SpaceX IPO is the biggest IPO in stock market history. Join the conversation.Click here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksRosebank Regulatory News (ROSE)

Share Price Information for Rosebank (ROSE)

Share Price is delayed by 15 minutes
Get Live Data
350.00    12.00 (3.55%)
Bid:
350.00
Ask:
352.00
Spread: 2.00 (0.571%)
Market Cap: £3.46b
ROSE Live PriceLast checked at - London Stock Exchange

Intraday Rosebank Share Chart

Uranium Update

6 Nov 2008 07:00

RNS Number : 5644H
Vane Minerals PLC
06 November 2008
 



6 November 2008 

VANE Minerals Plc 

("VANE" or the "Company")

Uranium Exploration Results and Update 

Positive results at North Wash where 18 exploration drill holes intersect uranium mineralization

Drilling at North Wash indicates mineralization of GT* 0.20 or higher at a cut-off grade of 0.05% eU3Oextends through an area 750 feet (304m) by 3000 feet (914m) (infill drilling required) 

Second round drilling commences at Happy Jack project, Utah

Drilling also initiated as part of the  VANE-Uranium One JV, northern Arizona Breccia Pipe District

*Grade-thickness product

VANE Minerals Plc today announces exploration drilling results and progress on its uranium projects located in Utah and Arizona. The projects are held by the Company's wholly-owned subsidiary, VANE Minerals (US) LLC.

NORTH WASHUTAH

A drilling program, primarily designed to explore the 1,000-foot-wide (304m) untested area between the main body of mineralization and widely-spaced mineralized holes to the southwest, has returned positive results. Uranium mineralization was encountered in drill holes on each of the drill fences spaced 300 feet apart. The hole spacing is 100 to 200 feet on the fences. Fifteen (15) of the twenty-six (26) holes drilled cut mineralization. Three of the 15 holes reached resource status of GT (grade-thickness) of 0.20 at cut-off grade of 0.05% eU3O8 In particular, hole 08-14 with 9.5 feet (2.9m) grading 0.36% eU3O8was the best hole drilled to date on the property.

In addition, three holes were drilled in the northeast part of the main body of mineralization, two of which were offset holes located 100 feet north of previous drilling. All holes cut uranium mineralization with one of the northern holes, 08-28, intersecting 5.0 feet grading 0.07% eU3O8.

The new drilling indicates an area measuring 750 feet (304m) by 3,000 feet (914m) encompassing resource-grade holes which is approximately twice the size of the previously known mineralized area. Additional infill drilling is required to better define the distribution of resource-grade mineralization in the newly defined area.  The mineralized trend remains open. 

The North Wash project was originally drilled by Cotter Corporation in the late 1970's. This historic drilling defined approximately 150,000 pounds of U3O8 (non-43-101 compliant) with associated vanadium before drilling was terminated due to the weak uranium market. A uranium to vanadium ratio estimated at 1:5, based on VANE core, indicates that 750,000 pounds of vanadium oxide (V2O5may be present with the 150,000 pound indicated uranium resource, as announced on 15th January 2007. Vanadium was observed in each of the mineralized holes drilled in the current campaign. Future exploration will incorporate procedures to further assess the vanadium content.

VANE geologists continue to believe the North Wash project holds the potential for up to 1 million pounds of U3O8 and 5 million pounds of V2O5 (using bottom end historic indicated grades of V2O5).

The radiometric log results from Century Geophysical Corporation are listed in the table below: 

Hole 

Date

Depth 

Mineralized

Thickness (ft) -

Number

Completed

Drilled(ft)

Interval (ft)

Grade (% eU3O8)

08-01

8/6/08

360

303.0-304.0

1.0 - Min.

08-02

8/12/08

360

309.5-311.0

1.5 - 0.09

08-03

8/14/08

340

Barren

08-04

8/16/08

350

Barren

08-05

8/17/08

360

Barren

08-06

8/19/08

360

Barren

08-07

8/20/08

350

Barren

08-08

8/26/08

360

Barren

08-09

8/27/08

340

303.0-306.0

3.0 - Min.

08-10

8/28/08

350

Barren

08-11

8/29/08

320

297.0-298.0

1.0 - 0.08

08-12

9/3/08

330

298.5-299.5

1.0 - 0.52

08-13

9/5/08

330

294.0-297.0

3.0 - Min.

08-14

9/7/08

340

270.5-280.0

9.5 - 0.36

08-15

9/8/08

330

Barren

08-16

9/9/08

330

272.0-281.5

9.5 - Min.(0.03)

08-17

9/10/08

330

272.0-273.0

1.0 - 0.05

08-18

9/16/08

340

253.0-255.0

2.0 - Min.

08-19

9/18/08

300

253.5-267.0

14.0 - Min.

08-20

9/19/08

300

Barren

08-21

9/21/08

320

280.5-286.5

6.0 - Min.

08-22

9/22/08

310

280.5-282.0

1.5 - 0.19

08-23

9/23/08

300

Barren

08-24

10/2/08

300

258.5-260.5

2.0 - 0.05

08-25

10/4/08

290

246.0-251.0

5.0 - Min.

08-26

10/6/08

290

Barren

08-27

10/7/08

270

244.5-245.5

1.0 - 0.09

251.5-252.5

1.0 - 0.07

08-28

10/8/08

250

215.5-220.5

5.0 - 0.07

08-29

10/9/08

260

206.5-208.5

2.0 - Min.

226.0-230.0

4.0 - Min.

HAPPY JACKUTAH

A second round of drilling is underway to further test areas of mineralization surrounding the Happy Jack mine workings indicated on historic maps.

BRECCIA PIPE EXPLORATIONARIZONA

Drilling on the VANE-Uranium One joint venture holdings has commenced.

Kristopher K. Hefton, Chief Operating Officer VANE Minerals (US) LLC, BSc Geology, who meets the criteria of a qualified person under the AIM Rules - Guidance for Mining, Oil and Gas Companies, has reviewed and approved the technical information contained within this announcement.

---------------------------------------------------------------------------------------------------------------

Commenting today Steve Van Nort, CEO of VANE Minerals, said: 

"We are encouraged by the results from North Wash and look forward to pushing ahead with further exploration of our uranium portfolio. Drilling has commenced at our Uranium One joint venture and second round drilling is underway at Happy Jack I look forward to being able to release further results when available. VANE's exploration programs are well funded and I believe our ability to press ahead with work in the current economic environment leaves us well positioned to take advantage of a continued, global, uranium supply shortfall." 

- END -

For further information, please contact:

VANE Minerals Plc

+44 (0) 20 7667 6322

Matthew Idiens

Ambrian Partners Limited

+44 (0) 20 7634 4709 

Richard Brown

Thomas Weisel Partners

+44 (0) 20 7877 4478

Paul Newman

Threadneedle Communications 

+44 (0) 20 7653 9850

Laurence Read/Beth Harris

+44 (0) 79 7995 923

Notes to Editors

VANE Minerals is an exploration company, with a cash flow, financed in part by production from the silver/gold Diablito Mine and mill in Western Mexico. The Company has assembled a highly qualified and experienced management team with a proven track record in exploration and development. VANE now has projects in MexicoParaguay and the US, incorporating exposure to gold, silver, copper and uranium. The Company's principal objective is to utilise the funds generated from Diablito to identify and explore undervalued and under-explored projects, create value in those projects and realise that value through exploitation or disposal to third parties. For further information, please visit www.vaneminerals.com.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCUVVWRWRRARAA
Date   Source Headline
31st May 20185:00 pmRNSTotal Voting Rights
29th May 20185:11 pmRNSHolding(s) in Company
24th May 20184:22 pmRNSHolding(s) in Company
21st May 201811:28 amRNSResult of general meeting and Total Voting Rights
11th May 20183:33 pmRNSHolding(s) in Company
3rd May 201811:30 amRNSNotice of general meeting and posting of circular
3rd May 20189:15 amRNSCorporate presentation
2nd May 20187:16 amRNSIssue of Equity and proposed general meeting
19th Apr 201811:39 amRNSUpdate on operations in Paradox Basin, Utah U.S.A.
9th Apr 20182:20 pmRNSDirector/PDMR Shareholding
9th Apr 201811:35 amRNSDirector/PDMR Shareholding
9th Apr 20188:25 amRNSGrant of Options
4th Apr 20187:00 amRNSIncreased acreage in Paradox Basin, Utah, U.S.A
20th Mar 20181:03 pmRNSOperations update
29th Jan 20187:00 amRNSMultiple drilling targets identified by 3D seismic
18th Jan 20184:39 pmRNSNAPE Summit Global Business Conference 2018
22nd Dec 201711:07 amRNSDirector/PDMR Shareholding
4th Dec 20177:00 amRNSParadox Basin 3D Seismic and Operations Update
1st Dec 20177:00 amRNSCompletion of SDA Mill disposal
30th Nov 20174:05 pmRNSCorporate Presentation - Investor evening
16th Nov 201711:08 amRNSCorporate Presentation
9th Nov 20177:00 amRNSUpdate on SDA Mill disposal
7th Nov 20177:00 amRNSHolding(s) in Company
31st Oct 20175:00 pmRNSTotal Voting Rights
31st Oct 20173:52 pmRNSUpdate on SDA Mill disposal
25th Oct 20175:08 pmRNSHolding(s) in Company
24th Oct 20177:00 amRNSCompletion of 3D Seismic Shoot in Paradox Basin
12th Oct 20176:17 pmRNSHolding(s) in Company
10th Oct 20173:31 pmRNSHolding(s) in Company
9th Oct 201710:34 amRNSResult of General Meeting and Total Voting Rights
5th Oct 20177:00 amRNSCommencement of Recording at 3D Seismic Shoot
29th Sep 20175:00 pmRNSTotal Voting Rights
22nd Sep 201711:05 amRNSDirector/PDMR Shareholdings
22nd Sep 20177:00 amRNSIssue of equity to raise £3m, notice of GM and TVR
19th Sep 20177:00 amRNSPartnering agreement - mineral interests - Paradox
18th Sep 201711:31 amRNSResult of GM, ISIN change and total voting rights
18th Sep 20177:00 amRNSHalf-year Report
11th Sep 20177:00 amRNSSDA Mill disposal - SPA signed
1st Sep 20172:51 pmRNSProposed disposal, capital reorganisation & GM
31st Aug 20177:00 amRNSupdate re Seismic Shoot in the Paradox Basin
22nd Aug 20177:00 amRNSGrant of Permits for Paradox Basin Seismic survey
16th Aug 20177:00 amRNSUpdate re disposal of Mexican milling operations
1st Aug 20177:00 amRNSUpdate on the disposal of SDA Mill
24th Jul 201711:47 amRNSApproval for Paradox Basin Seismic survey
4th Jul 20177:00 amRNSUpdate re permitting process & directorate change
29th Jun 20179:57 amRNSResult of AGM
6th Jun 20177:00 amRNSFinal results & notice of AGM
1st Jun 20177:00 amRNSUpdate re disposal of Mexican milling operations
3rd May 20177:00 amRNSMexican IVA recovery update
2nd May 20177:00 amRNSUpdate on Paradox Basin permitting process

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.