Less Ads, More Data, More Tools Register for FREE

Pin to quick picksTertiary Minerals Regulatory News (TYM)

Share Price Information for Tertiary Minerals (TYM)

Share Price is delayed by 15 minutes
Get Live Data
0.0525    -0.005 (-8.70%)
Bid:
0.05
Ask:
0.055
Spread: 0.005 (10.00%)
Market Cap: £2.71m
TYM Live PriceLast checked at - London Stock Exchange

Intraday Tertiary Minerals Share Chart

MB Project Tonnage Grade Estimate

12 Feb 2013 07:00

RNS Number : 6447X
Tertiary Minerals PLC
12 February 2013
 



 

Tertiary Minerals plc

 ("the Company") 

12 February 2013

 

Tonnage-Grade Estimate - MB Fluorspar Project, Nevada USA

 

Tertiary Minerals plc, the AIM traded company building a strategic position in the fluorspar sector, is pleased to advise that independent consultant Wardell Armstrong International Ltd (WAI) has reported its Tonnage-Grade Estimate for the Company's MB Fluorspar Project in Nevada, USA, and classified this as an Exploration Target under the 1JORC Code (2004).

 

Highlights:

 

·; Tonnage-grade range estimated at 85-105 million tonnes grading 9-11% fluorspar (CaF2) at 8% CaF2 cut-off.

 

·; Exploration Target is part of a larger mineralised system estimated at 395-615 million tonnes grading 5-7% fluorspar at 2% CaF2 cut-off.

 

·; WAI recommends staged drilling programme to upgrade Exploration Target to JORC compliant Mineral Resource.

 

WAI has evaluated the historic results from 108 drill holes completed by various companies between 1960 and 1984, details of which were reported in the Company's announcement of 29 November 2012. The estimate suggests potential for definition of at least 8 million tonnes of contained fluorspar which is double the combined amount of fluorspar estimated for the Company's Minerals Resource inventory at its more advanced Scandinavian fluorspar projects, at Storuman (Sweden) and Lassedalen (Norway).

 

Commenting today, Executive Chairman Patrick Cheetham said: "We are delighted to confirm the world class potential of the MB Project. The Directors believe that this is the first time the historical drilling data has been brought together into a comprehensive tonnage-grade estimate using rigorous estimation methods. The mineralised system is very large. It is open at depth and laterally over much of the drill area and most of the drilling is shallow. There is considerable potential to increase the size of the economically interesting mineralisation and in particular the higher grade sections which will be the focus of our initial drill programmes."

 

ENQUIRIES:

 

Tertiary Minerals plc Tel: +44 (0)845 868 4580

Patrick Cheetham, Executive Chairman

 

Seymour Pierce Tel: +44 (0)20 7107 8000

Stewart Dickson/Julian Erleigh (Corporate Finance)

Jeremy Stephenson/Jacqui Briscoe (Corporate Broking)

 

VSA Capital Limited Tel: +44 (0)20 3005 5000

James Pinner (Corporate Finance)

Andrew Monk (Corporate Broking)

 

Yellow Jersey PR Limited Tel: +44 (0)20 3664 4087

Dominic Barretto/Anna Legge

 

Detailed Information

 

The MB Project claims are located in an area of good infrastructure, 19km southwest of the County town of Eureka in central Nevada, USA. Nevada is long recognised as one of the most attractive mining jurisdictions in the world.

 

Fluorspar mineralisation occurs as a thick flat lying replacement of limestone beneath a cap of generally unmineralised quartzite of variable thickness. Further details are available in the Company's announcement of 29 November 2012.

 

The WAI report was commissioned and announced on 14 December 2012. As anticipated WAI has reported its tonnage-grade estimate as an Exploration Target rather than a Mineral Resource using the recommended terminology of the JORC Code (2004) as, whilst there is a considerable volume of exploration data, much of the drilling is unevenly distributed and the drill assay records could not be verified to the high level of confidence required for calculation of a Mineral Resource under the JORC Code (2004).

 

The "Exploration Target" is estimated at 85-105 million tonnes grading 9-11% fluorspar (CaF2) at an 8% CaF2 cut-off and occurs as part of a larger mineralised system estimated at 395-615 million tonnes grading 5-7% fluorspar at a 2% CaF2 cut-off.

 

This estimate was made by wireframing of the mineralisation at a cut-off grade of 2% CaF2 and by block modelling, interpolation using an inverse distance squared technique and the application of an 8% cut-off to the block model.

 

The lower end of the WAI tonnage range estimates are based on a wireframe constrained laterally and at depth by the spatial limits of mineralisation within drill holes and extending no further than the peripheral mineralised drill holes (whether or not the mineralisation is open laterally or at depth). The upper end of the tonnage range estimates are based on a separate wireframe that includes some conservative lateral projection of mineralisation where it is open along strike but does not contain any significant projection of the higher grade areas of the mineralisation where it is open at depth. Consequently the Company believes that the extensions to the higher grade mineralisation could be significantly larger than that currently modelled and being reported.

 

The grade ranges of the estimates are centred on block model grades estimated for the mineralisation at the given cut-offs and reflect an allowance for uncertainty in the reliability of historical assay data and assay methods.

 

The Company considers that, although drill holes are wide-spaced over much of the drill area, the mineralisation has good lateral continuity and significant depth potential and it is therefore the Company's expectation that a large part of the WAI Exploration Target can be converted into a Mineral Resource in accordance with the JORC Code (2004) by further infill drilling within the area of the existing drilling.

 

Furthermore, the Company believes that there is considerable potential for additional tonnage of higher grade mineralisation below the currently modelled depth extents.

 

 

Footnotes;

 

1. The JORC Code (2004) is the Australasian Code for the reporting of exploration results, Mineral Resources and Ore Reserves prepared by the Joint Ores Reserves Committee (JORC) of the Australasian Institute of Mining & Metallurgy, Australian Institute of Geoscientists and the Minerals Council of Australia.

 

2. As required under Clause 18 of the JORC Code (2004) (Reporting of Exploration Results), the following statement is made regarding the WAI MB Project Exploration Target "The potential quantity and grade is conceptual in nature. There has been insufficient exploration to define a Mineral Resource and it is uncertain if further exploration will result in the determination of a Mineral Resource".

 

3. The information in this release has been compiled and reviewed by Mr. Patrick Cheetham (MIMMM, MAusIMM) who is a qualified person for the purposes of the AIM Note for Mining and Oil & Gas Companies dated June 2009. Mr Cheetham is a Member of the Institute of Materials, Minerals & Mining and also a member of the Australasian Institute of Mining & Metallurgy.

 

 

Notes to Editors

 

Tertiary Minerals plc (ticker symbol 'TYM') is an AIM-quoted mineral exploration and development company building a significant strategic position in the fluorspar sector. Fluorspar is an essential raw material in the chemical, steel and aluminium industries. The Company controls two significant Scandinavian projects (Storuman in Sweden and Lassedalen in Norway) and a major deposit of strategic significance in Nevada, USA (MB Project).

 

The US Government considers fluorspar to be a strategic mineral. There is a large market for fluorspar in the USA and around the Pacific Rim, but currently no significant US production.

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCTBMRTMBABBJJ
Date   Source Headline
4th Jun 20267:00 amRNSPlacing and Proposed Subscription for £1,000,000
15th May 20268:37 amRNSCorrection to Grant of Warrants RNS
5th May 20267:34 amRNSOperations Update, Zambia
20th Apr 20267:00 amRNS-RInvestor Presentation via Investor Meet Company
17th Apr 20261:50 pmRNSGrant of Warrants
17th Apr 202612:00 pmRNSHolding(s) in Company
30th Mar 20267:00 amRNSJORC Compliant Exploration Target - Mushima North
20th Mar 202611:46 amRNSResults of Annual General Meeting
19th Mar 202612:30 pmRNSResult of AGM
20th Feb 20263:32 pmRNSHolding(s) in Company
20th Feb 20267:00 amRNSAnnual Report for the Year Ended 30 September 2025
17th Feb 20267:00 amRNSAudited Results for Year Ended 30 September 2025
4th Feb 20267:00 amRNSHighest Grade Ag-Cu at Target A1, Mushima North
2nd Feb 202612:19 pmRNSHolding(s) in Company
6th Jan 20269:03 amRNSHolding(s) in Company
17th Dec 20257:00 amRNSBoard Change
16th Dec 20257:00 amRNSIntent to Produce Target for Cu-Ag, Mushima North
28th Nov 202510:08 amRNSTotal Voting Rights
13th Nov 20253:42 pmRNSDirector/PDMR Shareholding
13th Nov 20257:00 amRNSDrilling Update at Target A1, Mushima North
7th Nov 20252:11 pmRNSCLN Facility to Expand Exploration Programme
5th Nov 20259:37 amRNSDrilling Commences at Target A1
31st Oct 202511:04 amRNSTotal Voting Rights
31st Oct 20257:00 amRNSUpcoming Phase 3 Drill Programme at Target A1
30th Oct 20257:00 amRNSKobold to advance Konkola West Project Agreement
28th Oct 20257:00 amRNSAppointment of Corporate Broker
20th Oct 20257:00 amRNSPlacing to raise £100,000
9th Oct 20257:00 amRNS-RProject Focus: Target A1, Mushima North, Zambia
3rd Oct 20253:47 pmRNSHolding(s) in Company
2nd Oct 20254:07 pmRNSHolding(s) in Company
1st Oct 20257:21 amRNSHighest grade Ag-Cu at Target A1, Mushima North
24th Sep 20257:00 amRNSDrill holes show silver - Target A1, Mushima North
10th Sep 202512:29 pmRNSHolding(s) in Company
3rd Sep 20253:42 pmRNSHolding(s) in Company
2nd Sep 20257:00 amRNSPhase 2 Drilling Results: Target A1, Mushima North
11th Aug 20257:00 amRNSCompletion of Phase 2 at Target A1 - Mushima North
31st Jul 20251:42 pmRNSTotal Voting Rights
25th Jul 202510:09 amRNSHolding(s) in Company
25th Jul 20258:30 amRNSHolding(s) in Company
21st Jul 20257:00 amRNSDrilling Commences at Target A1 - Mushima North
8th Jul 20257:00 amRNSUpcoming Drill Programme - Mushima North, Zambia
4th Jul 20259:45 amRNSHolding(s) in Company
1st Jul 202511:31 amRNSDirectors’ Subscriptions
30th Jun 202510:13 amRNSTotal Voting Rights
27th Jun 20252:00 pmRNSHalf-Yearly Report 2025
25th Jun 20257:00 amRNSUpdate: Konkola West Copper Project, Zambia
23rd Jun 20258:53 amRNSHolding(s) in Company
19th Jun 20257:00 amRNS-RProject Focus: Jacks Copper Project, Zambia
17th Jun 20259:27 amRNSHolding(s) in Company
16th Jun 20253:07 pmRNSHolding(s) in Company

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.