Less Ads, More Data, More Tools Register for FREE

Pin to quick picksTertiary Minerals Regulatory News (TYM)

Share Price Information for Tertiary Minerals (TYM)

Share Price is delayed by 15 minutes
Get Live Data
0.0525    -0.005 (-8.70%)
Bid:
0.05
Ask:
0.055
Spread: 0.005 (10.00%)
Market Cap: £2.71m
TYM Live PriceLast checked at - London Stock Exchange

Intraday Tertiary Minerals Share Chart

Pyramid Gold Project - Update

18 Feb 2020 07:00

RNS Number : 2608D
Tertiary Minerals PLC
18 February 2020
 

18 February 2020

Tertiary Minerals plc ("Tertiary" or "the Company")

Pyramid Gold Project - Update

Tertiary Minerals plc is pleased to provide the following update on its plans to drill test the Pyramid Gold Project in Nevada, USA.

Pyramid Project Highlights

 

·; Drill contract tenders received and preferred contractor identified

 

·; Drone photogrammetric survey completed to control drilling and future exploration

 

·; Initial drilling will seek to confirm priority epithermal vein drill target:

 

Ø Drill hole PYR 9 - intersected visible gold and assayed 1.52m grading 17.8 g/t Au from 94.5m down hole

 

Ø PYR 9 ended in 1.52m grading 2.6 g/t Au at 115.8m depth

 

 

Commenting today, Managing Director, Richard Clemmey said:

"We are pleased to be reporting good progress with the groundwork leading up to the first drill hole on the Pyramid Gold Project in Nevada where we are looking to confirm and expand upon successful historic exploration results."

"The deposit provides an exciting gold target where our team has recently identified analogies with the high-grade multi-million-ounce gold deposits at the Midas and Fire Creek mines in Nevada. We look forward to updating the market in due-course on the proposed drilling."

Detailed Information

Preliminary details of the Pyramid Gold Project were contained in the Company's announcement of 28 May 2019.

In preparation for drilling at the Pyramid project the Company has received tenders from a number of drilling companies and a preferred drilling contractor has been selected. In addition, the Company has selected a consulting geologist with a background in the evaluation of epithermal gold deposits in Nevada to supervise the drilling and to log and sample drill core.

In order to provide accurate spatial control for drilling and other exploration the Company has completed a detailed drone photogrammetric survey and prepared detailed photogrammetric imagery of the entire project area.

The Company is targeting high-grade epithermal style gold mineralisation at Pyramid and will initially seek to confirm the results of drilling carried out by Battle Mountain Exploration Company in 1989 when a single drill hole, PYR 9, drilled intersected high-grade gold mineralisation and visible gold with 1.52m grading 17.8 g/t Au from 94.5m down hole.

As a part of its initial evaluation of the Pyramid Project the Company has carried out further geological research and historical data compilation. This has identified compelling analogies between the setting of the Pyramid drill target and the high-grade multi-million-ounce gold deposits at the Midas and Fire Creek mines in Nevada now operated by the Hecla Mining Company after its 2018 acquisition of Klondex Mines Ltd.

At Fire Creek bonanza gold grades occur in narrow veins in structural zones associated with and along the margins of pre-mineralisation mafic dykes. Previous mapping by Battle Mountain at Pyramid shows that target mineralisation occurs in a similar position alongside a dyke-like intrusion of andesite. It is considered that these dykes mark zones of deep-seated structural weakness that have been exploited as pathways for the gold mineralising hydrothermal fluids.

The high grade intersection in PYR 9 at Pyramid occurs within a broader zone of low-grade mineralisation continued to the end of the hole at 115.8m where the last 1.52m sample graded 2.6 g/t Au and the last 21.4m of the hole graded an average of 1.5 g/t gold. Similar low-grade halo gold mineralisation is found at Fire Creek (open pit mineral resource 74.6mt grading 1.0 g/t).

The further potential of the mineralisation associated with PYR 9 is indicated by its association with a significant gold-arsenic-mercury soil geochemical anomaly that has so far been outlined over a strike length of 650m and is open ended. The Company's mining claims cover more than 500 acres of ground.

A plan showing the features described in this release is available on the Company's website at https://www.tertiaryminerals.com/projects/other-projects/pyramid

For more information please contact:

Tertiary Minerals plc:

Richard Clemmey, Managing Director

+44 (0) 1625 838 679

Patrick Cheetham, Chairman

SP Angel Corporate Finance LLP

Nominated Adviser and Broker

Richard Morrison

+44 (0) 203 470 0470

Caroline Rowe

 

 

Notes:

1. The information in this release has been compiled and reviewed by Mr. Patrick Cheetham (MIMMM, MAusIMM) who is a qualified person for the purposes of the AIM Note for Mining and Oil & Gas Companies. Mr. Cheetham is a Member of the Institute of Materials, Minerals & Mining and also a member of the Australasian Institute of Mining & Metallurgy.

 

 

Market Abuse Regulation (MAR) Disclosure

Certain information contained in this announcement would have been deemed inside information for the purposes of Article 7 of Regulation (EU) No 596/2014 until the release of this announcement.

 

Notes to Editors

Tertiary Minerals plc (ticker symbol 'TYM') is an AIM-traded mineral exploration and development company building a multi-commodity project portfolio.

 

CAUTIONARY NOTICE

The news release may contain certain statements and expressions of belief, expectation or opinion which are forward looking statements, and which relate, inter alia, to the Company's proposed strategy, plans and objectives or to the expectations or intentions of the Company's directors. Such forward-looking statements involve known and unknown risks, uncertainties and other important factors beyond the control of the Company that could cause the actual performance or achievements of the Company to be materially different from such forward-looking statements. Accordingly, you should not rely on any forward-looking statements and save as required by the AIM Rules for Companies or by law, the Company does not accept any obligation to disseminate any updates or revisions to such forward-looking statements.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
DRLGPUPWPUPUGQM
Date   Source Headline
26th May 20167:01 amRNSPlacing, Issue of Equity & Total Voting Rights
26th May 20167:00 amRNSHalf-Yearly Report 2016
12th Apr 201611:48 amRNSHolding(s) in Company
31st Mar 201610:43 amRNSTotal Voting Rights
29th Mar 20162:20 pmRNSStoruman Mine Permit Appeals
14th Mar 20167:00 amRNSIssue of Equity, Warrants and Director Dealing
8th Mar 201611:00 amRNSIssue of New Ordinary Shares & Total Voting Rights
8th Mar 201611:00 amRNSIssue of Equity by Sunrise Resources PLC
2nd Mar 20167:00 amRNSStoruman Mining Permit Update
19th Feb 201610:26 amRNSResult of AGM
18th Feb 20161:48 pmRNSApproval of Mining Permit Storuman
16th Feb 20167:00 amRNSDrilling Report
26th Jan 20162:26 pmRNSDirector Dealing
12th Jan 20167:00 amRNSPublication of Report and Accounts / Notice of AGM
31st Dec 20157:00 amRNSDirector's dealings
14th Dec 20157:00 amRNSAudited Results for the year to 30 September 2015
4th Dec 20157:00 amRNSMB Drilling and Storuman Fluorspar Project Update
30th Oct 20157:00 amRNSTotal Voting Rights
6th Oct 201511:00 amRNSPlacing, Issue of Equity & Total Voting Rights
27th Aug 20153:03 pmRNSDirector Dealing, Issue of Equity and TVR
30th Jul 201512:25 pmRNSDirector Dealing, Issue of Equity,TVR & Correction
17th Jun 20157:00 amRNSMB Project JORC Mineral Resource Estimate Increase
4th Jun 20154:58 pmRNSDirector Dealing
20th May 20157:00 amRNSHalf Yearly Report
31st Mar 20154:14 pmRNSPlacing, Issue of Equity & Total Voting rights
19th Mar 20153:09 pmRNSDirector's Dealing
12th Mar 20157:00 amRNSDirector Dealing
9th Mar 201510:40 amRNSExercise of Warrants, Issue of Equity and TVR
27th Feb 20154:30 pmRNSTotal Voting Rights
23rd Feb 20153:05 pmRNSDirector's Dealings, Warrants, TVR & Correction
23rd Feb 20153:04 pmRNSDirector's Dealings, Warrants, TVR & Correction
23rd Feb 20157:00 amRNSTertiary Minerals Presenting
19th Feb 20157:00 amRNSMB Project - Final Results for Phase 3 Drilling
11th Feb 20157:00 amRNSMB Project - Further Significant Drilling Results
5th Feb 20154:30 pmRNSResult of AGM
5th Feb 20157:00 amRNSAGM Presentation
22nd Jan 20157:00 amRNSMB Project-Further Significant Analytical Results
9th Jan 20152:40 pmRNSAnnual Report and AGM
18th Dec 20147:00 amRNSMB Project - Significant Analytical Results
12th Dec 20147:00 amRNSAudited Results for the year to 30 September 2014
27th Nov 201412:10 pmRNSReplacement - Phase 3 Drilling Update
27th Nov 20147:00 amRNSPhase 3 Drilling Update
19th Nov 20149:45 amRNSPhase 3 Drilling Programme Update
29th Oct 20147:00 amRNSPhase 3 Drilling Programme Update
2nd Oct 20147:00 amRNSChange of Adviser
1st Oct 201410:55 amRNSIssue of Warrants
18th Sep 201412:02 pmRNSWarrant Extension
16th Sep 20147:00 amRNSMB Fluorspar Project - Drilling Programme awarded
10th Sep 20147:00 amRNSDirector Dealing & Issue of Equity
28th Aug 20147:00 amRNSUpdated Corporate Presentation

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.