focusIR May 2024 Investor Webinar: Blue Whale, Kavango, Taseko Mines & CQS Natural Resources. Catch up with the webinar here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksProspex Eng Regulatory News (PXEN)

Share Price Information for Prospex Eng (PXEN)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 5.60
Bid: 5.40
Ask: 5.80
Change: -0.20 (-3.51%)
Spread: 0.40 (7.407%)
Open: 5.70
High: 5.50
Low: 5.50
Prev. Close: 5.70
PXEN Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Production Strategy at El Romeral Power Project

17 Mar 2022 07:00

RNS Number : 0376F
Prospex Energy PLC
17 March 2022
 

Prospex Energy PLC / Index: AIM / Epic: PXEN / Sector: Oil and Gas

 

17 March 2022

 

Prospex Energy PLC

('Prospex' or the 'Company')

 

Production Strategy at El Romeral Power Project

 

Prospex Energy PLC, the AIM quoted investment company focused on European energy projects, is pleased to provide an update on the production strategy from its El Romeral power project near Carmona in Southern Spain in which the Company holds a 49.9% working interest through Tarba Energía S.L. ("Tarba").

The owners of Tarba (Prospex and Warrego Energy Limited) have agreed to operate the El Romeral power plant 24 hours per day for six days per week until further notice. The reservoir performance and the operating regime are being monitored closely and the Tarba management is confident that the right balance is being achieved between ultimate recovery of remaining reserves and maximising electricity output and therefore income at this time.

Over the last two weeks the power plant has been successfully operating 24 hours a day, six days a week securing the recent high electricity prices. The power-plant automation and operational procedures have now been fully tested to enable continuous operation whenever required.

Currently Tarba has cash in hand of more than €400,000 and the forecast revenue for March 2022 is likely to exceed €500,000 at current forward curve electricity prices[1].

The reservoir modelling work by Tarba will continue to forecast gas production profiles from the El Romeral concession using a suite of production strategies including further sensitivities on rates, pressures and ultimate recoveries. The production strategy will be regularly reviewed and optimised based on sound reservoir management.

Mark Routh, Prospex's CEO, commented:

"The El Romeral concession has been producing gas for the power plant for twenty years and it was essential that the rate of production decline was thoroughly understood before instigating continuous plant operations. We now know that continuous operations are feasible and safe. I am very proud of our management and operating team at the plant who have embraced this new operating regime which was made possible by the success of the plant upgrades installed last December."

"We have selected the optimum production strategy based on the latest reservoir modelling which strikes the right balance between maximising recovery and optimising electricity production at this crucial time for the supply of energy in Europe. Reservoir modelling will continue and our production strategy will be optimised to match the availability of new gas production from our planned infill wells in the El Romeral concession."

 

This announcement contains inside information for the purposes of Article 7 of the Market Abuse Regulation (EU) 596/2014 as it forms part of UK domestic law by virtue of the European Union (Withdrawal) Act 2018 ("MAR") and is disclosed in accordance with the Company's obligations under Article 17 of MAR.

* * ENDS * *

For further information visit www.prospex.energy or contact the following:

 

Mark Routh

Prospex Energy PLC

Tel: +44 (0) 20 7236 1177

Rory MurphyRitchie Balmer

Strand Hanson Limited

 

Tel: +44 (0) 20 7409 3494

Colin RowburyJon Belliss

Novum Securities Limited

Tel: +44 (0) 20 7399 9427

Duncan VaseyLucy Williams

Peterhouse Capital Limited

Tel: +44 (0) 20 7220 9797

Susie GeliherAna Ribeiro

St Brides Partners Ltd

 

Tel: +44 (0) 20 7236 1177

 

Notes

Prospex Energy PLC is an AIM quoted investment company focussed on high impact onshore and shallow offshore European opportunities with short timelines to production. The Company's strategy is to acquire undervalued projects with multiple, tangible value trigger points that can be realised within 12 months of acquisition and then applying low-cost re-evaluation techniques to identify and de-risk prospects. The Company will rapidly scale up gas production in the short term to generate internal revenues that can then be deployed to develop the asset base and increase production further.

 

About El Romeral and Tarba

The El Romeral gas and power project in Spain, with gas production wells supplying gas to an 8.1MW power plant near Carmona in Southern Spain is owned and operated by Tarba. It is currently operating at about 20% of its full capacity because Tarba is waiting on permits to drill further infill wells on the concessions to increase production. Prospex owns a 49.9% working interest in the El Romeral project via Tarba. The remaining 51.1% working interest is owned by Warrego Energy Limited (ASX:WGO). Tarba sells electricity generated from the plant on the spot market in Spain. Current spot market prices have reached all-time highs in recent months. The El Romeral licences comprise three contiguous production concessions.

 

The updated Corporate Presentation for Q1-2022 is available on the Company's website at https://bit.ly/3G6JtCm.

 

[1] Forward curve electricity prices in Spain sourced from https://www.omip.pt/en/plazo-hoy

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
MSCQQLFFLXLXBBD
Date   Source Headline
7th Feb 20237:00 amRNSDirectorate Change
6th Feb 20233:21 pmRNSHolding(s) in Company
3rd Feb 20237:00 amRNSConversion of Loan Notes and TVR
1st Feb 202310:43 amRNSHolding(s) in Company
31st Jan 20234:35 pmRNSPrice Monitoring Extension
30th Jan 20237:00 amRNSChange of Director’s Interest
23rd Jan 20237:00 amRNSIssue of Equity
16th Jan 20237:00 amRNSIssue of Equity
4th Jan 20232:00 pmRNSHolding(s) in Company
23rd Nov 20227:00 amRNSItaly: Selva Field Development Update
11th Nov 20227:00 amRNSWarrego Energy interests in Spanish assets
7th Nov 20224:41 pmRNSSecond Price Monitoring Extn
7th Nov 20224:36 pmRNSPrice Monitoring Extension
7th Nov 202211:56 amRNSHolding(s) in Company
28th Oct 20227:00 amRNSConversion of Warrants Generates £36,000
25th Oct 20227:00 amRNSConversion of Warrants Generates £80,000
13th Oct 20227:00 amRNSConversion of Warrants Generates £24,000
11th Oct 20227:00 amRNSExercise of Options, CLNs and TVR
30th Sep 20224:41 pmRNSSecond Price Monitoring Extn
30th Sep 20224:36 pmRNSPrice Monitoring Extension
30th Sep 20222:06 pmRNSSecond Price Monitoring Extn
30th Sep 20222:00 pmRNSPrice Monitoring Extension
30th Sep 202211:06 amRNSSecond Price Monitoring Extn
30th Sep 202211:00 amRNSPrice Monitoring Extension
30th Sep 20229:05 amRNSSecond Price Monitoring Extn
30th Sep 20229:00 amRNSPrice Monitoring Extension
23rd Sep 20223:29 pmRNSExercise of Options and TVR and Award of Options
23rd Sep 20228:06 amRNSConversion of Warrants Generates £100,000
22nd Sep 20227:05 amRNSExercise of Options and TVR
22nd Sep 20227:00 amRNSHalf-year Report
21st Sep 20227:00 amRNSItaly: Selva Field Development Update
16th Sep 20225:22 pmRNSHolding(s) in Company
13th Sep 20227:00 amRNSConversion of Warrants Generates £90,000
12th Sep 20227:00 amRNSConversion of Warrants Generates £80,000
7th Sep 20227:00 amRNSConversion of Warrants Generates £100,000
6th Sep 20224:40 pmRNSSecond Price Monitoring Extn
6th Sep 20224:35 pmRNSPrice Monitoring Extension
5th Sep 20222:05 pmRNSSecond Price Monitoring Extn
5th Sep 20222:00 pmRNSPrice Monitoring Extension
5th Sep 20229:05 amRNSSecond Price Monitoring Extn
5th Sep 20229:00 amRNSPrice Monitoring Extension
5th Sep 20227:00 amRNSSuccessful Fund Raise of £500,000
26th Aug 20227:00 amRNSConversion of Warrants and Total Voting Rights
22nd Aug 20224:41 pmRNSSecond Price Monitoring Extn
22nd Aug 20224:35 pmRNSPrice Monitoring Extension
11th Aug 20227:00 amRNSItaly: Selva Field Development Update
8th Aug 20227:00 amRNSEl Romeral: Project Apollo On Stream
1st Aug 20227:00 amRNSEl Romeral: Income and Production Update
29th Jul 20227:35 amRNSProduction Concession Granted for Selva Field
26th Jul 20227:00 amRNSUpdated Corporate Presentation

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.