Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPowerhouse Ener Regulatory News (PHE)

Share Price Information for Powerhouse Ener (PHE)

Share Price is delayed by 15 minutes
Get Live Data
0.21    0.00 (0.00%)
Bid:
0.20
Ask:
0.22
Spread: 0.02 (10.00%)
Market Cap: £10.76m
PHE Live PriceLast checked at - London Stock Exchange

Intraday Powerhouse Ener Share Chart

Operational progress update

17 Dec 2020 07:00

POWERHOUSE ENERGY GROUP PLC - Operational progress update

POWERHOUSE ENERGY GROUP PLC - Operational progress update

PR Newswire

London, December 16

17th December 2020

Powerhouse Energy Group plc

Operational progress update 

Powerhouse Energy Group plc (AIM: PHE) ("Powerhouse" or the "Company"), the sustainable hydrogen company pioneering hydrogen production from waste plastic, is pleased to provide an update on operational progress since the AGM held in September 2020. 

We are pleased to announce that Peel L&P Environmental (“Peel”) has commenced site preparation for the first commercial DMG® plant at Protos with initial ground works. Peel has also embarked on phase 2 of infrastructure works at Protos which include the preparation of access roads and laydown areas for the works and utility service installation on Protos Plot 10b where the DMG® plant will be installed.

This site work is ongoing whilst contract and post FEED (Front-End Engineering Design) engineering definition proceeds for the site including:

Negotiations with potential construction delivery contractors; Safety system procurement and the implementation of operational safety systems based on a HAZOP (Hazard and Operability Analysis study) study for Powerhouse’s DMG process for the Protos application which has been successfully completed by a joint team of Powerhouse, Peel and the engineering consultants ; Provision of operational definition material for a future Operations & Maintenance contract tender; and Further refinement to the construction measures to be applied in line with modular build strategy.

Powerhouse has successfully recruited qualified and experienced operational and technical staff this quarter, building the team in engineering with senior process engineers, application engineers and support staff joining the team to be based at the Thornton research and development centre, supporting further technical advancements , Protos project activites and new business development. 

To facilitate expansion of the DMG® technology, Powerhouse has developed a design for a solution that can export larger volumes of hydrogen, broadening the scope for Peel to engage with smaller fleet consumers of hydrogen who require supply to their own or third party off-site locations. In this context, Peel has been progressing two sites through pre-planning engineering, to incorporate these new DMG technology improvements. Consultation with the local council authorities is expected to be initiated shortly. 

Powerhouse has welcomed the UK Government’s recent ten point plan for a green industrial revolution, which highlighted the need for hydrogen production in order to reach net zero and reduce carbon emissions.

Commenting on progress, Tim Yeo, Executive Chairman of Powerhouse Energy, said:

“We welcome the commencement of activity at Protos with clearance of the site where the first commercial scale plant will be built, which will help accelerate the UK’s clean energy transition. Powerhouse is getting down to business ahead of intense activity expected in 2021 as demand for our waste plastic to hydrogen technology gains rapid momentum. The Company has strengthened the board and appointed a number of key experts to our operational team. I am looking forward to the next year as the opportunity for Powerhouse continues to grow and our clean energy technology can become part of the solution to air pollution and waste plastic”.

ENDS

For more information, contact:

Powerhouse Energy Group plcTel: +44 (0) 203 368 6399
Tim Yeo, Executive Chairman 
WH Ireland Limited (Nominated Adviser)Tel: +44 (0) 207 220 1666
James Joyce / Lydia Zychowska
Turner Pope Investments Ltd (Joint Broker)Tel: +44 (0) 203 657 0050
Andrew Thacker 
Ikon Associates (media enquiries)Tel: +44 (0) 1483 271291
Adrian Shaw SisterSmith PR (media enquiries) Becca Smith Mob: +44 (0) 7979 900733 Mob: +44 (0) 7766522305

Notes for editors:

About Powerhouse Energy Group plc

Powerhouse, the sustainable hydrogen company, has developed a proprietary process technology - DMG® - which can utilise waste plastic, end-of-life-tyres, and other waste streams to efficiently and economically convert them into syngas from which valuable products such as chemical precursors, hydrogen, electricity and other industrial products may be derived. Powerhouse's technology is one of the world's first proven, distributed, modular, hydrogen from waste (HfW) process. 

The Powerhouse DMG® process can generate up to 2 tonnes of road-fuel quality hydrogen and more than 58MWh of exportable electricity per day. 

Powerhouse's process produces low levels of safe residues and requires a small operating footprint, making it suitable for deployment at enterprise and community level. As announced on 11th February 2020 under its Supplemental Agreement with Peel Environmental, Powerhouse will receive an annual license fee of GBP500,000 in respect of each project which is commissioned. 

Powerhouse is quoted on the London Stock Exchange's AIM Market under the ticker: PHE and is incorporated in the United Kingdom. 

 For more information see www.powerhouseenergy.net

Date   Source Headline
17th Apr 20187:00 amPRNDistribution Agreement
13th Apr 20187:00 amRNSProject Development Partner : Commercial Update
10th Apr 20187:00 amRNSAppointment of Commercial Operations Manager
20th Mar 20182:05 pmRNSSecond Price Monitoring Extn
20th Mar 20182:00 pmRNSPrice Monitoring Extension
7th Mar 20187:00 amPRNShare Options Grants to Directors
2nd Mar 20187:00 amPRNProgress Update
27th Feb 20187:00 amPRNDirector/PDMR Shareholding
23rd Feb 20182:12 pmPRNDirector/PDMR Shareholding
20th Feb 20187:00 amPRNMemorandum of Understanding
12th Feb 20187:00 amPRNCorrection - Updated Corporate Presentation
9th Feb 20187:00 amPRNUpdated Corporate Presentation
6th Feb 201811:25 amPRNHolding(s) in Company
31st Jan 20183:56 pmPRNIssue of Equity
9th Jan 20187:00 amPRNFull Year Business Update
18th Dec 20177:00 amPRNHeads of Terms agreed for commercial DMG site
22nd Nov 20177:00 amPRNCompletion of Pre-FEED of Commercial DMG© System
23rd Oct 20177:00 amPRNProgress on advance towards hydrogen purification
20th Oct 20177:00 amRNSSuccessful demonstration of G3-UHT system
27th Sep 20177:00 amPRNInterim Results
26th Sep 201710:14 amRNSOpen days and technology demonstrations
25th Sep 20175:08 pmPRNHolding(s) in Company
20th Sep 20177:00 amPRNMOU for waste-to-hydrogen facilities in state of Qatar
31st Aug 20172:00 pmPRNIssue of Equity
24th Aug 20177:00 amPRNAppointment of Chairman and Completion of Fundraise
21st Aug 20177:00 amPRNExtended Trial Produces Over 50% hydrogen Syngas
9th Aug 20177:00 amPRNG3-UHt Demonstration Update
31st Jul 20177:00 amPRNSuccessful Production of Syngas
27th Jul 20171:06 pmRNSResult of AGM
27th Jul 20177:00 amRNSInitiation of Coverage by Align Research
17th Jul 20176:25 pmPRNNotification of Major Interest in Shares
10th Jul 20177:00 amRNSPowerHouse engagement via Vox Markets
6th Jul 20177:00 amRNSProactive Investors Broadcast
23rd Jun 20177:00 amRNSInvestor Event
21st Jun 20173:22 pmPRNIssue of Equity
16th Jun 20177:00 amPRNAnnual Financial Report
5th Jun 20177:00 amPRNCollaboration Agreement of up to £500,000
26th May 20172:48 pmPRNNotification of Major Holdings
26th May 20177:00 amPRNNew Advisory Panel Appointment
22nd May 20173:02 pmPRNDirectorate Change
22nd May 20177:24 amPRNNew Advisory Panel
4th May 20177:00 amPRNSiting of G3-UHT Unit
21st Apr 20177:00 amPRNSuccessful re-commissioning of G3-UHt unit
31st Mar 20177:00 amRNSInvestor Event
28th Mar 20177:00 amPRNAppointment of CFO and Corporate Presentation
27th Mar 20171:10 pmRNSUK Investor Show 1 April 2017
24th Mar 20177:00 amPRNUpdate on G3-UHt Gasification System
20th Mar 20177:00 amPRNRe Directorate
15th Mar 20177:00 amPRNIssue of Equity and General Update
6th Mar 20177:16 amPRNAFC Fuel Cell Order

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.