Technical Report on Phalaborwa Process Flow Sheet

23 Aug 2022 07:00

RNS Number : 8338W
Rainbow Rare Earths Limited
23 August 2022
 

 

23 August 2022

Rainbow Rare Earths Limited

("Rainbow" or "the Company")

LSE: RBW

 

Release of Technical Report on Phalaborwa Processing Flow Sheet

 

Rainbow Rare Earths has released an updated Technical Report on the processing flowsheet to extract rare earth elements from the phosphogypsum stacks at the Company's Phalaborwa Project in South Africa ("the flowsheet"), which is available on the Company's website at www.rainbowrareearths.com/investors/results-reports-presentations/ .

The flowsheet has been developed in parallel with K-Technologies, Inc., USA ("K-Tech") and represents a breakthrough in allowing for the economic extraction of rare earth elements from phosphogypsum, which has historically proven to be challenging.

Compared to the initial processing options considered when work commenced, a number of key enhancements have been made, resulting in significant anticipated capital and operating cost savings for the Phalaborwa Preliminary Economic Assessment ("PEA") which is currently being finalised. As detailed in the Technical Report, the flowsheet for the PEA will comprise the following key steps:

· Phosphogypsum will be reclaimed hydraulically from the existing stacks and pumped to the processing facility removing soluble impurities prior to the leach process.

· A fluoride leach regime will be employed to remove fluoride from the gypsum stream, allowing rare earth grades in the pregnant leach solution to be maximised and producing reagents from the fluoride for use elsewhere in the processing circuit, reducing operating costs.

· The fluoride leached phosphogypsum progresses to a rare earth counter current sulphuric acid leach system for the extraction of the target rare earth elements. This allows for successful recycling of the various acid streams to optimise the overall processing costs.

· A rapid consolidation process for the rare earths in the pregnant leach solution allows the rare earths to be concentrated with primary impurity rejection. This process replaces the originally anticipated nano filtration system, which significantly improves the overall acid recycling, thereby reducing operating costs.

· The rapid consolidation process feeds the downstream continuous ion exchange and continuous ion chromatography processes to deliver separated rare earth oxides. The flow rates to these processes are considerably lower than anticipated using nano filtration techniques resulting in significant capital and operating cost savings.

Work is now ongoing to finalise the Phalaborwa PEA, which is expected to be completed at the end of September / early October 2022.

Rainbow and K-Tech anticipate the potential for wider application of this innovative processing flowsheet than solely the Phalaborwa Project. As a result, Rainbow and K-Tech are jointly applying for international patents. Rainbow is in the process of identifying global projects where the technology could be used to unlock further sources of rare earths from phosphogypsum.

Rainbow Rare Earths CEO, George Bennett, commented: "We are delighted to provide technical detail which emphasises the breakthrough that has been delivered by Rainbow, in conjunction with our partners K-Tech, in delivering a processing flowsheet to economically extract rare earth elements from phosphogypsum.

Working alongside our partners at K-Tech we have continually seen opportunities for refinement and optimisation as the flowsheet has developed. We anticipate that this process will continue as we progress from the PEA to PFS and BFS at Phalaborwa, alongside test work at other phosphogypsum opportunities, giving scope for both capital and operating cost reductions from the Phalaborwa PEA.

We believe that this work further demonstrates Rainbow's ability to overcome the historical technical, environmental, and economic challenges related to extracting rare earths from phosphogypsum, enabling us to unlock a valuable, near-term source of permanent magnetic metals required so urgently to drive the global green energy revolution."

**ENDS**

Market Abuse Regulation ("MAR") Disclosure

This announcement contains inside information for the purposes of Article 7 of the Market Abuse Regulation (EU) 596/2014 as it forms part of UK domestic law by virtue of the European Union (Withdrawal) Act 2018 ("MAR"), and is disclosed in accordance with the Company's obligations under Article 17 of MAR.

 

For further information, please contact:

 

Rainbow Rare Earths Ltd

Company

George Bennett

Pete Gardner

+27 82 652 8526

 

SP Angel Corporate Finance LLP

Broker

Ewan Leggat

Charlie Bouverat

+44 (0) 20 3470 0470

Tavistock Communications

PR/IR

Charles Vivian

Tara Vivian-Neal

+44 (0) 20 7920 3150

rainbowrareearths@tavistock.co.uk

 

Notes to Editors:

Rainbow's strategy is to become a globally significant producer of rare earth metals. NdPr and Dy are vital components of the strongest permanent magnets used for the motors and turbines driving the green technology revolution. Analysts are predicting demand for magnet rare earth oxides will grow substantially over the coming years, driven by increasing adoption of green technology, pushing the overall market for NdPr and Dy into deficit.

 

The Phalaborwa Rare Earths Project, located in South Africa, comprises an Inferred Mineral Resource Estimate of 38.3Mt at 0.43% TREO contained within gypsum tailings stacked in unconsolidated stacks derived from historic phosphate hard rock mining. High value NdPr oxide represents 29.1% of the total contained rare earth oxides, with economic Dysprosium and Terbium oxide credits enhancing the overall value of the rare earth basket in the stacks. The rare earths are contained in chemical form in the gypsum stacks, which is expected to allow high-value separated rare earth oxides to be produced with lower operating costs than a typical rare earth mineral project.

 

The Company's Gakara Project in Burundi has produced one of the highest-grade rare earth concentrates in the world (typically 54% TREO) through trial mining operations. The Gakara basket is weighted heavily towards NdPr, which account for approximately 19.5% of the contained TREO and 85% of the value of the concentrate. The Gakara project is currently on care and maintenance at the request of the Government of Burundi.

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDPPUWCRUPPGQP
Date   Source Headline
5th May 20267:00 amRNSEvaluation of a Listing in the USA
31st Mar 20267:15 amRNSInterim Results for six months to 31 December 2025
31st Mar 20267:00 amRNSSubscription raises £11.1m from investors
17th Mar 20267:00 amRNS-RPublication of New Investor Presentation
17th Mar 20267:00 amRNS-RPublication of New Investor Presentation
11th Mar 20267:00 amRNSMosaic Agreement and Uberaba Economic Assessment
11th Mar 20267:00 amRNSMosaic Agreement and Uberaba Economic Assessment
9th Feb 20267:00 amRNSPilot Plant Producing Commercial Mixed REE Product
14th Jan 20265:35 pmRNSPDMR Shareholding
13th Jan 20267:00 amRNSPilot Plant Commences Operations in Johannesburg
25th Nov 20257:00 amRNSSX Adoption Yields 99.5% Pure Rare Earth Products
24th Nov 20257:00 amRNSYttrium Price Surge Improves Phalaborwa Economics
12th Nov 20259:38 amRNSResults of Annual General Meeting
10th Nov 20257:00 amRNSPhalaborwa Resource Update to include Yttrium
27th Oct 20258:13 amRNSPublication of Annual Report and Notice of AGM
27th Oct 20257:00 amRNSPreliminary Results for Year-end 30 June 2025
22nd Sep 20257:00 amRNSFurther Major Advancement in Phalaborwa Test Work
1st Sep 20257:00 amRNSCIX Test Work shows Very High Purity Separation
4th Jul 20257:00 amRNSIssue of Shares to Directors under Incentive Plan
17th Jun 20257:00 amRNSEconomic Assessment for Uberaba Project in Brazil
3rd Jun 20257:00 amRNSUpdate on Laboratory Test Work in South Africa
29th May 20257:00 amRNS-RCollaboration with Curation Connect
21st May 20257:00 amRNS-RRainbow joins the Rare Earth Industry Association
19th Mar 20257:00 amRNSInterim Results for 6 Months to 31 December 2024
16th Dec 20247:00 amRNSInterim Study confirms Phalaborwa viability
7th Nov 20243:15 pmRNSResult of AGM
6th Nov 20247:00 amRNSDirector/PDMR Shareholding
23rd Oct 20249:00 amRNSPublication of Annual Report and Notice of AGM
18th Oct 20247:00 amRNSPreliminary Results for Year-end 30 June 2024
25th Sep 20247:00 amRNSCompletion of Ecora Royalty Transaction
18th Sep 20247:00 amRNSPhalaborwa Update
11th Sep 20247:00 amRNSUpdated Mineral Resource Estimate for Phalaborwa
3rd Sep 20247:00 amRNSGrant of Share Based Remuneration
1st Jul 20247:00 amRNSRoyalty Agreement with Ecora & US$10m raise
19th Jun 20247:00 amRNSPilot Plant Update
18th Apr 20243:50 pmRNSDirector/PDMR Shareholding
16th Apr 20247:00 amRNSPositive Initial Leaching and Mineralogy Results
28th Mar 20247:00 amRNSInterim Results
20th Mar 202411:37 amRNSPublication of Conference Presentation
26th Feb 20247:00 amRNSResource Update
5th Feb 20247:00 amRNSUpdate on Rare Earth Oxide Separation Progress
31st Jan 20247:00 amRNSPublication of Site Visit Presentation
18th Jan 20247:24 amRNSUS Congressional Delegation hosted at Phalaborwa
16th Jan 20247:00 amRNSAppointment of Stifel as Joint Broker
11th Jan 20247:00 amRNSRare Earth Oxide separation commences in the U.S.
6th Dec 20237:00 amRNSConditional shares issue & share options exercise
5th Dec 20237:00 amRNSDFC to fund proposed $50M TechMet investment
1st Dec 20237:00 amRNSRBW's partner K-Tech presents at Congress hearing
21st Nov 20237:00 amRNSResults of Annual General Meeting
8th Nov 20237:00 amRNSTechMet option to invest US$50m in Phalaborwa

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.