Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPensana Regulatory News (PRE)

Share Price Information for Pensana (PRE)

Share Price is delayed by 15 minutes
Get Live Data
88.10    1.80 (2.09%)
Bid:
87.70
Ask:
88.90
Spread: 1.20 (1.368%)
Market Cap: £311.45m
PRE Live PriceLast checked at - London Stock Exchange

Intraday Pensana Share Chart

Update on Longonjo infill and resource expansion drill programme

21 Jan 2026 07:04

Pensana Plc - Update on Longonjo infill and resource expansion drill programme

Pensana Plc - Update on Longonjo infill and resource expansion drill programme

PR Newswire

LONDON, United Kingdom, January 21

 

 

 

21 January 2026

THIS ANNOUNCEMENT CONTAINS INSIDE INFORMATION

Pensana Plc ("Pensana" or the "Company")

Update on Longonjo infill and resource expansion drill programme

 

Pensana Plc (LSE: PRE) is pleased to advise that it has commenced preparation for a 7,000 metre infill drill programme at its Longonjo rare earth project in Angola. The programme is designed to provide both detailed geological and grade control information ahead of the commencement of mining and stockpiling/blending activities in early 2027 alongside the resource expansion drilling programme announced on 17 November 2025.

Two reverse circulation drilling rigs are planned to be mobilised ahead of drilling activities throughout the anticipated dry season from May through to October 2026. The programme anticipates completion of a 10 x 10 metre drill grid across the weathered run-of-mine from the initial pit(s) production zones/areas.

The Longonjo deposit comprises a near-surface blanket of high-grade, NdPr-rich total rare earth oxides (TREO), with an average depth of approximately 30 metres. Previous drilling has confirmed that mineralisation extends to depths in excess of 100 metres beneath the current resource, indicating significant potential to increase the resource base through further drilling.

During the campaign samples will also be collected at depth to develop a detailed understanding of the full vertical extent of the mineralization and support assessment of the potential for an increase in inferred resources from the existing 313 million tonnes at 1.43% TREO towards one billion tonnes at a similar grade - which would make it one of the world's largest rare earth deposits currently in development .

A laboratory is being procured for delivery to site alongside drill rig mobilisation. This containerised unit will include sample preparation facilities and an automated XRF analyser enabling timeous and cost saving multi-element analysis on site. Grade control drilling will be ongoing for most of the Longonjo life of mine, staying a year ahead of mine planning.

These results will further support the current mine and stockpile blending plan developed with Practara, well before commissioning, and enhances the existing dataset.

About Pensana

Pensana is developing one of the world's largest and highest-grade magnet metal rare earth deposits which will produce initially 20,000 tpa of a clean high value MREC including both LREE and HREE. The plan is to expand production to 40,000 tpa of MREC once initial operations have been established.

The Longonjo operation will extract, concentrate, calcine and chemically refine the free dig material to produce a high-value MREC which will be railed 273 kilometers in containers to the Atlantic port of Lobito for export.

Pensana is looking to establish a world class fully integrated mine-to-magnet supply chain in partnership with US partners and with backing from U.S. Government.

The Longonjo rare earths deposit is located adjacent to the Lobito rail corridor approximately 60 kilometers west of the provincial capital of Huambo in central Angola.

The project currently under development comprises an open pit, concentrator and recovery plants, tailings storage facility (designed to meet the requirements of the Global Industry Standard on Tailings Management), process water supply, bulk power supply, mine infrastructure, workshops, offices, accommodation village, recreational facilities, and other associated infrastructure.

The information contained within this announcement is considered by the Company to constitute inside information as stipulated under the Market Abuse Regulations (EU) No.596/2014. Upon the publication of this announcement via a Regulatory Information Service, this inside information will be considered to be in the public domain. The person responsible for arranging for the release of this announcement on behalf of the Company is Paul Atherley (Chairman).

- ENDS-

For further information, please contact:

Shareholder/analyst enquiries:

Pensana Plc

Paul Atherley, Chairman

IR@pensana.co.uk

Tim George, Chief Executive Officer

Rob Kaplan, Chief Financial Officer



Date   Source Headline
6th Nov 20207:00 amRNSNotice of Annual General Meeting
2nd Nov 20207:00 amRNSAppointment of Rt.Hon.Baroness Northover PC as NED
30th Oct 20207:00 amRNSQuarterly Activities and Cashflow Report
19th Oct 20207:00 amRNSCoola exploration programmes in full swing
16th Oct 20204:40 pmRNSSecond Price Monitoring Extn
16th Oct 20204:35 pmRNSPrice Monitoring Extension
16th Oct 20202:05 pmRNSSecond Price Monitoring Extn
16th Oct 20202:00 pmRNSPrice Monitoring Extension
12th Oct 20207:00 amRNSStudy into UK based Rare Earth processing facility
9th Oct 20207:00 amRNSDirectorate change
5th Oct 20207:00 amRNSSuccessful development of MREC flow sheet
1st Oct 20207:00 amRNSReleased of 2020 Annual Report
25th Sep 20205:28 pmRNSIssue of equity to Angolan Sovereign Wealth Fund
21st Sep 20202:01 pmRNSPrice Monitoring Extension
21st Sep 20207:00 amRNSRoyalty over Tanzania gold exploration assets
14th Sep 20207:00 amRNSLongonjo Mineral Resource estimate upgraded
12th Aug 20207:43 amRNSAppointment of Broker and Company Secretaries
11th Aug 20209:31 amRNSAdmission of shares
10th Aug 202011:06 amRNSSecond Price Monitoring Extn
10th Aug 202011:00 amRNSPrice Monitoring Extension
10th Aug 20207:00 amRNSAppointment of an Non-Executive Director
4th Aug 20207:00 amRNSFinal high-grade intersections at Longonjo
31st Jul 20204:41 pmRNSSecond Price Monitoring Extn
31st Jul 20204:35 pmRNSPrice Monitoring Extension
31st Jul 20207:00 amRNSQuarterly activities and Cashflow Report
29th Jul 20207:00 amRNSAppointment of London broker SI Capital
27th Jul 20207:00 amRNSAppointment of Paradigm Project Management
20th Jul 20207:00 amRNSEPCF Heads of Agreement for Longonjo Project
13th Jul 20208:23 amRNSFurther high grade drill results at Longonjo
6th Jul 20207:00 amRNSAdmission to Trading on the London Stock Exchange
14th Apr 20103:13 pmRNSScheme becomes effective
13th Apr 20104:23 pmRNSCourt order sanction Scheme
13th Apr 20108:00 amRNSSuspension - Pan Andean Resources plc
13th Apr 20107:00 amRNSSuspension of Trading in Pan Andean Shares
8th Apr 20104:23 pmRNSAmendment To Scheme Timetable
30th Mar 20105:00 pmRNSTotal Voting Rights
24th Mar 20104:42 pmRNSTR-1: Notification of Major Interest in Shares
24th Mar 20104:25 pmRNSDirector/PDMR Shareholding
22nd Mar 20102:29 pmRNSResult of Court Meeting and General Meeting
16th Mar 20104:09 pmRNSIssue of Equity
26th Feb 20107:00 amRNSOffer Update
24th Dec 20099:57 amRNSDirector/PDMR Shareholding
17th Dec 20097:00 amRNSHalf Yearly Report
9th Dec 20097:00 amRNSOffer by Petrominerales
28th Oct 200912:14 pmRNSAGM Statement
30th Sep 20099:59 amRNSPosting of Annual Report
29th Sep 20097:00 amRNSFinal Results
18th Jun 20097:00 amRNSOperational Update
19th May 20097:00 amRNSSeismic Acquisition Underway Over Block 114
15th May 20097:00 amRNSSurvey Over Block 141 Underway

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.