Less Ads, More Data, More Tools Register for FREE

Pin to quick picksTertiary Minerals Regulatory News (TYM)

Share Price Information for Tertiary Minerals (TYM)

Share Price is delayed by 15 minutes
Get Live Data
0.0525    -0.005 (-8.70%)
Bid:
0.05
Ask:
0.055
Spread: 0.005 (10.00%)
Market Cap: £2.71m
TYM Live PriceLast checked at - London Stock Exchange

Intraday Tertiary Minerals Share Chart

Phase 3 Drilling Update

27 Nov 2014 07:00

RNS Number : 1263Y
Tertiary Minerals PLC
27 November 2014
 



 

 

Tertiary Minerals PLC ("Tertiary" or "Company")

27 November 2014

MB Fluorspar Project

Multiple thick fluorspar mineralised intervals in deep step-out hole

Tertiary Minerals plc, the AIM traded company building a strategic position in the fluorspar sector, is pleased to provide its initial conclusions based on preliminary analytical results from the first drill hole in its Phase 3 drilling programme at the MB fluorspar project in Nevada, USA.

Highlights:

· Hole 14TMBRC027 drilled to 516 metres depth, 700 metres west from existing Mineral Resource boundary

 

· Results indicate multiple thick intersections of significant1 fluorspar (CaF2) mineralisation

 

· Main fluorspar mineralised intersections ranging from 3 metres to more than 40 metres in thickness - between 60m from surface to over 360m deep

 

· Results indicate the potential to increase the size of the MB fluorspar deposit

 

· 57 additional claims, 1,128 acres, have been staked by the Company

 

The Company concludes that is not appropriate to release the detailed analytical results at this point as Quality Assurance and Quality Control checks at a second laboratory have returned results outside of acceptable limits. Nevertheless, the results, after factoring for the current analytical uncertainties, are of a magnitude and of such significance as to support the above, preliminary, conclusions.

All drill samples from this hole will be re-submitted for check analysis to a third laboratory and final results will be released in due course.

Commenting today, Managing Director, Richard Clemmey said: "We are very pleased to be reporting the preliminary findings from this important deep step-out hole. The results and observations suggest that the existing large JORC (2012) compliant Mineral Resource Estimate can be increased in the future. We look forward to releasing the final results in due course."

 

Enquiries

 

Tertiary Minerals plc

Patrick Cheetham, Executive Chairman 

Richard Clemmey, Managing Director

 

 

 

+44 (0)845 868 4580

SP Angel Corporate Finance LLP

Nominated Adviser & Joint Broker

Ewan Leggat

Katy Birkin

 

+44 (0) 20 3470 0470

 

Beaufort Securities Ltd

Joint Broker

Saif Janjua

 

 

+44 (0)20 7382 8300

Yellow Jersey PR Limited

Dominic Barretto

Kelsey Traynor

+44 (0)7768 537 739

 

Detailed Information

 

Fluorine analysis

 

Determination of the quantity of fluorite (CaF2) present in a rock is based on analysis of the contained fluorine. Analysis of fluorine is considered to be difficult due to its volatility or tendency to vaporise at relatively low temperatures. For this reason there are only a limited number of analytical techniques which can be utilised and less than a handful of laboratories globally who are competent in fluorine analysis. It is therefore important that the Company applies strict protocols for the sampling and analysis of fluorspar samples together with stringent quality assurance/control checks (QA/QC).

 

Samples from hole 14TMBRC027 were submitted to a primary ISO accredited laboratory for analysis whilst selected duplicate check samples were submitted to a second ISO accredited laboratory as part of the Company's QA/QC procedure in order to check analytical accuracy of the primary laboratory. The results received indicate that the fluorine analysis from the primary laboratory may be over reporting in comparison to the secondary check laboratory. Consequently the Company is not in a position to report these results until further check analyses have been carried out. All samples will now be re-submitted along with QA/QC check samples to a third laboratory.

 

Notwithstanding the lower reported values reported from the second laboratory - and taking these into account - the Company considers the results are highly significant given the multiple thick intersections of significant1 fluorspar mineralisation from hole 14TMBRC027 in a location 700 metres to the west of the known JORC 2012 defined Mineral Resource.

 

Project Background

The MB Project claims are located in an area of good infrastructure 19km southwest of the County town of Eureka in central Nevada, USA. Nevada is long recognised as one of the most attractive mining jurisdictions in the world.

Since acquiring the project in late 2012 the Company has moved quickly to progress the following project milestones completed to date:

· February 2013 - Independent Tonnage Grade Estimate

· August 2013 - Phase 1 drilling programme

· November 2013 - Phase 2 drilling programme

· April 2014 - maiden JORC 2012 compliant Mineral Resource Estimate

· November 2014 - Phase 3 drilling programme

Full details of the completed work programmes and results have been previously reported by the Company.

Phase 3 Drilling, Hole 14TMBRC027

 

Hole 14TMBRC027, a vertical hole, is located more than 700m to the west of the existing Mineral Resource boundary and, at 516m, is the deepest hole the Company has drilled on the MB project to date. A map showing the location of the completed Phase 3 drill holes is available on the Company's website at:

http://www.tertiaryminerals.com/projects/fluorspar-projects/mb-fluorspar-nevada-usa

The key objectives for drilling this hole were to:

1. Test the lateral extent of fluorspar mineralisation to the west of the existing Mineral Resource

2. Test the depth of fluorspar mineralisation

3. Target potential higher grade fluorspar closer to the source of mineralisation

The preliminary results indicate that that objectives 2 and 3 have been successfully achieved. The multiple thick intersections, continuing at depth, of significant1 fluorspar mineralisation 700m to the west of the existing Mineral Resource indicates the potential to increase the size of the current defined large JORC2 2012 compliant Mineral Resource Estimate of 38.4 million tonnes grading 10.4% fluorspar (CaF2). The Company will report on objective 3 above once the check fluorspar analyses have been received.

Due to the demonstrated potential of extending the resource to the west of the existing Mineral Resource the Company has now staked an additional 57 claims on the project covering a further 1,128 acres.

Foot Notes

1. Significant fluorspar (CaF2) mineralisation is defined by the Company as a minimum three metre drill intersection above 8% fluorspar (CaF2) cut-off. This cut off is currently applied for reporting of the drill results from MB project as this is the cut-off used for the most recent Mineral Resource estimate. However, in the context of reporting drill results it does not imply an economic cut off. An economic cut-off will depend on many factors and will not be determined until feasibility studies, if warranted, are carried out.

 

2. JORC is the Australian Code for the reporting of exploration results, Mineral Resources and Ore Reserves prepared by the Joint Ores Reserves Committee (JORC) of the Australasian Institute of Mining and Metallurgy, Australian Institute of Geoscientists and the Minerals Council of Australia.

 

3. The information in this release has been compiled and reviewed by Mr. Richard Clemmey (BSc, CEng, MIQ, MIMMM, ARSM) who is a qualified person for the purposes of the AIM Note for Mining and Oil & Gas Companies dated June 2009. Mr Clemmey is a Chartered Engineer and a Member of the Institute of Materials, Minerals & Mining.

 

Notes to Editors

Tertiary Minerals plc (ticker symbol 'TYM') is an AIM-quoted mineral exploration and development company building a significant strategic position in the fluorspar sector. Fluorspar is an essential raw material in the chemical, steel and aluminium industries. Tertiary controls two significant Scandinavian projects (Storuman in Sweden and Lassedalen in Norway) and a large deposit of strategic significance in Nevada USA (MB Project).

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLBFBMTMBITTII
Date   Source Headline
4th Jun 20267:00 amRNSPlacing and Proposed Subscription for £1,000,000
15th May 20268:37 amRNSCorrection to Grant of Warrants RNS
5th May 20267:34 amRNSOperations Update, Zambia
20th Apr 20267:00 amRNS-RInvestor Presentation via Investor Meet Company
17th Apr 20261:50 pmRNSGrant of Warrants
17th Apr 202612:00 pmRNSHolding(s) in Company
30th Mar 20267:00 amRNSJORC Compliant Exploration Target - Mushima North
20th Mar 202611:46 amRNSResults of Annual General Meeting
19th Mar 202612:30 pmRNSResult of AGM
20th Feb 20263:32 pmRNSHolding(s) in Company
20th Feb 20267:00 amRNSAnnual Report for the Year Ended 30 September 2025
17th Feb 20267:00 amRNSAudited Results for Year Ended 30 September 2025
4th Feb 20267:00 amRNSHighest Grade Ag-Cu at Target A1, Mushima North
2nd Feb 202612:19 pmRNSHolding(s) in Company
6th Jan 20269:03 amRNSHolding(s) in Company
17th Dec 20257:00 amRNSBoard Change
16th Dec 20257:00 amRNSIntent to Produce Target for Cu-Ag, Mushima North
28th Nov 202510:08 amRNSTotal Voting Rights
13th Nov 20253:42 pmRNSDirector/PDMR Shareholding
13th Nov 20257:00 amRNSDrilling Update at Target A1, Mushima North
7th Nov 20252:11 pmRNSCLN Facility to Expand Exploration Programme
5th Nov 20259:37 amRNSDrilling Commences at Target A1
31st Oct 202511:04 amRNSTotal Voting Rights
31st Oct 20257:00 amRNSUpcoming Phase 3 Drill Programme at Target A1
30th Oct 20257:00 amRNSKobold to advance Konkola West Project Agreement
28th Oct 20257:00 amRNSAppointment of Corporate Broker
20th Oct 20257:00 amRNSPlacing to raise £100,000
9th Oct 20257:00 amRNS-RProject Focus: Target A1, Mushima North, Zambia
3rd Oct 20253:47 pmRNSHolding(s) in Company
2nd Oct 20254:07 pmRNSHolding(s) in Company
1st Oct 20257:21 amRNSHighest grade Ag-Cu at Target A1, Mushima North
24th Sep 20257:00 amRNSDrill holes show silver - Target A1, Mushima North
10th Sep 202512:29 pmRNSHolding(s) in Company
3rd Sep 20253:42 pmRNSHolding(s) in Company
2nd Sep 20257:00 amRNSPhase 2 Drilling Results: Target A1, Mushima North
11th Aug 20257:00 amRNSCompletion of Phase 2 at Target A1 - Mushima North
31st Jul 20251:42 pmRNSTotal Voting Rights
25th Jul 202510:09 amRNSHolding(s) in Company
25th Jul 20258:30 amRNSHolding(s) in Company
21st Jul 20257:00 amRNSDrilling Commences at Target A1 - Mushima North
8th Jul 20257:00 amRNSUpcoming Drill Programme - Mushima North, Zambia
4th Jul 20259:45 amRNSHolding(s) in Company
1st Jul 202511:31 amRNSDirectors’ Subscriptions
30th Jun 202510:13 amRNSTotal Voting Rights
27th Jun 20252:00 pmRNSHalf-Yearly Report 2025
25th Jun 20257:00 amRNSUpdate: Konkola West Copper Project, Zambia
23rd Jun 20258:53 amRNSHolding(s) in Company
19th Jun 20257:00 amRNS-RProject Focus: Jacks Copper Project, Zambia
17th Jun 20259:27 amRNSHolding(s) in Company
16th Jun 20253:07 pmRNSHolding(s) in Company

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.