We would love to hear your thoughts about our site and services, please take our survey here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksProspex Eng Regulatory News (PXEN)

Share Price Information for Prospex Eng (PXEN)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 5.10
Bid: 5.00
Ask: 5.20
Change: 0.10 (2.00%)
Spread: 0.20 (4.00%)
Open: 5.00
High: 5.10
Low: 5.00
Prev. Close: 5.00
PXEN Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

El Romeral: Project Apollo On Stream

8 Aug 2022 07:00

RNS Number : 1712V
Prospex Energy PLC
08 August 2022
 

Prospex Energy PLC / Index: AIM / Epic: PXEN / Sector: Oil and Gas

 

8 August 2022

 

Prospex Energy PLC

('Prospex' or the 'Company')

 

El Romeral: Project Apollo On Stream

 

Prospex Energy PLC (AIM: PXEN), the AIM quoted investment company focused on European gas and power projects, is pleased to announce the successful installation of a 41.5 kW array of 83 solar panels on the roof of the El Romeral power plant, known as Project Apollo, was completed on 4 August 2022. The Company holds a 49.9% working interest in El Romeral through its interest in Tarba Energía S.L. ('Tarba').

 

Project Apollo powers part of the ancillary services at the plant, thereby leading to reduced self-consumption and increased sales of electricity. The cost of installation was less than €50,000 which was financed from existing funds held by Tarba. Payback from this investment is estimated to be three to four years. A total of 83 photo-voltaic panels have been installed in three separate zones on the power plant roof giving a total installed peak capacity of 41.5 kWh. Project Apollo is expected to generate 66 MWh in the first year.

 

Project Apollo will give valuable experience to Tarba in managing solar plants, which will be useful learning for Project Helios, the renewable co-generation project via a proposed 5 MW solar farm adjacent to El Romeral which is at FEED stage. Connection to the power grid at El Romeral is pre-existing and the grid network has ample capacity to export increased electricity output from Project Helios, subject to permitting.

 

Mark Routh, Prospex's CEO, commented:

"Project Apollo establishes us as an emerging integrated energy company and reduces our carbon footprint by leveraging an existing asset to incorporate photovoltaic capabilities. Not only will this directly result in increased sales of electricity at the El Romeral power plant, but importantly, it also furthers our ambition to diversify our power assets as we look to enhance our conventional/renewable energy ratio. This will be a core pillar of Prospex's strategy in the future as we balance the immediate and critical demand contours of domestic gas markets with our responsibility to provide long-term sustainable power across Europe.

 

"Today's news is a significant first step towards achieving this over-arching strategy and I look forward to providing further news in this regard over the coming weeks and months."

 

This announcement contains inside information for the purposes of Article 7 of the Market Abuse Regulation (EU) 596/2014 as it forms part of UK domestic law by virtue of the European Union (Withdrawal) Act 2018 ("MAR") and is disclosed in accordance with the Company's obligations under Article 17 of MAR.

 

* * ENDS * *

 

 

For further information visit www.prospex.energy or contact the following:

 

Mark Routh

Prospex Energy PLC

Tel: +44 (0) 20 7236 1177

Ritchie BalmerRory Murphy

Strand Hanson Limited

Tel: +44 (0) 20 7409 3494

Andrew Monk (Corporate Broking)Andrew Raca/Alex Cabral (Corporate Finance)

VSA Capital Limited

Tel: +44 (0) 20 3005 5000

Colin RowburyJon Belliss

Novum Securities Limited

Tel: +44 (0) 20 7399 9427

Susie GeliherAna Ribeiro

St Brides Partners Limited

 

Tel: +44 (0) 20 7236 1177

 

Notes

Prospex Energy PLC is an AIM quoted investment company focussed on high impact onshore and shallow offshore European opportunities with short timelines to production. The Company's strategy is to acquire undervalued projects with multiple, tangible value trigger points that can be realised within 12 months of acquisition and then applying low-cost re-evaluation techniques to identify and de-risk prospects.  The Company will rapidly scale up gas production in the short term to generate internal revenues that can then be deployed to develop the asset base and increase production further.

 

About El Romeral and Tarba

The El Romeral gas and power project in Spain, with gas production wells supplying gas to an 8.1MW power plant near Carmona in Southern Spain is owned and operated by Tarba. It is currently operating at about 30% of its full capacity because Tarba is waiting on permits to drill further infill wells on the concessions to increase production. Tarba can now be categorised as a hybrid energy provider with the successful installation of photovoltaic panels on the roof of the plant. Prospex owns a 49.9% working interest in the El Romeral project via Tarba. The remaining 50.1% working interest is owned by Warrego Energy Limited (ASX:WGO). Tarba sells electricity generated from the plant on the spot market in Spain. The El Romeral licences comprise three contiguous production concessions.

 

The updated Corporate Presentation for Q3-2022 is available on the Company's website at

https://www.prospex.energy/home

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
MSCFFFEITFIDIIF
Date   Source Headline
15th Apr 20247:00 amRNSUpdated Corporate Presentation
27th Mar 20247:00 amRNSFinal Settlement of Convertible Loan Note Debts
16th Feb 20249:02 amRNSHolding(s) in Company
31st Jan 202412:30 pmRNSItaly: Selva Field Development
19th Jan 20247:00 amRNSItaly: Selva Field Development
22nd Dec 20237:00 amRNSConversion of Loan Notes and TVR
18th Dec 20237:00 amRNSYear End Review and Business Development Update
1st Nov 20237:00 amRNSItaly: Selva Field Development - Q3 2023 Update
27th Sep 20237:00 amRNSConversion of Loan Notes and TVR
26th Sep 20237:00 amRNSConversion of Loan Note Debt and TVR
25th Sep 20237:00 amRNSConversion of Loan Notes and TVR
20th Sep 20237:00 amRNSHalf-year Report
5th Sep 20237:00 amRNSConversion of Loan Notes and TVR
1st Sep 20237:00 amRNSConversion of Loan Notes and TVR
29th Aug 20237:00 amRNSConversion of Loan Notes and TVR
7th Aug 20237:00 amRNSSuccessful ramp-up and commissioning of PM-1
27th Jul 20237:00 amRNSAward of Options
26th Jul 20237:00 amRNSConversion of Loan Notes and TVR
24th Jul 20237:00 amRNSNew Corporate Website
13th Jul 20238:09 amRNSConversion of Loan Notes and TVR
5th Jul 20237:45 amRNSInvestor Presentation
5th Jul 20237:00 amRNSStart of gas production from Podere Maiar-1
28th Jun 20237:00 amRNSItaly: Selva approved to commence gas production
20th Jun 202312:33 pmRNSResult of AGM
5th Jun 20237:00 amRNSAppointment of Fox-Davies as Corporate Broker
30th May 20237:00 amRNSItaly: Selva Field Development Update
26th May 20237:00 amRNSFinal Results
16th May 20238:30 amRNSSelva Field: Completion of gas plant construction
3rd May 20237:00 amRNSSpain: Project Helios Update
28th Apr 202311:04 amRNSHolding(s) in Company
19th Apr 20237:00 amRNSBoard Appointment
29th Mar 202312:14 pmRNSHolding(s) in Company
24th Mar 202312:00 pmRNSHolding(s) in Company
6th Mar 202311:05 amRNSSecond Price Monitoring Extn
6th Mar 202311:00 amRNSPrice Monitoring Extension
2nd Mar 20237:00 amRNSConversion of Loan Notes and TVR
1st Mar 202311:05 amRNSSecond Price Monitoring Extn
1st Mar 202311:00 amRNSPrice Monitoring Extension
1st Mar 20239:05 amRNSSecond Price Monitoring Extn
1st Mar 20239:00 amRNSPrice Monitoring Extension
28th Feb 20234:35 pmRNSPrice Monitoring Extension
28th Feb 202311:05 amRNSSecond Price Monitoring Extn
28th Feb 202311:00 amRNSPrice Monitoring Extension
28th Feb 20237:00 amRNSAward of Options
21st Feb 20237:00 amRNSConversion of Warrants Generates £20,000
15th Feb 20237:00 amRNSConversion of Loan Notes and TVR
14th Feb 20237:00 amRNSGas Sales Agreement signed with BP Gas Marketing
7th Feb 20237:00 amRNSDirectorate Change
6th Feb 20233:21 pmRNSHolding(s) in Company
3rd Feb 20237:00 amRNSConversion of Loan Notes and TVR

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.