Less Ads, More Data, More Tools Register for FREE

Pin to quick picksSovereign Metals Regulatory News (SVML)

Share Price Information for Sovereign Metals (SVML)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 29.00
Bid: 28.00
Ask: 30.00
Change: -0.50 (-1.69%)
Spread: 2.00 (7.143%)
Open: 29.50
High: 29.50
Low: 29.00
Prev. Close: 29.50
SVML Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Kasiya Optimisation Advances to Pilot Phase

22 May 2024 07:00

RNS Number : 4216P
Sovereign Metals Limited
22 May 2024
 

NEWS RELEASE I 22 MAY 2024

KASIYA OPTIMISATION ADVANCES TO PILOT PHASE

·

Sovereign to immediately commence a pilot mining and land rehabilitation program ("Pilot Phase") at Kasiya as part of the ongoing Optimisation Study

·

Empirical data generated from the Pilot Phase will assist towards determining optimal excavation, material handling, processing, backfilling and rehabilitation approaches

·

Sovereign will excavate approximately 150,000 bench cubic metres of ore from a test pit over a three-month period using a combination of dry and hydraulic mining techniques

·

Excavated material will be processed on-site and at Sovereign's laboratory in Malawi and will also provide additional bulk samples for graphite product qualification

·

The test pit will be backfilled, and multiple rehabilitation strategies will be implemented to demonstrate successful restoration of agricultural land

·

Demonstrates strong support for mining projects in Malawi with all required approvals and community permissions for the Pilot Phase obtained within three months

 

Figure 1: Natural concentration of heavy minerals at surface at Kasiya (Source: C12 Consultants)

Managing Director Frank Eagar commented: "Advancing to a Pilot Phase is an important milestone for Kasiya. This covers the full spectrum of engineering and design, logistics, materials handling, water and environmental approvals, stakeholder engagement, livelihood restoration, tailings management and land rehabilitation. The successful permitting is a testament to the strong owner's team we have assembled. We are progressing Kasiya into a totally new phase of development. The scale and results from this phase will significantly enhance our knowledge base from the previous laboratory-based studies. I want to thank the Malawi Government for an efficient approvals process, demonstrating just how important Kasiya is to all stakeholders."

·

Classification 2.2: This announcement includes Inside Information

Sovereign Metals Limited (ASX:SVM; AIM:SVML) (the Company or Sovereign) is pleased to announce that the Company has initiated a Pilot Mining and Land Rehabilitation Program at its Kasiya Rutile-Graphite Project (Kasiya or Project) in Malawi.

The results will allow Sovereign to determine optimal excavation, backfill and land rehabilitation approaches. The Pilot Phase will be a demonstration to local communities of the successful rehabilitation of land for agricultural use post-mining. Results will also provide critical information for the upcoming Definitive Feasibility Study (DFS) and once commenced, it will shorten the time to its completion.

The objectives of the Pilot Phase include:

· Optimisation of mining methods by construction of a pilot-scale open pit close to the maximum depth of the current reserves at 20m;

· Scale-up of existing in-country processing capability by installation of commercial scale spirals to produce additional bulk samples for graphite product qualification;

· Optimising the tailings management and storage designs; and

· Optimising land rehabilitation, soil restoration and selection of revegetation species.

The commencement of the Pilot Phase follows the receipt within three months of all relevant approvals and permissions from the Malawi Environment Protection Authority (MEPA), National Water Resources Authority (NWRA), the Ministry of Mines, and the local community.

The Pilot Phase will be undertaken on a 9.9-hectare site and will include the following activities:

1. Test Pit: A test pit of 120m by 110m will be excavated to a depth of 20m, allowing optimisation of hydraulic and dry mining excavation methods.

2. Stockpiles: The excavated material will be temporarily stored in 4 stockpiles, namely all dry mining material, wet slimes (in a pond) and two sizes of sand fractions from the hydraulic mining.

3. Backfilling and Grading: The material will be placed back into the pit, and all areas will be graded.

4. Rehabilitation Demonstration: Sovereign will construct eight small rehabilitation demonstration pits covering a combined area of 100m by 130m. These will be used for water storage, excavated material storage, and demonstration of multiple rehabilitation approaches.

5. Temporary Laydown Areas: Four areas will be used as temporary laydown areas, offices, and associated infrastructure.

6. Communication: The Pilot Phase will be an educational opportunity for Project stakeholders. Sovereign will undertake a series of stakeholder visits and consultations for this purpose.

Kasiya is the world's largest natural rutile deposit and the second-largest flake graphite deposit. Sovereign aims to develop a low-CO2 and sustainable operation to supply highly sought-after natural rutile and graphite to global markets.

Results of the PFS, released in late 2023, demonstrated Kasiya's potential to become the world's largest rutile producer at 222kt per annum and one of the world's largest natural graphite producers (ex-China) at 244kt per annum.

The PFS delivered compelling economics with a post-tax NPV8 of US$1.6 Billion and a post-tax IRR of 28%. This long-life, multi-generational operation generates over US$16 Billion of revenue based on an initial 25-year life-of-mine and delivers an average annual EBITDA of US$415 Million per annum.

Pilot Phase Program Design

Activities have been designed to establish a 9.9-hectare site over the current Ore Reserve defined in the Kasiya PFS, covering a mineralised zone with soil conditions deemed representative of the overall Mineral Resource Estimate (MRE). Over approximately three months, Sovereign will excavate several test pits and collect geological and geotechnical samples. The main pit will be backfilled with dry material, while material from hydraulic mining will be used to fill the remaining pits as part of the rehabilitation phase.

Land rehabilitation will form an integral component of the DFS. Sovereign's objective is to restore land after mining to conditions that achieve the same or better agricultural yields than existing land uses and crop yields. For this reason, the Company will undertake field-based demonstrations of rehabilitation showcasing drying times, soil recoveries, soil nutrients, growth variants, and including different soil inputs and revegetation methods.

Site Construction

Prior to the establishment of site infrastructure, eight boreholes have been permitted and drilled using a locally appointed drilling contractor. These boreholes will supply water to the site, which will be stored in a temporary water storage pond.

A perimeter fence will be erected around the site to maintain the necessary health and safety standards. Existing roads will be used for access to the site and, if required, improved through grading.

Temporary buildings such as offices and stores will be brought to the site on flatbed lorries and erected. To support pilot mining, two 1MW mobile diesel-powered electricity generators will be installed to provide the electricity required for high-pressure water monitors.

Pilot Mining

The main pit will be excavated using conventional load and haul to 20m depth to develop a sump to test hydraulic mining to the full depth of the current Ore Reserves. The excavated material will be temporarily stored in stockpiles.

On-Site Processing Facility

Material mined from the test pit will be processed on-site and at the Company's laboratory facility in Lilongwe. As previously announced (Please refer to announcement dated 1 May 2024 entitled "Sovereign to Increase Bulk Sample Preparation Capacity"), as part of the Pilot Phase, a commercial-scale spiral plant will be installed at site in Malawi.

Rutile and graphite concentrate samples generated from the Pilot Phase will be shared with potential off-takers and end-users, and used for further testwork as part of the Company's graphite commercialisation strategy.

Rehabilitation Phase

This phase will consist of establishing a strong soils baseline, backfilling of the test pit with different soil compositions, rehabilitation tests, revegetation with plants, and the improvement of soil conditions post-mining.

Regular monitoring and evaluation of the rehabilitation activities will be undertaken to assess the progress of vegetation growth and soil stabilisation. Following the conclusion of the rehabilitation, the proposed project site will be returned to farmland.

Figure 2: Site layout

Permitting

Permissions for the Pilot Phase were received following the successful submission of an Environmental and Social Management Plan to MEPA. Sovereign is committed to the responsible development of Kasiya. The Pilot Phase will be undertaken in accordance with Malawian Law and IFC Performance Standards, which will include protecting local communities and the natural environment.

 

ENQUIRIES

Frank Eagar (South Africa/Malawi)Managing Director

+61(8) 9322 6322

Sam Cordin (Perth)+61(8) 9322 6322

Sapan Ghai (London)+44 207 478 3900

 

 

Nominated Adviser on AIM and Joint Broker

 

SP Angel Corporate Finance LLP

+44 20 3470 0470

Ewan Leggat

Charlie Bouverat

 

 

Joint Brokers

 

Stifel

+44 20 7710 7600

Varun Talwar

 

Ashton Clanfield

 

 

 

Berenberg

+44 20 3207 7800

Matthew Armitt

 

Jennifer Lee

 

 

 

Buchanan

+ 44 20 7466 5000

Competent Person Statement

The information in this announcement that relates to the Mineral Resource Estimate is extracted from an announcement dated 5 April 2023 entitled 'Kasiya Indicated Resource Increased by over 80%' which is available to view at www.sovereignmetals.com.au and is based on, and fairly represents information compiled by Mr Richard Stockwell, a Competent Person, who is a fellow of the Australian Institute of Geoscientists (AIG). Mr Stockwell is a principal of Placer Consulting Pty Ltd, an independent consulting company. Sovereign confirms that a) it is not aware of any new information or data that materially affects the information included in the original announcement; b) all material assumptions included in the original announcement continue to apply and have not materially changed; and c) the form and context in which the relevant Competent Persons' findings are presented in this announcement have not been materially changed from the original announcement.

The information in this announcement that relates to Production Targets, Ore Reserves, Processing, Infrastructure and Capital Operating Costs, Metallurgy (rutile and graphite) is extracted from an announcement dated 28 September 2023 entitled 'Kasiya Pre-Feasibility Study Results' which is available to view at www.sovereignmetals.com.au. Sovereign confirms that: a) it is not aware of any new information or data that materially affects the information included in the original announcement; b) all material assumptions and technical parameters underpinning the Production Target, and related forecast financial information derived from the Production Target included in the original announcement continue to apply and have not materially changed; and c) the form and context in which the relevant Competent Persons' findings are presented in this presentation have not been materially modified from the Announcement.

The information in this announcement that relates to the Exploration Results is extracted from an announcement dated 1 February 2024 entitled 'Extensions to Rutile & Graphite Mineralisation at Kasiya' which is available to view at www.sovereignmetals.com.au. Sovereign confirms that a) it is not aware of any new information or data that materially affects the information included in the original announcement; b) all material assumptions included in the original announcement continue to apply and have not materially changed; and c) the form and context in which the relevant Competent Persons' findings are presented in this report have not been materially changed from the announcement.

Ore Reserve for the Kasiya Deposit

 

Classification

Tonnes(Mt)

Rutile Grade(%)

Contained Rutile(Mt)

Graphite Grade (TGC) (%)

Contained Graphite(Mt)

RutEq. Grade* (%)

Proved

-

-

-

-

-

-

Probable

 538

1.03%

5.5

1.66%

8.9

2.00%

Total

 538

1.03%

5.5

1.66%

8.9

2.00%

* RutEq. Formula: Rutile Grade x Recovery (100%) x Rutile Price (US$1,484/t) + Graphite Grade x Recovery (67.5%) x Graphite Price (US$1,290/t) / Rutile Price (US$1,484/t). All assumptions are from the Kasiya PFS ** Any minor summation inconsistencies are due to rounding

Kasiya Total Indicated + Inferred Mineral Resource Estimate at 0.7% rutile cut-off grade

Classification

Resource(Mt)

Rutile Grade(%)

Contained Rutile(Mt)

Graphite Grade (TGC) (%)

Contained Graphite(Mt)

Indicated

 1,200

1.0%

12.2

1.5%

18.0

Inferred

 609

0.9%

5.7

1.1%

6.5

Total

 1,809

1.0%

17.9

1.4%

24.4

Forward Looking Statement

This release may include forward-looking statements, which may be identified by words such as "expects", "anticipates", "believes", "projects", "plans", and similar expressions. These forward-looking statements are based on Sovereign's expectations and beliefs concerning future events. Forward looking statements are necessarily subject to risks, uncertainties and other factors, many of which are outside the control of Sovereign, which could cause actual results to differ materially from such statements. There can be no assurance that forward-looking statements will prove to be correct. Sovereign makes no undertaking to subsequently update or revise the forward-looking statements made in this release, to reflect the circumstances or events after the date of that release.

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014 as it forms part of UK domestic law by virtue of the European Union (Withdrawal) Act 2018 ('MAR'). Upon the publication of this announcement via Regulatory Information Service ('RIS'), this inside information is now considered to be in the public domain.

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDSEESFEELSELI
Date   Source Headline
12th Jun 20247:00 amRNSPilot Phase Site Construction on Schedule
3rd Jun 20247:00 amRNSASX Price Query
22nd May 20247:00 amRNSKasiya Optimisation Advances to Pilot Phase
15th May 20247:00 amRNSDownstream Testwork Shows High Quality Graphite
8th May 20247:00 amRNSTestwork Delivers Superior Quality Graphite
1st May 20247:00 amRNSIncreased Graphite Bulk Sample Capacity
30th Apr 20247:00 amRNSMarch 2024 Quarterly Report
23rd Apr 20247:00 amRNSGraphite Expert Appointed to Development Team
15th Apr 20247:00 amRNSSustainable Farming on Target to Triple Crop Yield
12th Apr 20247:00 amRNSIssue of Performance Rights
28th Mar 20247:00 amRNSChange of Director’s Interest Notice
27th Mar 20247:00 amRNSFollow-Up Drilling Initiated North of Kasiya
20th Mar 20249:57 amRNSRepresentative Bulk Sample Shipped
19th Mar 20247:00 amRNSAppointment of Stifel as Joint Broker
13th Mar 20247:00 amRNSHalf-Year Accounts
1st Mar 20247:00 amRNSCapabilities Strengthened with Key Appointments
26th Feb 20247:00 amRNSCommissioning of Sustainable Farming Initiative
15th Feb 20247:00 amRNSAppointment of Experienced ESG Officer
5th Feb 20247:00 amRNSInvestor Presentation
1st Feb 20247:00 amRNSExtensions To Rutile & Graphite Mineralisation
31st Jan 20247:00 amRNSDecember 2023 Quarterly Report
23rd Jan 20247:00 amRNSExperienced Social Specialist Firm Appointed
27th Nov 20237:00 amRNSCompany Presentation
24th Nov 20237:00 amRNSResult of AGM
2nd Nov 20237:00 amRNSLithium-Ion Battery Graphite Program Upscaled
31st Oct 20237:00 amRNSSeptember 2023 Quarterly Report
20th Oct 20237:00 amRNSInitial Director’s Interest Notice
18th Oct 20237:00 amRNSNotice of AGM
16th Oct 20237:00 amRNSKey Mgmt Appointments for Development at Kasiya
11th Oct 20237:00 amRNSKasiya Pre-Feasibility Study Results Presentation
29th Sep 20237:00 amRNSIssue of Shares and AGM Date
29th Sep 20237:00 amRNSAnnual Report 2023
28th Sep 20237:00 amRNSKasiya Pre-Feasibility Study Results
25th Aug 20237:00 amRNSIssue of Shares
23rd Aug 20237:00 amRNSResults of Meeting
16th Aug 20238:24 amRNSNotice of Change of Interest of Substantial Holder
28th Jul 202310:49 amRNSNotice of Change of Interest of Substantial Holder
28th Jul 20237:00 amRNSJune 2023 Quarterly Report
25th Jul 202311:01 amRNSNotice of Substantial Holder
21st Jul 20237:00 amRNSNotice of GM
17th Jul 20237:00 amRNSRio to Invest $40.4m to Become Strategic Investor
21st Jun 20237:00 amRNSChange of AIM Nominated Adviser
20th Jun 20237:00 amRNSGraphite Bulk Sample Operations Commenced
8th Jun 20237:00 amRNSKasiya Graphite for use in Lithium ion Batteries
6th Jun 20237:00 amRNSLapse of Performance Rights
16th May 20237:00 amRNSExpiry of Unlisted Options
28th Apr 20237:00 amRNSMarch 2023 Quarterly Report
5th Apr 20237:00 amRNSKasiya Indicated Resource Increased By Over 80%
20th Mar 20237:00 amRNSDemerger Timetable
17th Mar 20237:00 amRNSResult of Meeting

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.