We would love to hear your thoughts about our site and services, please take our survey here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksROSE.L Regulatory News (ROSE)

  • There is currently no data for ROSE

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Update on operations in Paradox Basin, Utah U.S.A.

19 Apr 2018 11:39

RNS Number : 4848L
Rose Petroleum PLC
19 April 2018
 

Prior to publication, the information contained within this announcement was deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014 ("MAR"). With the publication of this announcement, this information is now considered to be in the public domain.

 

19 April 2018

 

Rose Petroleum plc

("Rose", the "Company" or the "Group")

 

Update on operations in Paradox Basin, Utah, U.S.A.

Rose Petroleum plc (AIM: ROSE), the AIM quoted natural resources business, is pleased to provide an update on operational progress on its project in the Paradox Basin, Utah, U.S.A. ("Paradox Basin"). Following the acquisition of additional acreage earlier this month (the "new acreage"), the Company continues to earn into a 75% working interest in a total of approximately 80,000 acres in the Paradox Basin. Activity on the ground continues apace, and the Company is aiming to drill its first well later this year.

The Company has assembled a highly experienced subsurface and surface operational team with extensive experience and a successful track record in the Paradox Basin. The team designed, managed and implemented a nine-well drilling programme in the Paradox Basin directly to the south of Rose's acreage. Eight of these wells were commercial and production grew from circa 100 barrels of oil per day ("BOPD") to over 3,500 BOPD.

The operational team has now largely completed the subsurface assessment, well location selection and basic well design and engineering for the Company's first proposed horizontal well, the GVU 29-1. The Application for Permit to Drill ("APD") process for GVU 29-1 is well underway. The Notice of Staking, which is the first requirement for the APD, was lodged and accepted by the Bureau of Land Management ("BLM") earlier this month and the Company is currently preparing for the onsite inspection of the proposed well location with the BLM, which is due to take place imminently. It is currently expected that the APD will be granted in Q3 2018, which will permit the Company to commence drilling operations soon thereafter.

Following the completion of the first phase of the well design work, the new operational team has also completed time/cost estimates for the initial well. It is currently expected that the total cost of the well (including completion, testing and tie-in costs) will be in the range of US$7-8 million, which is well below our previous budgeted forecast of US$8-10 million. We would also expect this to be even lower during the development phase as operations increase. Discussions with industry and financial partners to fund the drilling programme are underway and, as previously announced, the Board is committed to avoiding dilution to existing shareholders wherever possible.

The Company has now identified approximately 60 potential well locations on both its existing and new acreage within the area covered by the Company's 3D seismic survey that was completed in 2017. By applying a similar methodology to the Ryder Scott Company's 2014 Competent Persons Report ("CPR") and as per SPE-PRMS standards and definitions, Rose's management estimates that, within the acreage covered by the 3D seismic, there is the potential to be unrisked prospective resources of circa 38 million barrels of oil equivalent ("MMBOE") in the Cane Creek reservoir ("Clastic 21") alone. The Paradox Basin formation is made up of approximately 24 clastic zones, of which Clastic 21 is the primary producing zone of the basin to date. Additional potential clastic reservoir zones also exist, both above and below the Clastic 21. These were also assessed as prospective in the CPR and add further potential both within the 3D seismic covered area (which represents only 15,000 acres of the 80,000 acres over which the Company has a working interest) and the area outside.

The prospectivity of Rose's acreage is underpinned by the existence of the producing 28-11 well which is only 365 metres to the west of the new acreage. The 28-11 was drilled in 2006 by Delta Petroleum and has produced 141,000 BOE from Clastic 21. These factors give management a high degree of confidence in the potential of Rose's acreage and, as a result, it has been decided to also proceed with the permitting of a second well location in the new acreage, the 22-1 well. The 22-1 would be a horizontal well which Rose's management consider has an Estimated Ultimate Recovery ("EUR") of 894,000 barrels of oil equivalent ("BOE").

Given the recent completion of the 3D seismic survey and the acquisition of the new acreage, the Company is now in the process of updating the CPR to ensure it accurately reflects the current position.

The Company is pleased to announce that it will exhibit and present at the 2018 UK Investor Show (https://www.ukinvestorshow.com) in London on Saturday, 21st April 2018. The Company will be at stand 43 at the conference in the Queen Elizabeth II Centre, Broad Sanctuary, Westminster, London, SW1P 3EE.

Matthew Idiens, CEO, commented: "I am delighted that we've been able to assemble such a capable operational team, with an impressive track record of success in the basin. Significant cost savings have already been identified in the well design and further savings are expected.

"We continue to make excellent progress on the ground and are preparing to drill our first appraisal well before the end of 2018, which will be a key milestone for Rose."

Glossary

Estimated Ultimate Recovery: Estimated Ultimate Recovery (EUR) is defined as those quantities of petroleum which are estimated, on a given date, to be potentially recoverable from an accumulation, plus those quantities already produced therefrom.

 

SPE-PRMS: the standards and definitions of the SPE-PRMS as published by the Society of Petroleum Engineers, the American Association of Petroleum Geologists, the World Petroleum Council and the Society of Petroleum Evaluation Engineers in 2007

 

Unrisked prospective resources: Prospective Resources are those quantities of petroleum which are estimated, on a given date, to be potentially recoverable from undiscovered accumulations

 

Enquiries:

 

Matthew Idiens (CEO)

Chris Eadie (CFO)

 

Rose Petroleum plc

Tel: +44 (0) 20 7225 4595

Tel: +44 (0) 20 7225 4599

Jeremy Porter / James Reeve / Liz Kirchner

 

Allenby Capital Limited

 

Tel: +44 (0) 20 3328 5656

 

Andy Thacker

 

Turner Pope Investments

Tel: +44 (0)20 3621 4120

 

Media enquiries:

 

Peter Curtain

 

Allerton Communications

Tel: +44 (0) 20 3633 1730

peter.curtain@allertoncomms.co.uk

 

Dr Gregor Maxwell, BSc Hons. Geology and Petroleum Geology, PhD, Technical Advisor to the board of Rose Petroleum plc, who meets the criteria of a qualified person under the AIM Note for Mining and Oil & Gas Companies - June 2009, has reviewed and approved the technical information contained within this announcement.

 

Notes to editors

 

Rose Petroleum plc (http://rosepetroleum.com) is a North America-focused oil and gas company whose primary asset is approximately 80,000 acres in the oil and gas producing Paradox Basin in Utah, U.S.A., where it is earning-into a 75% working interest. Using high-quality data gathered in a 3D seismic survey completed in October 2017, the Company has identified drilling locations in naturally fractured areas of the Paradox clastics formation with the intention of commencing a drilling programme in H2 2018, once necessary permits and funding have been secured.

 

The Company's established management is supported by an expert technical team with extensive experience of the basin, where current operations nearby have proven successful, with significant initial production rates and low decline rates, offering strong economics even in the present oil price environment.

 

The Company's strategy is to grow both organically and through acquisition, identifying additional hydrocarbon assets, conventional or unconventional, that would benefit from the Company's fast-acting, entrepreneurial approach.

 

Rose Petroleum has been quoted on AIM since June 2004.

 

 

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
UPDGGUQWCUPRGUB
Date   Source Headline
3rd Aug 202012:51 pmRNSChange of Name to Zephyr Energy plc & website
29th Jul 20203:17 pmRNSResult of AGM
30th Jun 20207:00 amRNSFinal Results and notice of AGM
8th Jun 20204:30 pmRNSHolding(s) in Company
29th May 20207:00 amRNSGrant of options
5th May 20204:20 pmRNSHolding(s) in Company
1st May 20207:00 amRNSOperations and Strategy Update
10th Feb 20207:00 amRNSUpdate on restructuring of the Paradox project
10th Feb 20207:00 amRNSUpdate on McCoy Lease Working Interest Acquisition
31st Dec 20191:00 pmRNSTotal Voting Rights
3rd Dec 201912:27 pmRNSIssue of Equity and change to TVR
29th Nov 20195:00 pmRNSTotal Voting Rights
22nd Nov 20194:52 pmRNSHolding(s) in Company
21st Nov 201912:43 pmRNSResult of General Meeting and change to TVR
14th Nov 20192:10 pmRNSHolding(s) in Company
8th Nov 20194:12 pmRNSHolding(s) in Company
4th Nov 20192:16 pmRNSDirector/PDMR shareholding
4th Nov 20197:05 amRNSIssue of equity and notice of general meeting
4th Nov 20197:00 amRNSProposed Acquisition-McCoy Interest & Fundraising
14th Oct 20197:00 amRNSRestructuring of the Paradox project
30th Sep 20197:00 amRNSHalf-year Report
3rd Sep 20197:00 amRNSDirectorate Changes and Board Restructuring
2nd Sep 201910:59 amRNSHolding(s) in Company
30th Aug 20195:00 pmRNSTotal Voting Rights
22nd Aug 20197:00 amRNSIssue of equity and change to total voting rights
30th Jul 201912:46 pmRNSResult of AGM and update on Board composition
10th Jul 20193:01 pmRNSHolding(s) in Company
28th Jun 20197:00 amRNSBoard appointment and update
28th Jun 20197:00 amRNSFinal Results
27th Jun 20197:00 amRNSNotice of Annual Results
3rd Jun 20197:00 amRNSTotal Voting Rights
24th May 20197:00 amRNSSubscription completion, board appointment & TVR
20th May 20197:00 amRNSIssue of equity and Board Changes
30th Apr 20197:00 amRNSUpdated Corporate Presentation
23rd Apr 20197:00 amRNSDirectorate Change
12th Apr 20193:40 pmRNSHolding(s) in Company
12th Apr 20197:00 amRNSDirector/PDMR Shareholding
11th Apr 20197:00 amRNSIssue of equity and Board Changes
28th Mar 20197:00 amRNSUpdate & Proposed Board Changes
26th Mar 20199:41 amRNSHolding in Company - Correction
12th Mar 20194:17 pmRNSHolding(s) in Company
5th Mar 20196:09 pmRNSHolding(s) in Company
5th Mar 20199:12 amRNSHolding(s) in Company
11th Jan 20197:00 amRNSAcquisition of additional acreage in Paradox Basin
7th Jan 20197:00 amRNSSchlumberger Study Results
6th Dec 20187:00 amRNSOperations Update
27th Nov 20187:00 amRNSDatabase Agreement & North Wash Vanadium update
1st Nov 20187:00 amRNSBLM Approval for Permit to Drill GV 22-1 well
3rd Oct 20187:00 amRNSHolding(s) in Company
25th Sep 20187:00 amRNSHalf-year Report

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.