Stephan Bernstein, CEO of GreenRoc, details the PFS results for the new graphite processing plant. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPowerhouse Ener Regulatory News (PHE)

Share Price Information for Powerhouse Ener (PHE)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 1.05
Bid: 1.00
Ask: 1.10
Change: 0.05 (5.00%)
Spread: 0.10 (10.00%)
Open: 1.00
High: 1.10
Low: 1.025
Prev. Close: 1.00
PHE Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Extended Trial Produces Over 50% hydrogen Syngas

21 Aug 2017 07:00

POWERHOUSE ENERGY GROUP PLC - Extended Trial Produces Over 50% hydrogen Syngas

POWERHOUSE ENERGY GROUP PLC - Extended Trial Produces Over 50% hydrogen Syngas

PR Newswire

London, August 21

21 August 2017

PowerHouse Energy Group plc

(“PowerHouse” or “the Company”)

Extended Trial Produces Over 50% hydrogen Syngas

PowerHouse Energy Group plc (AIM: PHE), the company focused on ultra high temperature gasification waste-to-hydrogen, waste-to-energy, and the creator of Distributed Modular Gasification (DMG)© systems, is pleased to announce that subsequent to the re-commissioning operation of G3-UHt gasification unit (announcement 31 July, 2017) the Company has completed its first extended technical trial of the Distributed Modular Gasification (DMG)© gasification process at the Energy Center of Thornton Science Park, UK.

As previously announced, the Company has begun a robust program of testing and technical data collection for integration into the process engineering basis of design for the commercial roll-out of DMG. Distributed Modular Gasification© is a mechanism for the eradication of waste, the generation of distributed electricity, and, most importantly, the production of distributed hydrogen.

Operating on a feedstock of tyre crumb, PowerHouse engineers were able to demonstrate control of the process at ultra-high temperature which led to the generation of synthesis gas (syngas.) According to onsite, in-line analytical instrumentation, the syngas produced was greater than 50% hydrogen by volume. The remaining, measurable, constituent elements of the syngas were CO (carbon monoxide) and CH4 (methane.) Importantly, the in-line gas analysis equipment detected absolutely no CO2 in the gas stream generated by the Unit. A more rigorous analysis of the syngas produced in the DMG process will be conducted by certified external laboratories in future trials.

The G3-UHt unit was disassembled subsequent to its previous trial for a thorough post-operational review. The results of that review led to minor modifications of the operational parameters by which the most recent trial was conducted. Similarly, the unit will again undergo a thorough dis-assembly, inspection, and evaluation of each individual component of the system to ensure continuity of plan.

“PowerHouse has long focused on the efficient generation of energy from waste. However, our ability to generate a concentrated volume of hydrogen from waste, on a distributed basis, sets us apart from others. We believe that DMG is critical to opening the door to the coming hydrogen economy,” said Keith Allaun, Executive Chairman. “These trials will allow us to manage and maximise the constituent elements of the syngas we create to best serve our business model objectives of delivering hydrogen as a road-fuel.

David Ryan, PHE Executive Director of Programme Development, said: “Over the course of the past week, and after two weeks of evaluation and refitting of the G3 unit, the system operated without a hitch. Our objectives for this trial – in addition to a successful operation over an extended period – were to begin to hone in on the ideal dwell time for the tyre crumb feedstock in the gasification reactor, the optimal injection of steam at various stages of the process, and, of course, the generation of a syngas of greater than 50% hydrogen. The team was successful on all fronts. By varying the operational parameters we were able to create a syngas with an energy value of over 24MJ/m3 or an extremely hydrogen-rich syngas. Our design program has benefited tremendously from these results and we’re confident in our ability to continue to improve upon them and incorporate the data into our process design.”

As previously announced, demonstration visits for interested parties and shareholders will commence upon the completion of summer holidays and will be communicated in due course.

For more information, contact:

PowerHouse Energy Group plc Keith Allaun, Executive ChairmanTel: +44 (0) 203 368 6399
WH Ireland Limited (Nominated Adviser) James Joyce / James BavisterTel: +44 (0) 207 220 1666
Turner Pope Investments Ltd (Joint Broker) Ben Turner / James PopeTel: +44 (0) 203 621 4120
Smaller Company Capital Limited (Joint Broker) Jeremy WoodgateTel: +44 (0) 203 651 2910
Allerton Communications (Media Relations) Peter Curtain peter.curtain@allertoncomms.co.uk Tel: +44 (0) 203 137 2500

About PowerHouse Energy

PowerHouse Energy Group plc is the developer of the G3-UHt Ultra High Temperature Gasification Waste-to-Energy unit, and the creator of Distributed Modular Gasification© which allows for the elimination of waste, the generation of distributed electricity, and the production of distributed hydrogen.

The Company is focused on technologies to enable projects for energy recovery from municipal and industrial waste streams that would otherwise be directed to landfills and incinerators; or from renewable and alternative fuels such as biomass, tyres, and plastics to create syngas for power generation, or high-quality hydrogen for transportation. Distributed Modular Gasification© allows for easy, economical, deployment and scaling of an environmentally sound solution to the growing challenges of waste elimination, electricity demand, and distributed hydrogen production.

Distributed Modular Gasification and DMG are copyrights of PowerHouse Energy Group plc.

PowerHouse is quoted on the London Stock Exchange's AIM Market. The Company is incorporated in the United Kingdom.

For more information see www.powerhouseenenergy.net. PowerHouse may also be followed on Vox Markets at www.voxmarkets.co.uk/company/PHE.

Date   Source Headline
16th Apr 20247:00 amRNSTechnical Centre Update
18th Mar 20247:00 amRNSSubsidiary Contract
11th Mar 20247:00 amRNSUpdate on Longford Project JV
22nd Feb 20247:00 amRNSFramework Agreement with National Hydrogen
19th Feb 202412:32 pmRNSCorporate Activity Update
6th Feb 20245:20 pmRNSUpdate on European Patent Claim
31st Jan 20247:00 amRNSAppointment of Nominated & Financial Adviser
12th Dec 20237:00 amRNSDirector’s Dealing
11th Dec 20237:00 amRNSDirector’s Dealing
8th Dec 20237:00 amRNSDirectorate Update
27th Nov 20237:00 amRNSDirectorate Update
15th Nov 20237:00 amRNSDirectorate Change
6th Nov 20237:00 amRNSEuropean Patent update
30th Oct 20237:00 amRNSDeferral of Commitment to JV with HUI
6th Oct 20232:16 pmRNSPowerhouse Technology Centre Project Update
15th Sep 20237:00 amRNSEuropean Patent Grant Confirmed
7th Sep 20234:05 pmRNSResult of AGM
6th Sep 20237:05 amRNSHalf Year Report
6th Sep 20237:00 amRNSChange of directorate
22nd Aug 20237:00 amRNSPlacing to raise £1,000,000 and issue of equity
16th Aug 20237:00 amRNSNotice of AGM
13th Jul 20237:00 amRNSEuropean Patent Application Allowed
30th Jun 20237:00 amRNSAudited Results for Year Ended 31 December 2022
22nd Jun 20237:00 amRNSAcquisition of entire shareholding of Engsolve Ltd
30th May 20237:00 amRNSAppointment of representative in Northern Ireland
2nd May 20237:00 amRNSAcquisition of the entire shareholding of Protos
3rd Apr 20237:00 amRNSExtension of agreements with Peel
31st Mar 20237:00 amRNSPHE discussions with National Hydrogen Australia
21st Mar 20237:00 amRNSJoint Venture with HUI Plc
16th Mar 20239:00 amRNSCompletion of lease on Technology Centre
27th Feb 20237:00 amRNSHolding(s) in Company
27th Feb 20237:00 amRNSHolding(s) in Company
27th Feb 20237:00 amRNSHolding(s) in Company
22nd Feb 20234:40 pmRNSSecond Price Monitoring Extn
22nd Feb 20234:35 pmRNSPrice Monitoring Extension
22nd Feb 202311:05 amRNSSecond Price Monitoring Extn
22nd Feb 202311:00 amRNSPrice Monitoring Extension
22nd Feb 20237:00 amRNSFramework Services agreement with Petrofac
16th Feb 202311:05 amRNSDirectorate Change
23rd Jan 202312:27 pmRNSUpdate on Konin facility, Poland
12th Jan 202311:05 amRNSSecond Price Monitoring Extn
12th Jan 202311:00 amRNSPrice Monitoring Extension
11th Jan 20234:40 pmRNSSecond Price Monitoring Extn
11th Jan 20234:35 pmRNSPrice Monitoring Extension
4th Jan 20234:40 pmRNSSecond Price Monitoring Extn
4th Jan 20234:35 pmRNSPrice Monitoring Extension
30th Dec 20227:00 amRNSDirectorate Changes and Operational Update
19th Dec 20222:05 pmRNSSecond Price Monitoring Extn
19th Dec 20222:00 pmRNSPrice Monitoring Extension
19th Dec 202211:05 amRNSSecond Price Monitoring Extn

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.