The next focusIR Investor Webinar takes places on 14th May with guest speakers from Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund. Please register here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksTertiary Minerals Regulatory News (TYM)

Share Price Information for Tertiary Minerals (TYM)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.10
Bid: 0.09
Ask: 0.11
Change: 0.00 (0.00%)
Spread: 0.02 (22.222%)
Open: 0.10
High: 0.10
Low: 0.10
Prev. Close: 0.10
TYM Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Progress Update

2 Apr 2012 07:00

RNS Number : 5326A
Tertiary Minerals PLC
02 April 2012
 



 

Tertiary Minerals Plc

 

("Tertiary" or "the Company")

2 April 2012

 

Building a Strategic Position in the Fluorspar Sector

 

Progress Update

 

Tertiary Minerals plc, is pleased to provide the following update on the progress of work at its two flagship fluorspar projects, Storuman in Sweden and Lassedalen in Norway, and to advise on recent market developments and strategic objectives.

 

Background

 

Tertiary Minerals plc (AIM:TYM) is one of a few publicly traded companies offering investors strategic exposure to the little known, but critically important industrial mineral, fluorspar (CaF2), the main source of fluorine (F) for industry.

 

About 6 million tonnes of fluorspar are used annually, mainly in the manufacture of hydrofluoric acid (HF) and derivative fluorine chemicals including refrigerant gases (fluorocarbons), fluoropolymers (e.g. Teflon™), and aluminium trifluoride (a flux used in the reduction of alumina to aluminium). There are also a number of smaller but nonetheless important uses for fluorine - for example as LiPF6 electrolyte in Lithium-ion batteries, via UF6 in the manufacture of nuclear fuel, in petroleum cracking and in pharmaceuticals where over 50% of new drugs include fluorine in their formulations.

 

Storuman Fluorspar Project, Sweden

 

At Storuman the Company is engaged in a preliminary feasibility study for a 28 million tonnes open pittable fluorspar resource targeting production of 100,000 tonnes per year of acid grade fluorspar (>97% CaF2 and less than 1% silica). A mining operation of this scale would be a medium scale producer in World terms and the deposit is large enough to consider expansion of production in future.

 

Metallurgical testwork

Preliminary feasibility stage metallurgical testwork has been progressing for some months now on both the Upper and Lower mineralised zones. Excellent results have been obtained from the Upper Zone (approx. 40% of deposit) where fluorspar meeting the above acid grade chemical specifications has been produced with very high recoveries (>90%). Work is currently focused on the Lower Zone (approx. 60% of deposit) where good recoveries have been obtained at a finer grind size and where current work aims to improve recovery at coarser product sizing which can be an important specification for some fluorspar consumers.

 

Preliminary Feasibility Study Progress

Consultants have been selected for the various aspects of the prefeasibility study, including geotechnical, hydrogeological and tailings disposal studies. A transport and logistics study is being coordinated by the Company with support and input from the Swedish Government funded Nordic Logistics Centre. A new railhead facility has been built near Storuman with a direct link to the wharf at Umeå port and this export facility should result in significant transport and capital costs savings for the Company.

 

All tenders have now been received for the main part of the preliminary feasibility study which will draw together the external component studies and include the main mine design, engineering design, capital and operating costs estimation. This major study will be awarded shortly and should be completed around the end of this year.

 

Permitting

Environmental permitting of mining operations in Sweden requires a two year baseline sampling programme. This started last year and archaeological and reindeer herding and other socio-environmental studies are also in progress with the objective to submit a mining lease application by the end of the first quarter of 2013 and the environmental permit application by second quarter of 2013.

 

Mine construction is targeted to start in 2015.

 

Lassedalen Fluorspar, Norway.

 

The Lassedalen project hosts a JORC compliant underground-minable resource of 4 million tonnes grading 25% CaF2. It is located in an area of well-established infrastructure 80km southwest of Oslo.

 

Metallurgical Testwork

The Company is nearing completion of a scoping-level programme of metallurgical testwork. This is progressing well and, from results received to date, expectations are that the project will be able to produce the higher grade, higher value, acid grade of fluorspar with good recoveries.

 

Scoping Study

The Company has received tenders for the completion of a technical and economic scoping study and this will be awarded shortly. The Company is preparing an application for a government grant to co-finance a parallel study for ore-processing operations at the large HerØya industrial complex where existing utilities and tailings disposal opportunities could enhance project economics and permitting. Completion of the scoping study is scheduled for the middle of 2012.

 

Following completion of the scoping study a large drill programme is planned to upgrade and increase the existing Mineral Resource.

 

Market Developments & Strategic Objectives

 

For decades China has been the dominant supplier of fluorspar to western markets but in recent years Chinese exports have fallen substantially as China has grown its internal demand in the manufacture of downstream fluorine products. China, now the World's largest consumer of fluorspar, is likely to become a net importer in the next few years. It is likely that China will meet the bulk of any domestic supply deficit from Mongolia, a growing producer of fluorspar which, for western export markets, already transits through China. Even now the geographical focus of Chinese fluorspar consumption (HF plants) is shifting away from the southern provinces towards the Mongolian border.

 

Demand for fluorspar is growing with the rising demand for refrigerators, air conditioners, and cars, especially in the BRIC countries. Consumption of fluorspar is rising by at least 1.5% per year at present which requires the equivalent of at least one new mid-size mining operation to be developed every year for the foreseeable future - yet only a handful of projects are at the advanced exploration or planning stages.

 

Western consumers of fluorspar, many of whom do not have captive sources of fluorspar, now face structural supply shortages. European consumption of fluorspar is second only to China and the European Commission has published a report placing fluorspar on the "critical list" of 14 minerals considered essential to European industry and, for which supply shortages are foreseen.

 

The supply squeeze has caused fluorspar prices to rise. In 2011, fluorspar prices rose as much as 69% in 2011 to a high of over US$600/tonne for Chinese material delivered into Europe. In the past few months prices of Chinese fluorspar have stabilised at US$500-530/tonne, 45% above prices this time last year. Prices for Mexican fluorspar have continued to rise.

 

The Company does not believe that western consumers of fluorspar will be able to rely on Chinese or even the growing Mongolian supplies in future. This is driving the Company's strategy and objectives:

 

• to become a reliable long term supplier of fluorspar, supporting the fluorine chemical supply chain through development of fluorspar mining projects in stable, democratic and mining friendly jurisdictions;

 

• to become Europe's largest fluorspar producer through development of the Storuman projects in Sweden & the Lassedalen deposit in Norway, and.

 

• to capitalise on current & future fluorspar supply shortages.

 

The Company is planning further fluorspar project acquisitions that are consistent with this strategy.

 

As the fluorspar market tightens there is a growing trend to vertical integration in the fluorine industry with the large chemical consumers seeking to tie up future sources of raw material supply. This is happening both in China and in the West.

 

Consistent with this trend, the Company is in on-going discussions with a number of consumers seeking to secure access to new sources of supply and, potentially, long term business relationships with the Company. These could take the form of marketing agreements and/or investment in the Company and/or projects in future. The Board will consider such arrangements providing they add value for shareholders.

 

Commenting on the current developments, Patrick Cheetham, Executive Chairman, said "This year promises to be a busy and exciting year for the Company and we expect strong news flow from a number of value-adding milestones. We look forward to updating shareholders on further developments in due course."

 

 

ENQUIRIES:

 

Tertiary Minerals plc Tel: +44 (0)845 868 4580

Patrick Cheetham, Executive Chairman

www.tertiaryminerals.com

 

 

Seymour Pierce Limited Tel: +44 (0)20 7107 8000

Stewart Dickson (Corporate Finance)

Jeremy Stephenson (Corporate Broking)

 

Yellow Jersey PR Limited Tel: +44 (0)7768 537 739

Dominic Barretto

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCBKKDDABKDCNN
Date   Source Headline
2nd May 20247:00 amRNSExploration Update – Brunton Pass Project, Nevada
16th Apr 20242:00 pmRNSDrilling - Konkola West Copper Project, Zambia
9th Apr 20249:48 amRNSDrill Start - Konkola West Copper Project, Zambia
29th Feb 20247:00 amRNSTotal Voting Rights
26th Feb 20247:00 amRNSAgreement with Mwashia Resources
15th Feb 20242:31 pmRNSGrant of Warrants
15th Feb 20249:41 amRNSComplete Results of AGM
14th Feb 20242:19 pmRNSResult of AGM
6th Feb 20241:58 pmRNSUpdate: KoBold's New Mingomba Copper Discovery
18th Jan 202410:00 amRNSAnnual Report & Notice of Annual General Meeting
15th Jan 202410:15 amRNSAudited Results for Year Ended 30 September 2023
19th Dec 20239:20 amRNSCompany Presentation via Investor Meet Company
19th Dec 20237:00 amRNSEarn-In Agreement - Konkola West Project, Zambia
30th Nov 20237:00 amRNSKonkola West Copper Project, Zambia
6th Nov 20237:00 amRNSProject Update, Zambia
1st Nov 20237:00 amRNSPlacing to raise £150,000
16th Oct 20237:00 amRNSNew Soil Sampling Results - Mushima North, Zambia
5th Oct 20237:00 amRNSFirst Soil Sampling Results - Mushima North
25th Sep 20237:00 amRNSTerm Sheet for Agreement - Konkola West, Zambia
12th Sep 202310:04 amRNSProvisional Soil Sampling Results - Mukai Project
7th Sep 20237:00 amRNSGovernment Decision - Storuman Project, Sweden
6th Sep 20237:00 amRNSGovernment Decision - Storuman Project, Sweden
24th Aug 20237:00 amRNSUpdated Company Presentation
10th Aug 20237:00 amRNSExploration Update – Zambia
3rd Aug 20233:09 pmRNSUK Government Press Release Supports Zambia Growth
31st Jul 20237:00 amRNSForest Permits Received - Mukai & Mushima North
13th Jun 20237:00 amRNSNew Exploration Licence – Zambia
6th Jun 20237:00 amRNSExploration Update - Konkola West, Zambia
1st Jun 20237:00 amRNSProject Focus – Mushima North Project, Zambia
30th May 20232:40 pmRNSHALF-YEARLY REPORT 2023
17th May 20232:02 pmRNSExploration Update – Lubuila Copper Project
28th Apr 20237:00 amRNSAnalytical Results - Mushima North Copper Project
20th Apr 202310:00 amRNSExploration Update – Lubuila Copper Project
13th Apr 20232:45 pmRNSPlacing to raise £250,000
5th Apr 202310:30 amRNSProject Focus - Mukai Project, Zambia
9th Mar 202311:05 amRNSSecond Price Monitoring Extn
9th Mar 202311:00 amRNSPrice Monitoring Extension
17th Feb 20233:52 pmRNSGrant of Warrants
16th Feb 202311:39 amRNSResult of AGM
16th Feb 20237:00 amRNSChairman’s AGM Statement
14th Feb 20233:46 pmRNSHolding(s) in Company
3rd Feb 20238:20 amRNSPlacing to raise £300,000
18th Jan 20237:00 amRNSPositive Lab Results, Jacks Copper Project, Zambia
16th Jan 20237:00 amRNSEPB Approved Mushima North Copper Project, Zambia
12th Jan 20237:00 amRNSProject Focus - Konkola West, Zambia
22nd Dec 20227:00 amRNSAnnual Report & Notice of Annual General Meeting
12th Dec 20227:00 amRNSAudited Results for Year Ended 30 September 2022
25th Nov 20227:00 amRNSUpdate - Copper Projects, Zambia
8th Nov 20227:00 amRNSExploration Update - Jacks Copper Project, Zambia
4th Nov 202210:52 amRNSJacks Copper Project Zambia - JV Agreement

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.