We would love to hear your thoughts about our site and services, please take our survey here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksUk Oil & Gas Regulatory News (UKOG)

Share Price Information for Uk Oil & Gas (UKOG)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.0325
Bid: 0.03
Ask: 0.035
Change: 0.00 (0.00%)
Spread: 0.005 (16.667%)
Open: 0.0325
High: 0.0325
Low: 0.0325
Prev. Close: 0.0325
UKOG Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Licence Extensions on PEDL331 and PEDL143

20 Aug 2019 07:00

RNS Number : 5506J
UK Oil & Gas PLC
20 August 2019
 

 UK Oil & Gas PLC

("UKOG" or the "Company")

 

Licence Extensions on PEDL331 Arreton and PEDL143 "A24" Prospect

 

UK Oil & Gas PLC (London AIM: UKOG) is pleased to announce that the Oil and Gas Authority ("OGA") has granted two-year extensions to the initial terms of the Company's operated PEDL331 (UKOG 95%, Isle of Wight, Arreton oil discovery) and PEDL143 (UKOG 67.5%, northern Weald, "A24" prospect) licences. The initial terms will now end on 20 July 2023 (PEDL331) and 30 September 2022 (PEDL143), respectively. The Company expects that these extensions will permit its previously reported multiple well appraisal and exploration drilling campaign to be conducted and completed fully within both licences' initial term.

 

Isle of Wight PEDL331 "Arreton Oil Discovery"

 

The Isle of Wight PEDL331 Arreton licence is, in the Company's view, one of UKOG's premier appraisal stage assets, which, as per the Company's 2018 Competent Person's Report ("CPR"), contains 14.9 million barrels ("mmbbl") of UKOG net P50 case recoverable Contingent Resources within the Arreton oil discovery, plus a further 10 mmbbl of net recoverable Prospective Resources in the geological look-alike Arreton South and North prospects. Drilling of the Arreton-3/3z appraisal well and extended flow test is now scheduled to commence in Autumn 2020, subject to the grant of necessary regulatory consents. 

 

As further set out in the Company's 2018 Re-Admission document, the Arreton South and North prospects contain aggregate P50 Portland oil in place of 77.2 mmbbl, more than twice as much as the Company's flagship Horse Hill Portland oil field (UKOG 85.635% interest). Further significant upside in both prospects is calculated to lie within the underlying Inferior Oolite sequence.

 

UKOG's subsurface team have also recently identified a further large undrilled anticlinal structure, the Arreton East Prospect, another look-alike to the Arreton discovery and lying further to the east along the same geological trend. Initial mapping shows this feature to be many times larger than both the Arreton oil discovery and Arreton South prospect combined. Further work and potential recoverable resources will be reported in due course.

 

Following completion of Arreton-3/3z, the Company currently plans to proceed directly to drill Arreton South, and if regulatory permissions are in place, to proceed directly to drill Arreton East in the winter of 2020/21. Autumn/Winter drilling is designed deliberately to avoid the island's tourist season.

 

PEDL143 "A24" Prospect

 

The licence lies immediately to the west of the Company's Horse Hill licences (UKOG 85.635%) and contains the significant "A24" Portland and Kimmeridge oil prospect, a direct geological look-alike to the Company's Horse Hill oil field, situated on-trend some 8km to the east. Several smaller prospects of similar size to the nearby Brockham Portland oil field have also been identified. Multiple potential new drilling sites outside the nearby Area of Outstanding Natural Beauty are under evaluation and drilling is now scheduled to follow directly after the completion of the Company's 9-well 2019/2020 drilling programme, subject to the grant of necessary regulatory approvals.

 

Stephen Sanderson, UKOG's Chief Executive, commented:

 

"These extensions, on key appraisal and exploration assets, will permit UKOG to carry out its stated multi-well drilling campaign within the initial term of both licences. The identification of a further large undrilled Portland structure on trend with the Arreton oil discovery makes the Isle of Wight asset even more attractive than before and fully justifies our increase in ownership of PEDL331."

 

Qualified Person's Statement

Matt Cartwright, UKOG's Commercial Director, who has over 35 years of relevant experience in the global oil industry, has approved the information contained in this announcement. Mr Cartwright is a Chartered Engineer and member of the Society of Petroleum Engineers.

 

 

For further information, please contact:

 

UK Oil & Gas PLC

Stephen Sanderson / Kiran Morzaria Tel: 01483 900582

 

WH Ireland Ltd (Nominated Adviser and Broker)

James Joyce / James Sinclair-Ford Tel: 020 7220 1666

 

Cenkos Securities PLC (Joint Broker)

Joe Nally / Neil McDonald Tel: 0207 397 8919

 

Novum Securities (Joint Broker)

John Bellis Tel: 020 7399 9400

 

Public Relations

Brian Alexander Tel: 01483 900582

 

Glossary

 

 

Contingent Resources

those quantities of petroleum estimated, as of a given date, to be potentially recoverable from known accumulations, but the applied project(s) are not yet considered mature enough for commercial development due to one or more contingencies. Contingent Resources may include, for example, projects for which there are currently no viable markets, or where commercial recovery is dependent on technology under development, or where evaluation of the accumulation is insufficient to clearly assess commerciality. Contingent Resources are further categorised in accordance with the level of certainty associated with the estimates and may be sub-classified based on project maturity and/or characterised by their economic status

discovery

a petroleum accumulation for which one or several exploratory wells have established through testing, sampling and/or logging the existence of a significant quantity of potentially moveable hydrocarbons

extended well test

a well test, as per the permission granted by the Oil and Gas Authority, with an aggregate flow period duration over each zone of greater than 96 hours; the objective being to establish whether a discovery is commercially viable and the optimal methods of future production and recovery

oil in place

the quantity of oil or petroleum that is estimated to exist originally in naturally occurring accumulations before any extraction or production

P50

a 50% probability that a stated volume will be equalled or exceeded

prospect

a project associated with a potential accumulation that is sufficiently well defined to represent a viable drilling target

Prospective Resources

those quantities of petroleum estimated, as of a given date, to be potentially recoverable from undiscovered accumulations by application of future development projects. Prospective Resources have both an associated chance of discovery and chance of development

oil field

an accumulation, pool or group of pools of oil in the subsurface that produces oil to surface

well test

or flow test involves testing a well by flowing hydrocarbons to surface, typically through a test separator; key measured parameters are oil and gas flow rates, downhole pressure and surface pressure. The overall objective is to identify the well's capacity to produce hydrocarbons at a commercial flow rate.

 

UKOG Licence Interests

 

The Company has interests in the following UK licences:

 

Asset

Licence

UKOG Interest

Licence Holder

Operator

Area (km2)

Status

Avington 1

PEDL070

5%

UKOG (GB) Limited

IGas Energy Plc

18.3

Field currently temporarily shut in

Broadford Bridge/Loxley/Godley Bridge 2, 3, 8

PEDL234

100%

UKOG (234) Ltd 4

UKOG (234) Ltd 4

300.0

BB-1/1z oil discovery, Loxley-1 gas appraisal well planning application submitted

A24 3

PEDL143

67.5%

UKOG

UKOG 7

91.8

Finalising new site selection to drill Portland and Kimmeridge prospects

Horndean 1

PL211

10%

UKOG (GB) Limited

IGas Energy Plc

27.3

Field in stable production

Horse Hill 5

PEDL137

85.635%

Horse Hill Developments Ltd 

Horse Hill Developments Ltd 

99.3

Production tests ongoing, two further appraisal wells scheduled for 2019

Horse Hill 5

PEDL246

85.635%

Horse Hill Developments Ltd 

Horse Hill Developments Ltd 

43.6

As above

Isle of Wight (Onshore) 2, 3

PEDL331

95%

UKOG

UKOG

200.0

Preparing planning submission for Arreton-3 oil appraisal well and Arreton South exploration well

Markwells Wood

PEDL126

100%

UKOG (GB) Limited

UKOG (GB) Limited

11.2

MW-1 P&A

Notes:

 

1. Oil field currently in stable production.

2. Oil discovery pending development and/or appraisal drilling.

3. Exploration asset with drillable prospects and leads.

4. Contains the Broadford Bridge-1/1z Kimmeridge oil discovery, the eastern extension of the Godley Bridge Portland gas discovery plus further undrilled Kimmeridge exploration prospects.

5. Oil field with three productive and commercially viable zones, EWT ongoing, further drilling campaign scheduled, development underway subject to grant of planning consent expected in Q3 2019.

6. UKOG has a direct 77.9% interest in HHDL, which has a 65% interest in PEDL137 and PEDL246.

7. OGA consent received for the transfer of operatorship from Europa to UKOG

8. Gas discovery pending appraisal drilling and development with underlying Kimmeridge potential

 

The information contained within this announcement is deemed by the Company to constitute inside information under the Market Abuse Regulation (EU) No. 596/2014

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
MSCMMGMRNLGGLZM
Date   Source Headline
19th Apr 202411:59 amRNSLoan Reduction via Equity Share Subscription
2nd Apr 20247:00 amRNSAnnual Report for the year ended 30 September 2023
27th Mar 20247:00 amRNSLoxley Gas Project Update
19th Mar 20245:00 pmRNSBroadford Bridge Planning Update
13th Mar 20249:29 amRNSLoan Reduction via Equity Share Subscription
5th Mar 20243:28 pmRNSResult of Reconvened General Meeting
1st Mar 20247:00 amRNSRevised Timetable for Capital Restructuring
23rd Feb 20241:01 pmRNSNotice of General Meeting Resumption
22nd Feb 20244:37 pmRNSEmployee Benefit Trust Share Subscription
16th Feb 20241:54 pmRNSGeneral Meeting Adjournment
2nd Feb 20242:08 pmRNSPinarova-1 Testing Operations Update
1st Feb 20241:53 pmRNSProposed Capital Reorganisation
23rd Jan 20243:48 pmRNSLoan Balance Reduction via Equity Share Issue
23rd Jan 20247:00 amRNSPinarova-1 Testing Operations Commence
12th Jan 20247:00 amRNSSuccessful Placing
11th Jan 20247:00 amRNSTurkey: Pinarova-1 Testing
10th Jan 202411:39 amRNSEquity Share Issue and Reduction in Loan Balance
9th Jan 20242:00 pmRNSCourt of Appeal Upholds Loxley Planning Consent
3rd Jan 20241:04 pmRNSTurkey: Pinarova-1 Operations Re-Commence
15th Dec 20237:00 amRNSTurkey: Pinarova-1 Testing Update
12th Dec 20237:00 amRNSHorse Hill Work Programme Extended by NSTA
11th Dec 20237:00 amRNSHorse Hill Farmin Update
8th Dec 20237:00 amRNSHorse Hill Developments Update
21st Nov 20237:00 amRNSTurkey: Pinarova-1 Testing Latest
3rd Nov 202312:13 pmRNSEquity Share Issue
13th Oct 20237:00 amRNSTurkey: Pinarova-1 Testing Update
22nd Sep 20237:00 amRNSTurkey: Pinarova-1 Testing Update
3rd Aug 20238:01 amRNSLoxley High Court Update
20th Jul 202310:44 amRNSHigh Court upholds Loxley Planning Consent
13th Jul 20237:00 amRNSAvington Oil Production to Restart
28th Jun 20237:00 amRNS£3 million funding facility
26th Jun 20232:13 pmRNSUnaudited results six-month ended 31 March 2023
21st Jun 20237:00 amRNSHorse Hill Update
8th Jun 20237:00 amRNSLoxley High Court hearing
23rd May 20239:06 amRNSTurkey: Pinarova-1 Testing Update
5th May 202312:12 pmRNSResult of Annual General Meeting
3rd May 20237:00 amRNSTurkey: Pinarova-1 Update
25th Apr 202312:30 pmRNSHolding(s) in Company
25th Apr 202312:13 pmRNSTurkey: Pinarova-1 drilling ahead
24th Apr 20237:00 amRNSHolding(s) in Company
21st Apr 20238:40 amRNSTurkey: Pinarova-1 oil shows & testing
18th Apr 202311:51 amRNSTurkey: Pinarova-1 casing set
13th Apr 202312:56 pmRNSHolding(s) in Company
13th Apr 20239:39 amRNSTurkey: Pinarova-1 reaches first casing point
11th Apr 20237:05 amRNSNotice of Annual General Meeting
11th Apr 20237:00 amRNSTurkey: Pinarova-1 drilling commences
5th Apr 20234:51 pmRNSHolding(s) in Company
3rd Apr 20237:00 amRNS2022 Annual Report and Accounts
31st Mar 20234:44 pmRNSAnnual Accounts for year ended 30 September 2022
31st Mar 20237:00 amRNSTurkey: Pinarova-1 construction completed

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.