6 Nov 2008 07:00
ο»Ώ
6Β NovemberΒ 2008Β
VANE Minerals PlcΒ
("VANE" or the "Company")
Uranium Exploration Results and UpdateΒ
Positive resultsΒ atΒ North WashΒ where 18 explorationΒ drillΒ holes intersect uranium mineralization
DrillingΒ at North Wash indicatesΒ mineralization of GT* 0.20 or higher at a cut-off grade of 0.05% eU3O8Β extendsΒ throughΒ an area 750 feet (304m) by 3000 feet (914m)Β (infill drilling required)Β
Second round drilling commences at Happy Jack project,Β Utah
DrillingΒ alsoΒ initiated as part of theΒ Β VANE-Uranium One JV, northern ArizonaΒ Breccia Pipe District
*Grade-thickness product
VANE Minerals Plc today announces exploration drilling results and progress on its uranium projects located inΒ UtahΒ andΒ Arizona. The projects are held by the Company's wholly-owned subsidiary, VANE Minerals (US) LLC.
NORTH WASH,Β UTAH
AΒ drillingΒ program,Β primarilyΒ designed to explore the 1,000-foot-wide (304m) untested area between the main body of mineralization and widely-spaced mineralized holes to the southwest,Β hasΒ returned positive results.Β Uranium mineralization was encountered in drill holes on each of the drill fences spaced 300 feet apart.Β The hole spacing is 100 to 200 feet on the fences.Β Fifteen (15)Β of the twenty-six (26)Β holesΒ drilledΒ cut mineralization.Β Three of the 15 holes reached resource status ofΒ aΒ GT (grade-thickness)Β ofΒ 0.20 atΒ aΒ cut-off grade of 0.05% eU3O8.Β Β In particular, hole 08-14 with 9.5 feet (2.9m) grading 0.36% eU3O8,Β was the best holeΒ drilledΒ to date on the property.
In addition, three holes were drilled in the northeast part of the main body of mineralization, two of which were offset holesΒ located 100 feetΒ north of previous drilling. All holes cut uranium mineralization with oneΒ of the northernΒ holes, 08-28,Β intersecting 5.0 feet grading 0.07% eU3O8.
The new drilling indicates an area measuring 750 feet (304m) by 3,000 feet (914m) encompassing resource-grade holes whichΒ isΒ approximately twiceΒ the size of the previously known mineralized area. Additional infill drilling is required to better defineΒ the distribution ofΒ resource-grade mineralization in the newly defined area.Β Β The mineralized trend remains open.Β
TheΒ North WashΒ projectΒ was originally drilled by Cotter Corporation in the late 1970's. This historic drilling definedΒ approximately 150,000Β pounds ofΒ U3O8Β (non-43-101 compliant) with associated vanadiumΒ before drilling was terminated due to the weak uranium market. A uraniumΒ toΒ vanadium ratioΒ estimated atΒ 1:5,Β based on VANE core,Β indicates thatΒ 750,000 pounds ofΒ vanadium oxide (V2O5)Β may be present with the 150,000 pound indicated uranium resource, as announced on 15thΒ January 2007. Vanadium wasΒ observedΒ in eachΒ of theΒ mineralized holesΒ drilledΒ in the current campaign. Future exploration will incorporate procedures to further assess the vanadiumΒ content.
VANE geologists continue to believe the North Wash project holds the potential for up to 1 million pounds ofΒ U3O8Β and 5 million pounds ofΒ V2O5Β (using bottom end historic indicated grades ofΒ V2O5).
TheΒ radiometric logΒ resultsΒ from Century Geophysical CorporationΒ areΒ listedΒ in the tableΒ below:Β
|
HoleΒ |
Date |
DepthΒ |
Mineralized |
Thickness (ft) - |
|
Number |
Completed |
Drilled(ft) |
Interval (ft) |
Grade (% eU3O8) |
|
08-01 |
8/6/08 |
360 |
303.0-304.0 |
1.0 - Min. |
|
08-02 |
8/12/08 |
360 |
309.5-311.0 |
1.5 - 0.09 |
|
08-03 |
8/14/08 |
340 |
Barren |
|
|
08-04 |
8/16/08 |
350 |
Barren |
|
|
08-05 |
8/17/08 |
360 |
Barren |
|
|
08-06 |
8/19/08 |
360 |
Barren |
|
|
08-07 |
8/20/08 |
350 |
Barren |
|
|
08-08 |
8/26/08 |
360 |
Barren |
|
|
08-09 |
8/27/08 |
340 |
303.0-306.0 |
3.0 - Min. |
|
08-10 |
8/28/08 |
350 |
Barren |
|
|
08-11 |
8/29/08 |
320 |
297.0-298.0 |
1.0 - 0.08 |
|
08-12 |
9/3/08 |
330 |
298.5-299.5 |
1.0 - 0.52 |
|
08-13 |
9/5/08 |
330 |
294.0-297.0 |
3.0 - Min. |
|
08-14 |
9/7/08 |
340 |
270.5-280.0 |
9.5 - 0.36 |
|
08-15 |
9/8/08 |
330 |
Barren |
|
|
08-16 |
9/9/08 |
330 |
272.0-281.5 |
9.5 - Min.(0.03) |
|
08-17 |
9/10/08 |
330 |
272.0-273.0 |
1.0 - 0.05 |
|
08-18 |
9/16/08 |
340 |
253.0-255.0 |
2.0 - Min. |
|
08-19 |
9/18/08 |
300 |
253.5-267.0 |
14.0 - Min. |
|
08-20 |
9/19/08 |
300 |
Barren |
|
|
08-21 |
9/21/08 |
320 |
280.5-286.5 |
6.0 - Min. |
|
08-22 |
9/22/08 |
310 |
280.5-282.0 |
1.5 - 0.19 |
|
08-23 |
9/23/08 |
300 |
Barren |
|
|
08-24 |
10/2/08 |
300 |
258.5-260.5 |
2.0 - 0.05 |
|
08-25 |
10/4/08 |
290 |
246.0-251.0 |
5.0 - Min. |
|
08-26 |
10/6/08 |
290 |
Barren |
|
|
08-27 |
10/7/08 |
270 |
244.5-245.5 |
1.0 - 0.09 |
|
251.5-252.5 |
1.0 - 0.07 |
|||
|
08-28 |
10/8/08 |
250 |
215.5-220.5 |
5.0 - 0.07 |
|
08-29 |
10/9/08 |
260 |
206.5-208.5 |
2.0 - Min. |
|
226.0-230.0 |
4.0 - Min. |
HAPPYΒ JACK,Β UTAH
A second round of drilling is underway to further test areas of mineralization surrounding the Happy Jack mine workings indicated on historic maps.
BRECCIA PIPE EXPLORATION,Β ARIZONA
Drilling on the VANE-Uranium One joint venture holdings has commenced.
Kristopher K. Hefton, Chief Operating Officer VANE Minerals (US) LLC, BSc Geology, who meets the criteria of a qualified person under the AIM Rules - Guidance for Mining, Oil and Gas Companies, has reviewed and approved the technical information contained within this announcement.
---------------------------------------------------------------------------------------------------------------
Commenting today Steve Van Nort, CEO of VANE Minerals, said:Β
"We are encouraged by the results fromΒ NorthΒ WashΒ and look forward to pushing ahead withΒ further explorationΒ of our uranium portfolio. Drilling has commenced at our Uranium One joint venture and second round drilling is underway at Happy Jack.Β Β I look forward to being able to release further resultsΒ when available. VANE's exploration programs are well funded and I believe our ability to press ahead with work in the current economic environment leaves us well positioned to take advantage of a continued, global, uranium supply shortfall."Β
- END -
For furtherΒ information, please contact:
|
VANE Minerals Plc |
+44 (0) 20 7667 6322 |
|
Matthew Idiens |
|
|
Ambrian PartnersΒ Limited |
+44 (0) 20 7634Β 4709Β |
|
Richard Brown |
|
|
Thomas Weisel Partners |
+44 (0) 20 7877 4478 |
|
Paul Newman |
|
|
Threadneedle CommunicationsΒ |
+44 (0)Β 20 7653 9850 |
|
Laurence Read/Beth Harris |
+44 (0) 79 7995 923 |
Notes to Editors
VANE Minerals is an exploration company, with a cash flow, financed in part by production from the silver/goldΒ Diablito MineΒ and mill inΒ Western Mexico. The Company has assembled a highly qualified andΒ experienced management teamΒ with a proven track record in exploration and development. VANE now has projects inΒ Mexico,Β ParaguayΒ and theΒ US, incorporating exposure to gold, silver, copper and uranium. The Company's principal objective is to utilise the funds generated from Diablito to identify and explore undervalued and under-explored projects, create value in those projects and realise that value through exploitation or disposal to third parties. For furtherΒ information, please visitΒ www.vaneminerals.com.
Follow the stocks