Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPowerhouse Ener Regulatory News (PHE)

Share Price Information for Powerhouse Ener (PHE)

Share Price is delayed by 15 minutes
Get Live Data
0.21    0.00 (0.00%)
Bid:
0.20
Ask:
0.22
Spread: 0.02 (10.00%)
Market Cap: £10.76m
PHE Live PriceLast checked at - London Stock Exchange

Intraday Powerhouse Ener Share Chart

Operational progress update

17 Dec 2020 07:00

POWERHOUSE ENERGY GROUP PLC - Operational progress update

POWERHOUSE ENERGY GROUP PLC - Operational progress update

PR Newswire

London, December 16

17th December 2020

Powerhouse Energy Group plc

Operational progress update 

Powerhouse Energy Group plc (AIM: PHE) ("Powerhouse" or the "Company"), the sustainable hydrogen company pioneering hydrogen production from waste plastic, is pleased to provide an update on operational progress since the AGM held in September 2020. 

We are pleased to announce that Peel L&P Environmental (“Peel”) has commenced site preparation for the first commercial DMG® plant at Protos with initial ground works. Peel has also embarked on phase 2 of infrastructure works at Protos which include the preparation of access roads and laydown areas for the works and utility service installation on Protos Plot 10b where the DMG® plant will be installed.

This site work is ongoing whilst contract and post FEED (Front-End Engineering Design) engineering definition proceeds for the site including:

Negotiations with potential construction delivery contractors; Safety system procurement and the implementation of operational safety systems based on a HAZOP (Hazard and Operability Analysis study) study for Powerhouse’s DMG process for the Protos application which has been successfully completed by a joint team of Powerhouse, Peel and the engineering consultants ; Provision of operational definition material for a future Operations & Maintenance contract tender; and Further refinement to the construction measures to be applied in line with modular build strategy.

Powerhouse has successfully recruited qualified and experienced operational and technical staff this quarter, building the team in engineering with senior process engineers, application engineers and support staff joining the team to be based at the Thornton research and development centre, supporting further technical advancements , Protos project activites and new business development. 

To facilitate expansion of the DMG® technology, Powerhouse has developed a design for a solution that can export larger volumes of hydrogen, broadening the scope for Peel to engage with smaller fleet consumers of hydrogen who require supply to their own or third party off-site locations. In this context, Peel has been progressing two sites through pre-planning engineering, to incorporate these new DMG technology improvements. Consultation with the local council authorities is expected to be initiated shortly. 

Powerhouse has welcomed the UK Government’s recent ten point plan for a green industrial revolution, which highlighted the need for hydrogen production in order to reach net zero and reduce carbon emissions.

Commenting on progress, Tim Yeo, Executive Chairman of Powerhouse Energy, said:

“We welcome the commencement of activity at Protos with clearance of the site where the first commercial scale plant will be built, which will help accelerate the UK’s clean energy transition. Powerhouse is getting down to business ahead of intense activity expected in 2021 as demand for our waste plastic to hydrogen technology gains rapid momentum. The Company has strengthened the board and appointed a number of key experts to our operational team. I am looking forward to the next year as the opportunity for Powerhouse continues to grow and our clean energy technology can become part of the solution to air pollution and waste plastic”.

ENDS

For more information, contact:

Powerhouse Energy Group plcTel: +44 (0) 203 368 6399
Tim Yeo, Executive Chairman 
WH Ireland Limited (Nominated Adviser)Tel: +44 (0) 207 220 1666
James Joyce / Lydia Zychowska
Turner Pope Investments Ltd (Joint Broker)Tel: +44 (0) 203 657 0050
Andrew Thacker 
Ikon Associates (media enquiries)Tel: +44 (0) 1483 271291
Adrian Shaw SisterSmith PR (media enquiries) Becca Smith Mob: +44 (0) 7979 900733 Mob: +44 (0) 7766522305

Notes for editors:

About Powerhouse Energy Group plc

Powerhouse, the sustainable hydrogen company, has developed a proprietary process technology - DMG® - which can utilise waste plastic, end-of-life-tyres, and other waste streams to efficiently and economically convert them into syngas from which valuable products such as chemical precursors, hydrogen, electricity and other industrial products may be derived. Powerhouse's technology is one of the world's first proven, distributed, modular, hydrogen from waste (HfW) process. 

The Powerhouse DMG® process can generate up to 2 tonnes of road-fuel quality hydrogen and more than 58MWh of exportable electricity per day. 

Powerhouse's process produces low levels of safe residues and requires a small operating footprint, making it suitable for deployment at enterprise and community level. As announced on 11th February 2020 under its Supplemental Agreement with Peel Environmental, Powerhouse will receive an annual license fee of GBP500,000 in respect of each project which is commissioned. 

Powerhouse is quoted on the London Stock Exchange's AIM Market under the ticker: PHE and is incorporated in the United Kingdom. 

 For more information see www.powerhouseenergy.net

Date   Source Headline
12th May 20119:46 amRNSFurther re: licence discussions
3rd May 20118:57 amRNSSch 1 update - Bidtimes plc
20th Apr 201112:53 pmRNSLicence Discussions
12th Apr 201111:14 amRNSSchedule 1 - Bidtimes plc
8th Apr 20112:25 pmRNSAmendment to Warrant exercise price
1st Apr 20117:30 amRNSProposed acquisition of PowerHouse Energy, Inc.
1st Apr 20117:30 amRNSRestoration - Bidtimes Plc
22nd Mar 20113:30 pmRNSStatement re. Suspension
22nd Mar 20113:30 pmRNSSuspension - Bidtimes Plc
30th Sep 20104:36 pmRNSHalf Yearly Report
27th Jul 201010:41 amRNSResult of AGM
12th Jul 20107:00 amRNSAdviser - change of name
21st Jun 20107:00 amRNSFinal Results
16th Feb 201010:55 amRNSChange of accounting reference date
1st Feb 201011:04 amRNSDirectorate Change
1st Feb 20107:00 amRNSChange of Adviser
16th Dec 20094:15 pmRNSInvesting Policy Update
21st Sep 200910:53 amRNSResult of AGM
28th Aug 200912:46 pmRNSAnnual Financial Report
28th Aug 20097:00 amRNSFinal Results
12th Mar 20097:00 amRNSExploration Activities Update
28th Nov 20087:00 amRNSInterim Results
23rd Jul 200811:38 amRNSDirector/PDMR Shareholding
22nd Jul 20083:54 pmRNSDirector/PDMR Shareholding
10th Jul 200811:51 amRNSHolding(s) in Company
1st Jul 20087:01 amRNSResult of AGM
1st Jul 20087:00 amRNSRestoration - Bidtimes plc
1st Jul 20087:00 amRNSResult of EGM
9th Jun 200812:11 pmRNSAnnual Report and Accounts
6th Jun 20081:10 pmRNSFinal Results
6th Jun 200812:59 pmRNSRevision of Investment Strate
23rd May 200810:28 amRNSChange of Adviser
13th May 20083:22 pmRNSHolding(s) in Company
10th Dec 20077:00 amRNSStatement re. Suspension
10th Dec 20077:00 amRNSSuspension - Bidtimes plc
27th Nov 20077:00 amPRNHalf-yearly Report
15th Oct 20074:26 pmPRNResult of AGM
19th Sep 200710:49 amPRNHolding(s) in Company
10th Sep 200712:38 pmPRNHolding(s) in Company
30th Aug 20077:01 amRNSAdrian Collins Chairman
29th Aug 20073:58 pmPRNFinal Results
10th Aug 20073:40 pmPRNAIM Rule 26
8th Aug 20073:34 pmPRNHolding(s) in Company
23rd Jul 20074:21 pmPRNDisposal
13th Jul 200712:52 pmPRNDirector Declaration
26th Jun 200712:57 pmPRNResult of EGM
25th May 20077:00 amPRNProposed sale of investment property
23rd Apr 200710:14 amPRNHolding(s) in Company
19th Apr 200711:03 amPRNDirector Declaration
16th Apr 200712:33 pmPRNHolding(s) in Company

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.