Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPensana Regulatory News (PRE)

Share Price Information for Pensana (PRE)

Share Price is delayed by 15 minutes
Get Live Data
87.10    0.80 (0.93%)
Bid:
87.00
Ask:
87.90
Spread: 0.90 (1.034%)
Market Cap: £307.91m
PRE Live PriceLast checked at - London Stock Exchange

Intraday Pensana Share Chart

Update on Longonjo infill and resource expansion drill programme

21 Jan 2026 07:04

Pensana Plc - Update on Longonjo infill and resource expansion drill programme

Pensana Plc - Update on Longonjo infill and resource expansion drill programme

PR Newswire

LONDON, United Kingdom, January 21

 

 

 

21 January 2026

THIS ANNOUNCEMENT CONTAINS INSIDE INFORMATION

Pensana Plc ("Pensana" or the "Company")

Update on Longonjo infill and resource expansion drill programme

 

Pensana Plc (LSE: PRE) is pleased to advise that it has commenced preparation for a 7,000 metre infill drill programme at its Longonjo rare earth project in Angola. The programme is designed to provide both detailed geological and grade control information ahead of the commencement of mining and stockpiling/blending activities in early 2027 alongside the resource expansion drilling programme announced on 17 November 2025.

Two reverse circulation drilling rigs are planned to be mobilised ahead of drilling activities throughout the anticipated dry season from May through to October 2026. The programme anticipates completion of a 10 x 10 metre drill grid across the weathered run-of-mine from the initial pit(s) production zones/areas.

The Longonjo deposit comprises a near-surface blanket of high-grade, NdPr-rich total rare earth oxides (TREO), with an average depth of approximately 30 metres. Previous drilling has confirmed that mineralisation extends to depths in excess of 100 metres beneath the current resource, indicating significant potential to increase the resource base through further drilling.

During the campaign samples will also be collected at depth to develop a detailed understanding of the full vertical extent of the mineralization and support assessment of the potential for an increase in inferred resources from the existing 313 million tonnes at 1.43% TREO towards one billion tonnes at a similar grade - which would make it one of the world's largest rare earth deposits currently in development .

A laboratory is being procured for delivery to site alongside drill rig mobilisation. This containerised unit will include sample preparation facilities and an automated XRF analyser enabling timeous and cost saving multi-element analysis on site. Grade control drilling will be ongoing for most of the Longonjo life of mine, staying a year ahead of mine planning.

These results will further support the current mine and stockpile blending plan developed with Practara, well before commissioning, and enhances the existing dataset.

About Pensana

Pensana is developing one of the world's largest and highest-grade magnet metal rare earth deposits which will produce initially 20,000 tpa of a clean high value MREC including both LREE and HREE. The plan is to expand production to 40,000 tpa of MREC once initial operations have been established.

The Longonjo operation will extract, concentrate, calcine and chemically refine the free dig material to produce a high-value MREC which will be railed 273 kilometers in containers to the Atlantic port of Lobito for export.

Pensana is looking to establish a world class fully integrated mine-to-magnet supply chain in partnership with US partners and with backing from U.S. Government.

The Longonjo rare earths deposit is located adjacent to the Lobito rail corridor approximately 60 kilometers west of the provincial capital of Huambo in central Angola.

The project currently under development comprises an open pit, concentrator and recovery plants, tailings storage facility (designed to meet the requirements of the Global Industry Standard on Tailings Management), process water supply, bulk power supply, mine infrastructure, workshops, offices, accommodation village, recreational facilities, and other associated infrastructure.

The information contained within this announcement is considered by the Company to constitute inside information as stipulated under the Market Abuse Regulations (EU) No.596/2014. Upon the publication of this announcement via a Regulatory Information Service, this inside information will be considered to be in the public domain. The person responsible for arranging for the release of this announcement on behalf of the Company is Paul Atherley (Chairman).

- ENDS-

For further information, please contact:

Shareholder/analyst enquiries:

Pensana Plc

Paul Atherley, Chairman

IR@pensana.co.uk

Tim George, Chief Executive Officer

Rob Kaplan, Chief Financial Officer



Date   Source Headline
20th Nov 20239:00 amPRNLetter of Intent with Yorkshire Energy Park for Magnet Metal Site
31st Oct 20238:00 amPRNAnnual Financial Report & Notice of AGM
31st Oct 20237:16 amPRNUpdate on Finance for the Longonjo and Saltend Projects
23rd Oct 20237:00 amPRNUK Government Grant Offered for Saltend
16th Oct 20237:00 amPRNMeeting with Minister Nusrat Ghani
20th Sep 20237:00 amPRNPensana and partners win Innovate UK grant to develop a low carbon RE supply chain
14th Sep 20237:00 amPRNMineralogical Results from the Coola Exploration Licence
4th Sep 20237:00 amPRNDirector/PDMR Shareholding
29th Aug 20237:00 amPRNUpdate on Sampling Results from the Coola Exploration Licence
21st Aug 20237:00 amPRNLongonjo Operations Update
31st Jul 20237:00 amPRNDirectors Dealings
21st Jul 20231:27 pmPRNDirectors Dealings
17th Jul 20237:00 amPRNDirectors Dealings
27th Jun 20234:37 pmPRNUpdate on Longonjo Financing and Development
27th Jun 20237:00 amPRNIssue of Equity
28th Apr 20238:20 amPRNMajor shareholders to increase holdings in the Company
1st Dec 202211:45 amRNSResults of Annual General Meeting
1st Dec 202211:45 amRNSAnnual General Meeting - Chairman's Presentation
28th Nov 20227:00 amRNSOperational Update for Saltend and Longonjo
16th Nov 202210:36 amRNSEquity Research and Broker Coverage Reports
14th Nov 20227:00 amRNSExploration Results from Coola Exploration Licence
26th Oct 20227:00 amRNSSaltend and Longonjo Operational Update
18th Oct 20229:00 amRNSInternational Rare Earth Conference Presentation
3rd Oct 20227:00 amRNSPensana signs a MoU for 25% of production
27th Sep 20227:00 amRNSPensana Launches ESG Strategy
20th Sep 20227:00 amRNSPensana and Polestar to create climate-neutral car
2nd Sep 20224:40 pmRNSSecond Price Monitoring Extn
2nd Sep 20224:35 pmRNSPrice Monitoring Extension
1st Sep 20224:35 pmRNSPrice Monitoring Extension
26th Aug 20224:41 pmRNSSecond Price Monitoring Extn
26th Aug 20224:35 pmRNSPrice Monitoring Extension
18th Aug 20229:00 amRNSIndependent and sustainable supply of rare earths
4th Jul 20224:40 pmRNSSecond Price Monitoring Extn
4th Jul 20224:35 pmRNSPrice Monitoring Extension
30th May 202210:28 amRNSPlanning Approval for larger Saltend Chemical Park
25th May 20227:01 amPRNCompletion of FEED and Value Engineering Study
9th May 20227:00 amRNSCompany Update Presentation, Indaba, Cape Town
4th Apr 20227:00 amPRNUpdate on results from the Coola exploration programme
31st Mar 20227:00 amPRNAppointment of Finance Director
30th Mar 20227:00 amPRNInterim results for the 6 months ended 31 Dec 2021
16th Mar 20227:00 amRNSOperational Update
7th Mar 20227:00 amRNSAppointment Announcement
25th Jan 202211:00 amRNSPensana signs co-operation agreement with Equinor
10th Jan 20226:00 pmPRNHolding(s) in Company
30th Dec 20217:00 amPRNReport on Payments to Governments
22nd Dec 20218:00 amPRNIssue of Equity
15th Dec 20214:35 pmRNSPrice Monitoring Extension
9th Dec 20212:22 pmRNSAnnual General Meeting – Chairman's Presentation
9th Dec 20212:04 pmPRNResult of AGM
30th Nov 202110:30 amRNSCritical Minerals & UK Green Economy Presentation

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.