Less Ads, More Data, More Tools Register for FREE

Pin to quick picksSovereign Metals Regulatory News (SVML)

Share Price Information for Sovereign Metals (SVML)

Share Price is delayed by 15 minutes
Get Live Data
31.50    -0.50 (-1.56%)
Bid:
31.00
Ask:
32.00
Spread: 1.00 (3.226%)
Market Cap: £206.63m
SVML Live PriceLast checked at - London Stock Exchange

Intraday Sovereign Metals Share Chart

Conservation Farming Program Increases Yields 4x

24 Jun 2025 07:00

RNS Number : 0878O
Sovereign Metals Limited
24 June 2025
 

 

NEWS RELEASE I 24 JUNE 2025

SOVEREIGN'S EXPANDED CONSERVATION FARMING PROGRAM INCREASES CROP YIELDS FOUR FOLD

· Malawian farmers who participated in Sovereign's 2025 Conservation Farming Program increased crop yields by four-times (4x), with the top farmer achieving a 10x yield increase compared to traditional farming techniques

· Conservation Farming Programs were launched by Sovereign in 2024 in parallel with the development of the Kasiya Project, aiming to uplift local communities by supporting the growth of successful smallholder farmers

·  The 2025 Program was enthusiastically adopted by an additional 260 local farmers joining the 90 farmers trained in the previous planting season

· This scale of farmer participation and increased yields demonstrates the Program's effectiveness in sustainably increasing agricultural production during Sovereign's ongoing Definitive Feasibility Study

· Sovereign has adopted Conservation Farming as one of the cornerstones of its livelihood improvement initiatives for the Kasiya Project

 

Sovereign Metals Limited (ASX:SVM; AIM:SVML; OTCQX:SVMLF) (Sovereign or the Company) is pleased to announce the results of its 2025 Conservation Farming Program (Program)harvest season at the Kasiya Rutile Graphite Project (Kasiya or the Project) in Malawi.

As part of Sovereign's commitment to improving livelihoods and local communities near the Kasiya Project, the Company launched a Program in 2024 to support the development of successful smallholder farmers. Local farmers received training to increase maize crop yield, protect soil from erosion and degradation and ultimately improve long-term food security.

During the 2024 harvest season, the Program delivered strong results, with visibly improved crop growth with the 90 participating farmers reporting harvest yields three-times (3x) higher than previous years despite an El Niño-driven drought.

In 2025, 350 farmers, of which 50% are female, have participated in the Program with yield surveys of all farmers who have harvested their crops demonstrating four times (4x) higher than typical yields from conventional farming.

The top farmer this season, harvested 12.8 tonnes/ha i.e. a ten-times (10x) increase in crops, compared to last season's top farmer who achieved 6 tonnes/ha and a five-times (5x) higher crop yield. Top-performing farmers have not only managed to meet their household food requirements, but have also sold surplus crop with proceeds being used to upgrade their houses and invest in trading businesses.

Managing Director and CEO Frank Eagar commented: "The success of our Conservation Farming Program near Kasiya demonstrates a scalable solution to food insecurity and otherwise perpetiual land degradation in Malawi. By restoring soil health and significantly improving yields, the program promotes lasting self-reliance for local communities. It also reflects our broader commitment to sustainable development and responsible investment in Malawi's future-where environmental stewardship, social impact, and economic progress go hand in hand."

 

Conservation farming involves sustainable permaculture techniques such as crop rotation, minimal tillage, organic mulching, and composting, all aimed at regenerating soil health and boosting productivity over time. It teaches, promotes and monitors responsible land stewardship based on the principles of on-time, to standard, no wastage, with joy.

 

Figure 1: Conservation farming vs. conventional farming methods

 

The program's long-term goal is to enable smallholder farmers to consistently produce surplus crops, creating a pathway to sustainable household income even under challenging climatic conditions. The expanded scale allows the Company to further demonstrate the Program's positive impacts as part of the ongoing Definitive Feasibility Study for the Kasiya Project.

 

Figure 2: Sovereign's Program Results with four fold yield

 

Figure 3: Sovereign's Managing Director & CEO, Mr Frank Eagar, inspecting the yield with the local farmers

 

Enquiries

Frank Eagar, Managing Director & CEO

South Africa / Malawi

+27 21 140 3190

Sapan Ghai, CCO

London

+44 207 478 3900

 

Nominated Adviser on AIM and Joint Broker 

 

SP Angel Corporate Finance LLP 

+44 20 3470 0470 

Ewan Leggat 

Charlie Bouverat 

 

 

 

Joint Broker 

 

Stifel 

+44 20 7710 7600 

Varun Talwar 

 

Ashton Clanfield 

 

 

 

Buchanan 

+ 44 20 7466 5000 

 

Forward Looking Statement

This release may include forward-looking statements, which may be identified by words such as "expects", "anticipates", "believes", "projects", "plans", and similar expressions. These forward-looking statements are based on Sovereign's expectations and beliefs concerning future events. Forward looking statements are necessarily subject to risks, uncertainties and other factors, many of which are outside the control of Sovereign, which could cause actual results to differ materially from such statements. There can be no assurance that forward-looking statements will prove to be correct. Sovereign makes no undertaking to subsequently update or revise the forward-looking statements made in this release, to reflect the circumstances or events after the date of that release.

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
MSCPPUQAQUPAUGC
Date   Source Headline
26th Feb 20257:00 amRNSKasiya's Graphite Suitable for Expandable Markets
19th Feb 20257:00 amRNSKasiya's Graphite Suitable for Refractory Use
3rd Feb 20257:00 amRNS-RPresentation - Optimised PFS Outcomes
30th Jan 20257:00 amRNSDecember 2024 Quarterly Report
22nd Jan 20257:00 amRNSKasiya - Optimised PFS Results
17th Dec 20247:00 amRNSTest Pit Rehab Underway After Successful Backfill
22nd Nov 20247:00 amRNSResult of AGM
21st Nov 20247:00 amRNSResults for Use of Kasiya Graphite in Refractories
13th Nov 20247:00 amRNSMining Trials Conclude Successfully
30th Oct 20247:00 amRNSSeptember 2024 Quarterly Report
22nd Oct 20247:00 amRNSInfill Drilling Program Complete
9th Oct 20247:01 amRNSChange of Director’s Interest Notice
9th Oct 20247:00 amRNSNotice of AGM
27th Sep 20247:00 amRNSIssue of Performance Rights
26th Sep 20247:00 amRNS2024 Annual Report
24th Sep 20247:00 amRNSSovereign Presents at Minerals Security Event
18th Sep 20247:00 amRNSSpiral Plant Successfully Installed
16th Sep 20247:00 amRNSChange in Substantial Holding
13th Sep 20247:00 amRNSRio Tinto Shareholding and Issue of Shares
12th Sep 20247:00 amRNSResult of Meeting
10th Sep 20247:00 amRNSASX Price Query
4th Sep 20247:00 amRNSOutstanding Battery Anode Material Produced
28th Aug 20247:00 amRNSHydraulic Mining Trial Commences
12th Aug 20247:00 amRNSNotice of General Meeting
12th Aug 20247:00 amRNSInfill Drilling Program to Upgrade Kasiya Resource
31st Jul 20247:00 amRNSJune 2024 Quarterly Report
25th Jul 20247:00 amRNSDry Mining Trial Successfully Completed
8th Jul 20247:05 amRNSChange in Substantial Holding - Rio Tinto
8th Jul 20247:00 amRNSCommencement of Trading on OTCQX Market
3rd Jul 20247:00 amRNSRio Tinto to Invest Additional A$18.5 million
20th Jun 20247:00 amRNSMalawi Rail Upgrades Underway
12th Jun 20247:00 amRNSPilot Phase Site Construction on Schedule
3rd Jun 20247:00 amRNSASX Price Query
22nd May 20247:00 amRNSKasiya Optimisation Advances to Pilot Phase
15th May 20247:00 amRNSDownstream Testwork Shows High Quality Graphite
8th May 20247:00 amRNSTestwork Delivers Superior Quality Graphite
1st May 20247:00 amRNSIncreased Graphite Bulk Sample Capacity
30th Apr 20247:00 amRNSMarch 2024 Quarterly Report
23rd Apr 20247:00 amRNSGraphite Expert Appointed to Development Team
15th Apr 20247:00 amRNSSustainable Farming on Target to Triple Crop Yield
12th Apr 20247:00 amRNSIssue of Performance Rights
28th Mar 20247:00 amRNSChange of Director’s Interest Notice
27th Mar 20247:00 amRNSFollow-Up Drilling Initiated North of Kasiya
20th Mar 20249:57 amRNSRepresentative Bulk Sample Shipped
19th Mar 20247:00 amRNSAppointment of Stifel as Joint Broker
13th Mar 20247:00 amRNSHalf-Year Accounts
1st Mar 20247:00 amRNSCapabilities Strengthened with Key Appointments
26th Feb 20247:00 amRNSCommissioning of Sustainable Farming Initiative
15th Feb 20247:00 amRNSAppointment of Experienced ESG Officer
5th Feb 20247:00 amRNSInvestor Presentation

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.