Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPantheon Resources plc Regulatory News (PANR)

Share Price Information for Pantheon Resources plc (PANR)

Share Price is delayed by 15 minutes
Get Live Data
15.98    -0.39 (-2.38%)
Bid:
15.98
Ask:
16.21
Spread: 0.23 (1.439%)
Market Cap: £232.97m
PANR Live PriceLast checked at - London Stock Exchange

Intraday Pantheon Resources plc Share Chart

Drilling Update

5 Jun 2009 07:16

RNS Number : 4311T
Pantheon Resources PLC
05 June 2009
 

Press release

 June 2009

Drilling Update 

Pantheon Resources plc ("Pantheon" or the "Company"), the AIM-quoted oil and gas exploration company active in Louisiana and Texas, issues the following operational update.

Jumonville #2, Bullseye Prospect, Iberville Parish, Louisiana

The testing programme is focusing on three separate intervals in the Jumonville #2 well: 

the Miogyp (this zone is currently producing in Jumonville #1); 

the Cib Haz 6; and 

the Cib Haz 7.

The first phase of testing has commenced in the deepest of these intervals, the Cib Haz 7, where approximately 21 foot ('ft') of a 27 ft interval was perforated. Communications with the perforated interval appear to be limited which is inconsistent with other technical data derived from the well which includes side wall cores and a full suite of electric logs. Accordingly the forward operation will be to re-enter the well with a wireline tool. The aim is to determine whether the charge perforation array discharged correctly, or whether there is some blockage in the wellbore.

This apparent lack of communication is surprising and is inconsistent with the technical data derived from the well. These data included side wall cores and a full suite of electric logs. 

The results obtained from the wireline tool will be evaluated and a revised testing programme will be determinedOptions for the new testing programme might include re-perforating the interval, cleanout of any blockage or other actions determined by the new well bore analysis. 

The Cib Haz interval being tested (Cib Haz 7) appears to have reservoir properties similar to those in an analogue well that produced from the Cib Haz interval at similar depths and pressures. This is located approximately eight miles west of the Bullseye prospect in the Bayou Sorrel Field. The reservoir in the Bayou Sorrel Field appears to have similar seismic appearance to the Bullseye reservoir with possible multiple stacked sandstone packages. A major difference between the two wells is that the producing interval in the analogue well is much less sand-rich than either of the two potential Cib Haz reservoirs in Jumonville #2.

Dependent upon the outcome of the test results, the Jumonville #2 well will be put on immediate production from either one of the two Cib Haz intervals or else the known productive Miogyp sandstone. The latter is about 20 feet thick in the Jumonville #2 well. Surface facilities are being installed and connected to the already established sales line that currently handles the Jumonville #1 oil and gas production.

Vision Rice University #1Tyler County 

The Vision Rice University #1 well has experienced significant delays since encountering very high pressure gradients and natural gas flows. As previously announced, these delays have resulted in additional costs becoming payable by the Company. After setting a slotted liner in the horizontal segment of the wellbore, service company personnel failed to set a production packer, on two separate occasions. These failures required the well to be killed with heavy drilling mud on both occasions. On the third attempt, a packer and production tubing were successfully installed.

During subsequent clean-up operations the well bore became blocked with packer debris and de-hydrated drilling mud. This caused further delays. The operator has proposed to move a coiled tubing unit on location to perform the necessary clean-out operations as soon as suitable equipment becomes availableOnce the Company receives clarity on timing from the operator it will inform the market accordingly. Whilst these delays are unfortunate the Company does not believe the prospectivity of the well to be affected materially.

Jay Cheatham, CEO of Pantheon stated, "The blockages and delays that have occurred in the testing of both Jumonville #2 and Vision Rice University # 1 whilst frustrating, are not unusual when dealing with extremely high pressure reservoirs. I am confident that both operations will be successful in dealing with these issues."

In accordance with the AIM Rules, the information in this announcement has been reviewed and signed off by Jay Cheatham, who has over 30 years' relevant experience within the sector.

For further information on Pantheon Resources plc, see the website at www.pantheonresources.com

 

Enquiries:

Pantheon Resources plc

Jay Cheatham, CEO

+44 20 7484 5359

Oriel Securities Limited (Nominated Adviser)

Michael Shaw

+44 20 7710 7600

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLSSLSMISUSEFM
Date   Source Headline
15th Nov 20078:43 amRNSProduction Update - Oct 2007
13th Nov 20079:29 amRNSHolding(s) in Company
2nd Nov 20074:23 pmRNSHolding(s) in Company
2nd Nov 20072:50 pmRNSOption Grant
25th Oct 200712:12 pmRNSHolding(s) in Company
25th Oct 200712:09 pmRNSHolding(s) in Company
25th Oct 200712:08 pmRNSHolding(s) in Company
19th Oct 20072:42 pmRNSHolding(s) in Company
16th Oct 20077:01 amRNSSpudding of Nottoway Prospect
16th Oct 20077:00 amRNSProduction Update
4th Oct 20077:01 amRNSProduction Update - Sept 2007
19th Sep 20077:01 amRNSFirst Production-Dunn Deep #2
17th Sep 20072:38 pmRNSHolding(s) in Company
17th Sep 20072:26 pmRNSProduction Update-August 2007
14th Sep 20075:20 pmRNSHolding(s) in Company
11th Sep 200710:43 amRNSFirst Production from Wilson
7th Sep 20077:01 amRNSDunn Deep Update
3rd Sep 20073:00 pmRNSHolding(s) in Company
3rd Sep 20077:01 amRNSAppointment of Director
15th Aug 20077:00 amRNSDrilling Programme Update
7th Aug 20077:01 amRNSAddition to Portfolio
6th Aug 20077:59 amRNSProduction Update - July 2007
30th Jul 20074:24 pmRNSHolding(s) in Company
25th Jul 20074:08 pmRNSHolding(s) in Company
17th Jul 20077:00 amRNSAddition to portfolio
10th Jul 20074:21 pmRNSHolding(s) in Company
5th Jul 200711:45 amRNSHolding(s) in Company
5th Jul 20077:46 amRNSProduction Update - June 2007
25th Jun 20072:58 pmRNSProduction Update-June 2007
25th Jun 20077:36 amRNSProduction Update - June 2007
19th Jun 200711:45 amRNSHolding(s) in Company
18th Jun 20078:32 amRNSWilson Update
8th Jun 20073:13 pmRNSProduction Update - May 2007
6th Jun 20072:57 pmRNSHolding(s) in Company
4th Jun 20078:12 amRNSWilson Test Result
29th May 20079:40 amRNSWilson Drilling Update
22nd May 20078:33 amRNSWilson Drilling Update
21st May 20077:30 amRNSAddition to portfolio
16th May 20077:49 amRNSDrilling Update on Wilson
14th May 20074:03 pmRNSHolding(s) in Company
10th May 20078:47 amRNSProduction Update- April 2007
3rd May 200710:50 amRNSHolding(s) in Company
2nd May 20078:19 amRNSHolding(s) in Company
27th Apr 20072:03 pmRNSHolding(s) in Company
20th Apr 20077:01 amRNSWilson Drilling Update
11th Apr 20077:01 amRNSProduction Update-March 2007
10th Apr 20077:43 amRNSNatural Gas Encountered
5th Apr 20077:01 amRNSDrilling Report
30th Mar 20076:06 pmRNSInterim Results
29th Mar 200710:55 amRNSProject Wharton Spudded

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.