Less Ads, More Data, More Tools Register for FREE

Pin to quick picksTertiary Minerals Regulatory News (TYM)

Share Price Information for Tertiary Minerals (TYM)

Share Price is delayed by 15 minutes
Get Live Data
0.0525    -0.005 (-8.70%)
Bid:
0.05
Ask:
0.055
Spread: 0.005 (10.00%)
Market Cap: £2.71m
TYM Live PriceLast checked at - London Stock Exchange

Intraday Tertiary Minerals Share Chart

Drilling Report

10 Mar 2005 09:27

Tertiary Minerals PLC10 March 2005 TERTIARY MINERALS PLC SECOND PHASE DRILLING AT KAARESSELKA EXTENDS HIGHER GRADE GOLD MINERALISATION AT DEPTH • Best Intersection Of 20.1g/t Gold Over 1.75m Within 8.25m Section Of 4.9g/t • Gold mineralization Considered To Be Open Laterally And In Depth • Drilling In Progress At Pitkajarvi , Geophysics Completed At Nottrask Tertiary Minerals plc ("Tertiary" or "the Company") is pleased to report theresults of a second phase of drilling at its Kaaresselka gold project inNorthern Finland. The program, carried out between November 2004 and January 2005, was designed totest the depth extent of high-grade gold mineralisation in the Vanha lode, thesouth-eastern extension of the Tienvarsi lode and high-grade near-surfacemineralisation at Lampi. Five holes were drilled for a total of 750m and a smallprogramme of trenching was carried out at Lampi. Vanha Previous drilling at Vanha intersected gold mineralisation at relatively shallowdepths (e.g. 4.9m grading 11.0 g/t gold in hole 04KD007B and 8.2m grading 6.1 g/t gold in hole R412) Four additional holes (04KD011, 04KD012, 04KD013 and 05KD002) were completed atan average 50m spacing to test for mineralisation at a vertical depth of100-150m. All holes intersected gold mineralization and significantintersections are summarised in the accompanying table. The higher-grade mineralization is narrow, but the results confirm that themineralization at Vanha is continuing, and remains open at depth over astrike-length of at least 200m. It is open both to the east and west. Alongitudinal projection illustrating drill intersections will shortly beavailable on the Company's website.(http://www.tertiaryminerals.com/projects-europe.htm). The structure hosting the mineralisation at Vanha is at least 600m long and upto 60m wide. Tienvarsi One hole, 05KD001, was drilled to test the eastern extension of the Tienvarsizone, some 165m from its known limits. A narrow interval of gold mineralizationwas found in a weathered breccia on the south side of the Tienvarsi magneticlineament. HOLE NUMBER DOWN HOLE INTERSECTED THICKNESS(m) GOLD GRADE FROM (m) TO (m) (grammes/tonne) VANHA 04KD011 163.40 166.10 2.70 3.8inc. 165.10 166.10 1.00 8.9 04KD012 113.60 114.35 0.75 3.3 04KD013 130.00 138.25 8.25 4.9inc. 136.50 138.25 1.75 20.1 05KD002 114.60 114.90 0.30 8.4 And 128.95 129.65 0.70 18.3 And 152.55 158.75 6.20 3.2inc. 152.55 154.75 2.20 7.2 And 162.10 163.00 0.90 7.5 TIENVARSI 05KD001 36.75 37.90 1.15 2.6 KAARESELKA DRILL SUMMARY - MARCH 2005 N.B. True widths estimated at approximately 50% of reported intersected widths. Lampi Trenching at Lampi targeted mineralisation in hole 04KD010 (10.3m grading 3.88g/t gold from bedrock surface beneath the glacial till). Gold mineralisation wasfound to be associated with a localised breccia with no significant strikelength. Consequently, no follow-up drilling was carried out at Lampi. The variability in grade and thickness at Kaaresselka is typical ofstructurally hosted gold mineralization where an understanding of the controlsof mineralization is critical to the success of exploration. Further evaluationof the results is now in progress. The Company is, however, encouraged by theresults obtained to-date, and by the widespread distribution of gold over anarea of 1.1km by 0.6km at KaaresselkTM?. Elsewhere in Finland, Tertiary is currently drilling at its PitkTM?jTM?rvi goldprospect in central Finland trying to discover the source of surface boulderscontaining gold and copper-cobalt mineralization. The programme will becompleted in two weeks time and results are expected by mid April. The Company has, this week, also completed an extensive programme of groundgeophysics at its NottrTM?sk project in Sweden to identify drill targets fornickel-copper and platinum group metals. Results are being interpreted, and willbe announced shortly. Further Info: Patrick Cheetham, Executive Chairman, Tertiary Minerals plc. Tel: +44 (0)1625-626203 Ron Marshman/John Greenhalgh, City of London PR Limited. Tel: +44 (0) 20-7628-5518 This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
21st Aug 201412:38 pmRNSDirectors Share Holding - Correction Announcement
20th Aug 20145:57 pmRNSDirectors Share Issue and Total Voting Rights
30th Jul 20147:00 amRNSChange of Auditor
11th Jul 20147:00 amRNSPlacing & Issue of Equity
2nd Jul 20147:00 amRNS"Exploitation Permit Application"
19th May 20147:00 amRNSHalf Yearly Report
24th Apr 20147:00 amRNSStmnt re Share Price Movement
16th Apr 20147:00 amRNSMaiden JORC Compliant Mineral Resource Estimate
15th Apr 20148:14 amRNSDraw Down of Funds and Issue of Equity
19th Mar 201412:38 pmRNSHolding(s) in Company
10th Mar 20147:00 amRNSDrilling Results and Contract Award
25th Feb 20149:01 amRNSIssue of Equity
20th Feb 20147:00 amRNSResult of AGM
19th Feb 20147:00 amRNSUpdate of Corporate Presentation
17th Jan 20147:00 amRNSPosting of Annual Report and Notice of AGM
15th Jan 201411:58 amRNSIssue of Warrants
14th Jan 20149:40 amRNSExercise of Options - Issue of Equity and TVR
13th Jan 20147:00 amRNSMB Fluorspar Project Drilling Results
18th Dec 20137:00 amRNSMB Fluorspar Project - Drill Results
12th Dec 20133:45 pmRNSAudited Results for the year to 30 September 2013
13th Nov 20133:00 pmRNSHolding(s) in Company
13th Nov 201311:55 amRNSHolding(s) in Company
12th Nov 20137:01 amRNSDirectorate Change
12th Nov 20137:00 amRNSClose of Equity Swap Agreement
11th Sep 20137:00 amRNSMB Fluorspar Project Update
20th Aug 20132:58 pmRNSUpdated Company Presentation
20th Aug 20137:00 amRNSProject Update
14th Aug 20137:00 amRNSAppointment of Joint Broker
10th Jul 20137:00 amRNSMB Project Update
27th Jun 20133:22 pmRNSHolding(s) in Company
27th Jun 20133:21 pmRNSHolding(s) in Company
18th Jun 20137:00 amRNSDirector/PDMR Shareholding
30th May 201310:35 amRNSCorporate interview available online
24th May 20137:00 amRNSSubscription for Ordinary Shares and Equity Swap
14th May 20137:00 amRNSHalf Yearly Report
9th May 20137:00 amRNSMB Fluorspar Project - Update
22nd Mar 201311:25 amRNSDirector/PDMR Shareholding
18th Mar 20137:00 amRNSExercise of Options - Issue of Equity & TVR
8th Mar 20139:39 amRNSIssue of Equity and Total Voting Rights
6th Mar 20137:00 amRNSDraw Down of Funds & Issue of Equity
5th Mar 20137:00 amRNSChange of Adviser
19th Feb 20134:17 pmRNSResult of AGM
12th Feb 20137:00 amRNSMB Project Tonnage Grade Estimate
31st Jan 201311:13 amRNSUpdate - MB Fluorspar Project, Nevada USA
11th Jan 20137:00 amRNSIssue of Warrants / Director Shareholding
21st Dec 201211:37 amRNSDraw Down of Funds and Issue of Equity
14th Dec 20127:00 amRNSContract for Tonnage-Grade Estimate
13th Dec 20127:00 amRNSFinal Results
30th Nov 20127:00 amRNSPublication of Presentation
29th Nov 20127:00 amRNSMB Project Review Defines Fluorspar Deposit

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.