Watch the latest episode of focusIR Fireside Chats: Why Edinburgh Investment Trust Is Backing Turnaround Stocks for 2026 Growth. View here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksUK Oil & Gas Regulatory News (UKOG)

Share Price Information for UK Oil & Gas (UKOG)

Share Price is delayed by 15 minutes
Get Live Data
0.0095    0.00 (0.00%)
Bid:
0.009
Ask:
0.01
Spread: 0.001 (11.111%)
Market Cap: £2.69m
UKOG Live PriceLast checked at - London Stock Exchange

Intraday UK Oil & Gas Share Chart

HH-2z Horizontal Drilling Completed

12 Nov 2019 07:00

RNS Number : 0853T
UK Oil & Gas PLC
12 November 2019
 

UK Oil & Gas PLC

("UKOG" or the "Company")

 

Horse Hill Oil Field: HH-2z Horizontal Drilling Completed

 

UK Oil & Gas PLC (London AIM: UKOG) is pleased to announce the successful completion of its Horse Hill-2z ("HH-2z") Portland horizontal drilling campaign (UKOG 85.635% net controlling interest). A total of approximately 2,500 ft of horizontal trajectory was drilled wholly within the Portland reservoir's most oil productive zone or "sweet spot", around 70 times greater exposure to the sweet-spot than seen in the HH-1 Portland vertical discovery well. The campaign's key technical objectives have now all been successfully delivered.

 

The significantly increased exposure to the sweet-spot within HH-2z, the first horizontal well in the field's Portland oil pool, is the prime technical enabler for HH-2z to be capable of delivering significantly greater flow rates than those seen in the HH-1 vertical well.

 

The good, clean horizontal trajectory, together with the continued indications of possible improved reservoir quality and significantly lower pressure-depletion than expected, led the Company to decide that there was little technical or economic benefit in pursuing drilling to the maximum planned c. 3,000 ft horizontal trajectory.

 

Following yesterday's completion of a comprehensive electric logging programme, HH-2z is now being prepared for an extensive extended well test ("EWT") programme, expected to commence in the coming weeks. The EWT, which will include the use of a British designed high-capacity/high-rate downhole electric pump or "ESP", is planned over a minimum 90-day flow period, following which HH-2z and HH-1 will be retained and converted into long-term oil production wells.

 

Oil production from the HH-1 EWT has continued throughout HH-2/2z drilling and will also continue in parallel with the HH-2z EWT. Total HH-1 test production now stands at over 77,200 barrels.

 

Analysis and integration of the 240 ft of core, cuttings and electric log data suites acquired in both the HH-2 pilot and HH-2z horizontal continues. Any impactful results will be reported in due course.

 

UKOG holds a controlling 85.635% interest in the Horse Hill oil field and surrounding highly prospective PEDL137 and PEDL246 licences, which are operated by UKOG's subsidiary company, Horse Hill Developments Ltd.

 

Stephen Sanderson, UKOG's Chief Executive, commented:

 

"We are delighted to have safely and successfully delivered a significant 2,500 ft of horizontal section within the Portland reservoir's sweet-spot, the prime 35 ft zone containing the reservoir's most oil productive sandstones.

 

The significant horizontal trajectory, combined with the continued positive indications of increased reservoir quality and lower pressure-depletion, effectively negated any technical or economic need to attain the maximum planned c. 3,000 ft horizontal section. As a result, HH-2z remains optimally placed to be able to deliver its goal of significantly higher flow rates than the highly productive HH-1 vertical discovery.

 

We now look forward to the imminent flow test campaign, a key step towards delivering significant long-term production at Horse Hill."

 

Qualified Person's Statement

 

Matt Cartwright, UKOG's Commercial Director, who has over 36 years of relevant experience in the global oil industry, has approved the information contained in this announcement. Mr Cartwright is a Chartered Engineer and member of the Society of Petroleum Engineers.

 

For further information, please contact:

 

UK Oil & Gas PLC

Stephen Sanderson / Kiran Morzaria Tel: 01483 900582

 

WH Ireland Ltd (Nominated Adviser and Broker)

James Joyce / James Sinclair-Ford Tel: 020 7220 1666

 

Cenkos Securities PLC (Joint Broker)

Joe Nally / Neil McDonald Tel: 0207 397 8919

 

Novum Securities (Joint Broker)

John Bellis Tel: 020 7399 9400

 

Public Relations

Brian Alexander Tel: 01483 900582

 

Glossary

 

 

coring

a drilling technique that involves using a doughnut-shaped drilling bit to capture or "cut" a continuous cylinder-shaped sample of in-situ rock. The core is captured in a steel pipe or "core barrel" above the bit. Core is normally cut in 30 feet lengths, or multiples of 30 feet, and with a diameter of 3-4.5 inches. Core is taken in petroleum reservoir rocks for detailed laboratory analyses of geological, geochemical petrophysical and geomechanical properties

horizontal well

a well that during drilling is steered so as to follow and remain within a particular geological stratum or reservoir unit having a trajectory that runs approximately parallel to the top and or base of the target horizon

oil field

an accumulation, pool or group of pools of oil in the subsurface that produces oil to surface

well test

or flow test involves testing a well by flowing hydrocarbons to surface, typically through a test separator; key measured parameters are oil and gas flow rates, downhole pressure and surface pressure. The overall objective is to identify the well's capacity to produce hydrocarbons at a commercial flow rate and volumes.

 

UKOG Licence Interests

 

The Company has interests in the following UK licences:

 

Asset

Licence

UKOG Interest

Licence Holder

Operator

Area (km2)

Status

Avington 1

PEDL070

5%

UKOG (GB) Limited

IGas Energy Plc

18.3

Field currently temporarily shut in

Broadford Bridge/Loxley/Godley Bridge 2, 3, 8

PEDL234

100%

UKOG (234) Ltd 4

UKOG (234) Ltd 4

300.0

BB-1/1z oil discovery, Loxley-1 gas appraisal well planning application submitted

A24 3

PEDL143

67.5%

UKOG

UKOG 7

91.8

Finalising new site selection to drill Portland and Kimmeridge prospects

Horndean 1

PL211

10%

UKOG (GB) Limited

IGas Energy Plc

27.3

Field in stable production

Horse Hill 5

PEDL137

85.635%

Horse Hill Developments Ltd 

Horse Hill Developments Ltd 

99.3

Production tests ongoing, HH-2/2z drilling completed

Horse Hill 5

PEDL246

85.635%

Horse Hill Developments Ltd 

Horse Hill Developments Ltd 

43.6

As above

Isle of Wight (Onshore) 2, 3

PEDL331

95%

UKOG

UKOG

200.0

Preparing planning submission for Arreton-3 oil appraisal well and Arreton South exploration well

Markwells Wood

PEDL126

100%

UKOG (GB) Limited

UKOG (GB) Limited

11.2

MW-1 P&A

Notes:

 

1. Oil field currently in stable production.

2. Oil discovery pending development and/or appraisal drilling.

3. Exploration asset with drillable prospects and leads.

4. Contains the Broadford Bridge-1/1z Kimmeridge oil discovery, the eastern extension of the Godley Bridge Portland gas discovery, plus further undrilled Kimmeridge exploration prospects.

5. Portland and Kimmeridge Oil field with productive and commercially viable zones, EWT ongoing, production planning consent granted in September 2019, appraisal/development drilling campaign completed. Long term production start expected late 2019.

6. UKOG has a direct 77.9% interest in HHDL, which has a 65% interest in PEDL137 and PEDL246.

7. OGA consent received for the transfer of operatorship from Europa to UKOG

8. Gas discovery pending appraisal drilling and development with underlying Kimmeridge potential

 

The information contained within this announcement is deemed by the Company to constitute inside information under the Market Abuse Regulation (EU) No. 596/2014

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
DRLCKBDBABDKODD
Date   Source Headline
29th Jun 20267:00 amRNSUnaudited results for six-months end 31 March 2026
23rd Jun 202611:51 amRNSHolding(s) in Company
12th Jun 20267:00 amRNSSale of Horse Hill PEDL137 Interests
5th May 20267:30 amRNSRestoration - UK Oil & Gas Plc
5th May 20267:01 amRNSHorse Hill – Retrospective Planning Application
5th May 20267:00 amRNSAnnual Accounts for year ended 30 September 2025
1st Apr 20267:30 amRNSSuspension - UK Oil & Gas plc
1st Apr 20267:00 amRNSTemporary suspension of trading on AIM
25th Mar 20267:00 amRNSUKEn signs MOU with Wales & West Utilities
5th Feb 20267:00 amRNSBroadford Bridge Well Abandonment Completed
18th Dec 20254:07 pmRNSHolding(s) in Company
16th Dec 20253:22 pmRNSHolding(s) in Company
15th Dec 20254:35 pmRNSHolding(s) in Company
8th Dec 202510:13 amRNSHolding(s) in Company
8th Dec 202510:10 amRNSHolding(s) in Company
26th Nov 202510:57 amRNSHolding(s) in Company
24th Nov 20255:27 pmRNSHolding(s) in Company
21st Nov 20257:00 amRNSAdditional funding for UKEn Hydrogen projects
18th Nov 20256:04 pmRNSHolding(s) in Company
27th Oct 20257:00 amRNSHolding(s) in Company
24th Oct 202512:30 pmRNSHolding(s) in Company
15th Oct 20258:59 amRNSHolding(s) in Company
13th Oct 202512:11 pmRNSReplacement: Results six-month ended 31 March 2025
6th Oct 20257:00 amRNSFurther funding for UKEn Hydrogen projects
3rd Oct 202512:31 pmRNSAdditional funding for UKEn Hydrogen projects
2nd Oct 20257:00 amRNSSuccessful funding for UKEn Hydrogen projects
1st Oct 20258:45 amRNSUKEn signs MOU with National Gas
1st Oct 20257:30 amRNSRestoration - UK Oil & Gas Plc
30th Sep 20256:00 pmRNSResults for six-month period ended 31 March 2025
30th Sep 20256:00 pmRNSAnnual Accounts for year ended 30 September 2024
2nd Sep 202511:56 amRNSResult of General Meeting
8th Aug 20257:00 amRNSNotice of General Meeting
7th Aug 20257:00 amRNSEmployee Benefit Trust Share Subscription
29th Jul 20254:31 pmRNSAnnual Report and Accounts Publication Update
3rd Jul 20257:00 amRNSSale of UKOG (GB) Limited
30th Jun 20255:59 pmRNSDelay to the Publication of the Interim Results
15th Apr 20257:00 amRNSSignificant Horndean Reserves Increase
2nd Apr 202511:01 amRNSHolding(s) in Company
1st Apr 20257:30 amRNSSuspension - UK Oil & Gas plc
28th Mar 202512:59 pmRNSDelay in Annual Results and temporary suspension
17th Mar 20257:00 amRNSUK Economic Impact of Dorset H2 Storage
11th Mar 20257:00 amRNSDorset green hydrogen generation and import MOUs
21st Feb 20257:00 amRNSSuccessful Funding for South Dorset H2 Storage
10th Feb 20257:00 amRNSSignificant Horndean Production Increase
27th Jan 20257:00 amRNSUKEn South Dorset Hydrogen Storage Project Update
22nd Nov 20247:00 amRNSRetail Offer Results
19th Nov 20247:01 amRNSRetail Offer
19th Nov 20247:00 amRNSPlacing & Retail Offer to fund new H2 storage site
17th Sep 20247:00 amRNSBoard Appointment
9th Sep 20247:00 amRNSSolent Cluster Hydrogen Storage LOS

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.