult of Reconvened General Meeting
1st Mar 20247:00 amRNSRevised Timetable for Capital Restructuring
23rd Feb 20241:01 pmRNSNotice of General Meeting Resumption
22nd Feb 20244:37 pmRNSEmployee Benefit Trust Share Subscription
16th Feb 20241:54 pmRNSGeneral Meeting Adjournment
2nd Feb 20242:08 pmRNSPinarova-1 Testing Operations Update
1st Feb 20241:53 pmRNSProposed Capital Reorganisation
23rd Jan 20243:48 pmRNSLoan Balance Reduction via Equity Share Issue
23rd Jan 20247:00 amRNSPinarova-1 Testing Operations Commence
12th Jan 20247:00 amRNSSuccessful Placing
11th Jan 20247:00 amRNSTurkey: Pinarova-1 Testing
10th Jan 202411:39 amRNSEquity Share Issue and Reduction in Loan Balance
9th Jan 20242:00 pmRNSCourt of Appeal Upholds Loxley Planning Consent
3rd Jan 20241:04 pmRNSTurkey: Pinarova-1 Operations Re-Commence
15th Dec 20237:00 amRNSTurkey: Pinarova-1 Testing Update
12th Dec 20237:00 amRNSHorse Hill Work Programme Extended by NSTA
11th Dec 20237:00 amRNSHorse Hill Farmin Update
8th Dec 20237:00 amRNSHorse Hill Developments Update
21st Nov 20237:00 amRNSTurkey: Pinarova-1 Testing Latest
3rd Nov 202312:13 pmRNSEquity Share Issue
13th Oct 20237:00 amRNSTurkey: Pinarova-1 Testing Update
22nd Sep 20237:00 amRNSTurkey: Pinarova-1 Testing Update
3rd Aug 20238:01 amRNSLoxley High Court Update
20th Jul 202310:44 amRNSHigh Court upholds Loxley Planning Consent
13th Jul 20237:00 amRNSAvington Oil Production to Restart
28th Jun 20237:00 amRNS£3 million funding facility
26th Jun 20232:13 pmRNSUnaudited results six-month ended 31 March 2023
21st Jun 20237:00 amRNSHorse Hill Update
8th Jun 20237:00 amRNSLoxley High Court hearing
23rd May 20239:06 amRNSTurkey: Pinarova-1 Testing Update
5th May 202312:12 pmRNSResult of Annual General Meeting
3rd May 20237:00 amRNSTurkey: Pinarova-1 Update
25th Apr 202312:30 pmRNSHolding(s) in Company
25th Apr 202312:13 pmRNSTurkey: Pinarova-1 drilling ahead
24th Apr 20237:00 amRNSHolding(s) in Company
21st Apr 20238:40 amRNSTurkey: Pinarova-1 oil shows & testing
18th Apr 202311:51 amRNSTurkey: Pinarova-1 casing set
13th Apr 202312:56 pmRNSHolding(s) in Company
13th Apr 20239:39 amRNSTurkey: Pinarova-1 reaches first casing point
11th Apr 20237:05 amRNSNotice of Annual General Meeting
11th Apr 20237:00 amRNSTurkey: Pinarova-1 drilling commences
5th Apr 20234:51 pmRNSHolding(s) in Company
3rd Apr 20237:00 amRNS2022 Annual Report and Accounts
31st Mar 20234:44 pmRNSAnnual Accounts for year ended 30 September 2022
31st Mar 20237:00 amRNSTurkey: Pinarova-1 construction completed

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.