Less Ads, More Data, More Tools Register for FREE

Pin to quick picksTertiary Minerals Regulatory News (TYM)

Share Price Information for Tertiary Minerals (TYM)

Share Price is delayed by 15 minutes
Get Live Data
0.0525    -0.005 (-8.70%)
Bid:
0.05
Ask:
0.055
Spread: 0.005 (10.00%)
Market Cap: £2.71m
TYM Live PriceLast checked at - London Stock Exchange

Intraday Tertiary Minerals Share Chart

Drilling Report

10 Mar 2005 09:27

Tertiary Minerals PLC10 March 2005 TERTIARY MINERALS PLC SECOND PHASE DRILLING AT KAARESSELKA EXTENDS HIGHER GRADE GOLD MINERALISATION AT DEPTH • Best Intersection Of 20.1g/t Gold Over 1.75m Within 8.25m Section Of 4.9g/t • Gold mineralization Considered To Be Open Laterally And In Depth • Drilling In Progress At Pitkajarvi , Geophysics Completed At Nottrask Tertiary Minerals plc ("Tertiary" or "the Company") is pleased to report theresults of a second phase of drilling at its Kaaresselka gold project inNorthern Finland. The program, carried out between November 2004 and January 2005, was designed totest the depth extent of high-grade gold mineralisation in the Vanha lode, thesouth-eastern extension of the Tienvarsi lode and high-grade near-surfacemineralisation at Lampi. Five holes were drilled for a total of 750m and a smallprogramme of trenching was carried out at Lampi. Vanha Previous drilling at Vanha intersected gold mineralisation at relatively shallowdepths (e.g. 4.9m grading 11.0 g/t gold in hole 04KD007B and 8.2m grading 6.1 g/t gold in hole R412) Four additional holes (04KD011, 04KD012, 04KD013 and 05KD002) were completed atan average 50m spacing to test for mineralisation at a vertical depth of100-150m. All holes intersected gold mineralization and significantintersections are summarised in the accompanying table. The higher-grade mineralization is narrow, but the results confirm that themineralization at Vanha is continuing, and remains open at depth over astrike-length of at least 200m. It is open both to the east and west. Alongitudinal projection illustrating drill intersections will shortly beavailable on the Company's website.(http://www.tertiaryminerals.com/projects-europe.htm). The structure hosting the mineralisation at Vanha is at least 600m long and upto 60m wide. Tienvarsi One hole, 05KD001, was drilled to test the eastern extension of the Tienvarsizone, some 165m from its known limits. A narrow interval of gold mineralizationwas found in a weathered breccia on the south side of the Tienvarsi magneticlineament. HOLE NUMBER DOWN HOLE INTERSECTED THICKNESS(m) GOLD GRADE FROM (m) TO (m) (grammes/tonne) VANHA 04KD011 163.40 166.10 2.70 3.8inc. 165.10 166.10 1.00 8.9 04KD012 113.60 114.35 0.75 3.3 04KD013 130.00 138.25 8.25 4.9inc. 136.50 138.25 1.75 20.1 05KD002 114.60 114.90 0.30 8.4 And 128.95 129.65 0.70 18.3 And 152.55 158.75 6.20 3.2inc. 152.55 154.75 2.20 7.2 And 162.10 163.00 0.90 7.5 TIENVARSI 05KD001 36.75 37.90 1.15 2.6 KAARESELKA DRILL SUMMARY - MARCH 2005 N.B. True widths estimated at approximately 50% of reported intersected widths. Lampi Trenching at Lampi targeted mineralisation in hole 04KD010 (10.3m grading 3.88g/t gold from bedrock surface beneath the glacial till). Gold mineralisation wasfound to be associated with a localised breccia with no significant strikelength. Consequently, no follow-up drilling was carried out at Lampi. The variability in grade and thickness at Kaaresselka is typical ofstructurally hosted gold mineralization where an understanding of the controlsof mineralization is critical to the success of exploration. Further evaluationof the results is now in progress. The Company is, however, encouraged by theresults obtained to-date, and by the widespread distribution of gold over anarea of 1.1km by 0.6km at KaaresselkTM?. Elsewhere in Finland, Tertiary is currently drilling at its PitkTM?jTM?rvi goldprospect in central Finland trying to discover the source of surface boulderscontaining gold and copper-cobalt mineralization. The programme will becompleted in two weeks time and results are expected by mid April. The Company has, this week, also completed an extensive programme of groundgeophysics at its NottrTM?sk project in Sweden to identify drill targets fornickel-copper and platinum group metals. Results are being interpreted, and willbe announced shortly. Further Info: Patrick Cheetham, Executive Chairman, Tertiary Minerals plc. Tel: +44 (0)1625-626203 Ron Marshman/John Greenhalgh, City of London PR Limited. Tel: +44 (0) 20-7628-5518 This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
23rd Nov 20129:15 amRNSNon-Core Projects Update
15th Oct 20127:00 amRNSPosting of Corporate Presentation on Website
3rd Sep 20127:00 amRNSNew Fluorspar Project Acquisition
20th Aug 20127:00 amRNSLassedalen Fluorspar Project
23rd Jul 20127:00 amRNSIssue of Equity
11th Jul 20127:00 amRNSProject and Market Update
18th Jun 20127:00 amRNSEquity Finance Facility Secured
18th May 20127:00 amRNSHalf Yearly Report
9th May 20127:00 amRNSDirectorate Change
25th Apr 20123:53 pmRNSPublication of Presentation
4th Apr 20127:00 amRNSLASSEDALEN FLUORSPAR PROJECT
2nd Apr 20127:00 amRNSProgress Update
8th Mar 20127:00 amRNSInvestor Evening
27th Feb 20129:19 amRNSResult of AGM
26th Jan 201210:31 amRNSGrant of Warrants
18th Jan 20127:00 amRNSLassedalen - Mineral Resource Estimate
13th Jan 20127:00 amRNSAnnual Financial Report
15th Dec 20117:00 amRNSFinal Results
31st Oct 20117:00 amRNSPositive Drilling Results
1st Sep 20117:00 amRNSAppointment of Project Manager
20th Jul 20117:00 amRNSDrilling and Testwork Update
21st Jun 20117:00 amRNSStoruman Fluorspar Project Update
23rd May 20117:00 amRNSHalf Yearly Report
16th May 20117:00 amRNSLassedalen Fluorspar Project Update
18th Apr 20117:00 amRNSDrill Update - Finland Gold Project
31st Mar 20117:00 amRNSStoruman - Mineral Resource Estimate
22nd Feb 201112:09 pmRNSDirs Dealings/Ex of Options/Total Voting Rights
15th Feb 20117:00 amRNSDrilling Results - Storuman Fluorspar Project
31st Jan 20115:06 pmRNSResult of AGM
27th Jan 20117:00 amRNSDrilling Update - Storuman Project
17th Jan 20117:00 amRNSDrilling Programme
22nd Dec 201012:29 pmRNSNotice of AGM
20th Dec 20109:16 amRNSGrant of Warrants
16th Dec 20107:00 amRNSPLACING, ISSUE OF EQUITY & TOTAL VOTING RIGHTS
8th Dec 20107:00 amRNSFinal Results
17th Nov 20107:00 amRNSDrilling Update
28th Sep 20107:00 amRNSDrilling Commences
14th Sep 20107:00 amRNSFluorspar Project Update
20th Jul 201012:54 pmRNSIssue of Equity/Director's Dealing
8th Jul 20107:00 amRNS2nd European Fluorspar Project
6th Jul 20107:00 amRNSPositive Scoping Study, Storuman Fluorspar Project
24th May 20101:23 pmRNSHalf Yearly Report
12th Mar 20107:00 amRNSProject Updates
26th Feb 20101:52 pmRNSTotal Voting Rights
1st Feb 20102:26 pmRNSDirector/PDMR Shareholding
29th Jan 20104:17 pmRNSResult of AGM
8th Dec 20097:00 amRNSGrant of Warrants
7th Dec 20093:13 pmRNSFinal Results
17th Nov 20097:00 amRNSStoruman Tonnage/Grade Estimate
11th Sep 20097:00 amRNSUpdate re Vahajoki Project

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.