Cobus Loots, CEO of Pan African Resources, on delivering sector-leading returns for shareholders. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksRed Rock Resources Regulatory News (RRR)

Share Price Information for Red Rock Resources (RRR)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.0475
Bid: 0.045
Ask: 0.05
Change: -0.0025 (-5.00%)
Spread: 0.005 (11.111%)
Open: 0.05
High: 0.05
Low: 0.0475
Prev. Close: 0.05
RRR Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Steelmin Update

30 May 2018 07:00

RNS Number : 5960P
Red Rock Resources plc
30 May 2018
 

Red Rock Resources PLC

("Red Rock" or the "Company")

Steelmin Update

Process of commissioning Furnace V continues

 

30 May 2018

Red Rock Resources Plc, the natural resource development company with interests in gold and steel feed materials, announces, further to the announcement of 21st February 2018, an update on progress in commissioning the ferrosilicon plant at Jajce, Bosnia owned by a subsidiary of Steelmin Limited ("Steelmin"). Steelmin is 22% owned by Red Rock.

On 5th May 2018 Steelmin began to heat and power up Furnace V at Jajce since when the ramp-up towards commercial production has proceeded to plan. The ramp up is expected to continue over the coming few weeks to build to full power including laboratory checks on material being produced.

Steelmin's plant will initially consist of the refurbished Furnace V of 29,000t of ferrosilicon p.a. and 5,800t of microsilica, and after a planned refurbishment of a second furnace will have a combined annual capacity of 48,720 tonnes ferrosilicon (FeSi 75) and 9,700 tonnes of microsilica.

 

Andrew Bell, Chairman of Red Rock comments: "On behalf of all our shareholders, we congratulate the team at Steelmin on successfully reaching this important milestone and look forward to announcing further progress in the days to come."

 

Steelmin - Background

The Steelmin plant and facility is located in central Bosnia, 104 kilometres north west of Sarajevo. The complex, formerly part of Electrobosna, was originally built in the 1970s by Elkem, a major silicon and alloy producer based in Norway, and was one of the largest and best known producers of ferrosilicon and silicon metal in Europe. It was closed down in 1992 due to the Bosnian War, was then privatised and the six furnaces were sold off in two separate parts in 2000. The plant was brought back online until finally being shuttered again in 2004 due to increasing exports pressure from Chinese producers.

Anti-dumping regulations have since been implemented by the European Commission; which significantly reduced both Chinese and Russian exports into Europe, allowing prices to stabilize and rise over time. The second, smaller, facility split off from the original is now being operated by the Italian ferro-alloy producer Metalleghe, and has been successfully producing next to Steelmin's plant for the past 12 years.

 

Steelmin - Assets

Steelmin controls furnaces IV and V from the original Electrobosna complex. Furnace V has a 48MVA installed power Elkem furnace, and is connected to two chimneys on the roof of the production hall. Furnace IV, the smaller of the two, has a 30 MVA Tagliaferri furnace with three chimneys, preventing the emission of gases in ambient air to comply with EU regulatory requirements. Given its larger total capacity Steelmin decided to bring furnace V on initially and then move to recommission furnace IV later in 2018.

In addition to the two furnaces, the facility in Jajce houses a filtration plant, warehouse storage for raw materials, pouring and dispatch hall as well as a plant for process water recirculation.

Refurbishment for the second furnace is expected to begin later in 2018.

Power remains the most significant input cost to ferrosilicon production and this is provided by abundant and economical hydro-power available across the region. Furnace feedstock such as quartz is also sourced from the region.

 

Steelmin Products and Markets

 

Steelmin intends initially to produce ferrosilicon containing 75% silicon and 25% iron, a product primarily used as a deoxidising agent and to add electrical conductivity and corrosion resistance to steel. A by-product of ferrosilicon production will be microsilica, which is a dust used in the manufacture of speciality concretes in the construction industry as well as in advanced refractories and ceramics. Furnace V is expected to produce 29,000t of ferrosilicon per annum as well as 5,800t of microsilica.

Over time Steelmin is expected to produce both ferrosilicon as well as additional silicon alloys that offer higher margins and additional upside. Currently ferrosilicon trades at over €1500 a ton compared with between €1280-1350 a ton at the time of Red Rock's investment in June 2017.

European ferrosilicon production depends critically on access to cheap power (locally generated hydroelectric power in the case of Jajce) since this is up to half the cost of production. Prices are historically driven by steel production levels, the level of Chinese pricing and production allowed into Europe, as well as the associated export and anti-dumping tariffs. Since late 2016 overall Chinese export prices have begun to rise, positively impacting European produce prices. Key input costs such as metallurgical coal are also closely correlated to realized ferrosilicon prices.

 

For further information, please contact:

Andrew Bell 0207 747 9990 Chairman Red Rock Resources Plc

Scott Kaintz 0207 747 9990 Director Red Rock Resources Plc

Roland Cornish/ Rosalind Hill Abrahams 0207 628 3396 NOMAD Beaumont Cornish Limited

Jason Robertson 0207 374 2212 Broker First Equity Limited

 

 

This announcement contains inside information for the purposes of Article 7 of EU Regulation 596/2014.

 

 

Glossary

 

Ferrosilicon: ferrosilicon produced at Steelmin contains 75% silicon, and is primarily used as a deoxidising agent in steel production, adding electrical conductivity and corrosion-resistance properties to steel

 

Microsilica: a by-product of silicon and ferrosilicon production, used in the construction industry for its added strength and abrasion resistance

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
MSCSEIFWUFASEFI
Date   Source Headline
31st Dec 20209:41 amRNSFinal Results
31st Dec 20207:00 amRNSTotal Voting Rights
30th Dec 20202:05 pmRNSSecond Price Monitoring Extn
30th Dec 20202:00 pmRNSPrice Monitoring Extension
23rd Dec 20206:12 pmRNSHolding(s) in Company
22nd Dec 20204:50 pmRNSIssue of Equity and Total Voting Rights
21st Dec 20208:20 amRNSJupiter Mines Q3 and iron ore Spin Off update
21st Dec 20207:00 amRNSRight to acquire loans and arbitration funding
18th Dec 202012:28 pmRNSIssue of Equity and Total Voting Rights
14th Dec 20204:40 pmRNSIssue of Equity and Total Voting Rights
11th Dec 20202:05 pmRNSSecond Price Monitoring Extn
11th Dec 20202:00 pmRNSPrice Monitoring Extension
11th Dec 202011:05 amRNSSecond Price Monitoring Extn
11th Dec 202011:00 amRNSPrice Monitoring Extension
9th Dec 20207:00 amRNSOperations update
1st Dec 202011:30 amRNSTotal Voting Rights
20th Nov 202012:21 pmRNSLuanshimba, DRC Geophysics Programme begins
18th Nov 20207:00 amRNSIssue of Shares, Warrants, update on Kenya and TVR
10th Nov 20207:00 amRNSAustralian Gold Joint Venture Update
6th Nov 20202:30 pmRNSAustralian Gold Joint Venture Update
30th Oct 20205:31 pmRNSTotal Voting Rights
29th Oct 20207:00 amRNSUpdate: Kenya
28th Oct 20207:48 amRNSJupiter Mines dividend and half year results
12th Oct 202011:55 amRNSSummary - Key Projects
28th Sep 202010:40 amRNSFinancing to raise £1,000,000
25th Sep 20207:00 amRNSUpdate
23rd Sep 20209:05 amRNSSecond Price Monitoring Extn
23rd Sep 20209:00 amRNSPrice Monitoring Extension
22nd Sep 20207:00 amRNSAustralia JV - NI43-101 Report Received
16th Sep 20203:00 pmRNSRed Rock Australasia - additional project reports
11th Sep 20202:05 pmRNSSecond Price Monitoring Extn
11th Sep 20202:00 pmRNSPrice Monitoring Extension
7th Sep 20203:42 pmRNSUpdate on Jupiter Mines
7th Sep 20207:00 amRNSOption over Slovak Gold Assets
2nd Sep 20204:35 pmRNSPerformance Option Award Update
1st Sep 202011:05 amRNSSecond Price Monitoring Extn
1st Sep 202011:00 amRNSPrice Monitoring Extension
27th Aug 202011:00 amRNSRed Rock Australasia - New License Application
24th Aug 20207:00 amRNSPerformance options and directors' shareholdings
19th Aug 20201:00 pmRNSRed Rock Australasia - Update - Historical Reports
18th Aug 20202:05 pmRNSSecond Price Monitoring Extn
18th Aug 20202:00 pmRNSPrice Monitoring Extension
17th Aug 20204:41 pmRNSSecond Price Monitoring Extn
17th Aug 20204:36 pmRNSPrice Monitoring Extension
17th Aug 20207:00 amRNSUpdate on COVID-19 Impact and Licensing
10th Aug 202011:44 amRNSHolding(s) in Company
5th Aug 20204:41 pmRNSSecond Price Monitoring Extn
5th Aug 20204:36 pmRNSPrice Monitoring Extension
27th Jul 202011:05 amRNSSecond Price Monitoring Extn
27th Jul 202011:00 amRNSPrice Monitoring Extension

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.