Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPantheon Resources plc Regulatory News (PANR)

Share Price Information for Pantheon Resources plc (PANR)

Share Price is delayed by 15 minutes
Get Live Data
16.37    -1.35 (-7.62%)
Bid:
16.42
Ask:
16.50
Spread: 0.08 (0.487%)
Market Cap: £238.66m
PANR Live PriceLast checked at - London Stock Exchange

Intraday Pantheon Resources plc Share Chart

Drilling Update

5 Jun 2009 07:16

RNS Number : 4311T
Pantheon Resources PLC
05 June 2009
 

Press release

 June 2009

Drilling Update 

Pantheon Resources plc ("Pantheon" or the "Company"), the AIM-quoted oil and gas exploration company active in Louisiana and Texas, issues the following operational update.

Jumonville #2, Bullseye Prospect, Iberville Parish, Louisiana

The testing programme is focusing on three separate intervals in the Jumonville #2 well: 

the Miogyp (this zone is currently producing in Jumonville #1); 

the Cib Haz 6; and 

the Cib Haz 7.

The first phase of testing has commenced in the deepest of these intervals, the Cib Haz 7, where approximately 21 foot ('ft') of a 27 ft interval was perforated. Communications with the perforated interval appear to be limited which is inconsistent with other technical data derived from the well which includes side wall cores and a full suite of electric logs. Accordingly the forward operation will be to re-enter the well with a wireline tool. The aim is to determine whether the charge perforation array discharged correctly, or whether there is some blockage in the wellbore.

This apparent lack of communication is surprising and is inconsistent with the technical data derived from the well. These data included side wall cores and a full suite of electric logs. 

The results obtained from the wireline tool will be evaluated and a revised testing programme will be determinedOptions for the new testing programme might include re-perforating the interval, cleanout of any blockage or other actions determined by the new well bore analysis. 

The Cib Haz interval being tested (Cib Haz 7) appears to have reservoir properties similar to those in an analogue well that produced from the Cib Haz interval at similar depths and pressures. This is located approximately eight miles west of the Bullseye prospect in the Bayou Sorrel Field. The reservoir in the Bayou Sorrel Field appears to have similar seismic appearance to the Bullseye reservoir with possible multiple stacked sandstone packages. A major difference between the two wells is that the producing interval in the analogue well is much less sand-rich than either of the two potential Cib Haz reservoirs in Jumonville #2.

Dependent upon the outcome of the test results, the Jumonville #2 well will be put on immediate production from either one of the two Cib Haz intervals or else the known productive Miogyp sandstone. The latter is about 20 feet thick in the Jumonville #2 well. Surface facilities are being installed and connected to the already established sales line that currently handles the Jumonville #1 oil and gas production.

Vision Rice University #1Tyler County 

The Vision Rice University #1 well has experienced significant delays since encountering very high pressure gradients and natural gas flows. As previously announced, these delays have resulted in additional costs becoming payable by the Company. After setting a slotted liner in the horizontal segment of the wellbore, service company personnel failed to set a production packer, on two separate occasions. These failures required the well to be killed with heavy drilling mud on both occasions. On the third attempt, a packer and production tubing were successfully installed.

During subsequent clean-up operations the well bore became blocked with packer debris and de-hydrated drilling mud. This caused further delays. The operator has proposed to move a coiled tubing unit on location to perform the necessary clean-out operations as soon as suitable equipment becomes availableOnce the Company receives clarity on timing from the operator it will inform the market accordingly. Whilst these delays are unfortunate the Company does not believe the prospectivity of the well to be affected materially.

Jay Cheatham, CEO of Pantheon stated, "The blockages and delays that have occurred in the testing of both Jumonville #2 and Vision Rice University # 1 whilst frustrating, are not unusual when dealing with extremely high pressure reservoirs. I am confident that both operations will be successful in dealing with these issues."

In accordance with the AIM Rules, the information in this announcement has been reviewed and signed off by Jay Cheatham, who has over 30 years' relevant experience within the sector.

For further information on Pantheon Resources plc, see the website at www.pantheonresources.com

 

Enquiries:

Pantheon Resources plc

Jay Cheatham, CEO

+44 20 7484 5359

Oriel Securities Limited (Nominated Adviser)

Michael Shaw

+44 20 7710 7600

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLSSLSMISUSEFM
Date   Source Headline
14th Jan 20197:00 amRNSAcquisition of controlling interest in Vision
9th Jan 20197:00 amRNSUpdate on the Acquisition and Capital Raising
28th Dec 20181:45 pmRNSPosting of Circular and Notice of General Meeting
21st Dec 20182:09 pmRNSResult of Capital Raising
21st Dec 20187:02 amRNSPlacing, Subscription and Acquisition
21st Dec 20187:00 amRNSFinal Results for the Year Ended 30 June 2018
17th Dec 201810:52 amRNSProposed acquisition of controlling interest
4th Dec 20187:02 amRNSSecond Price Monitoring Extn
4th Dec 20187:01 amRNSPrice Monitoring Extension
3rd Dec 20184:40 pmRNSSecond Price Monitoring Extn
3rd Dec 20184:35 pmRNSPrice Monitoring Extension
28th Nov 20187:00 amRNSFirst production Tyler County
2nd Nov 20187:00 amRNSTyler County Pipeline Update
25th Oct 20187:00 amRNSChange of Adviser
22nd Oct 20187:00 amRNSDirectorate Change and Operational Update
6th Sep 20184:35 pmRNSPrice Monitoring Extension
24th Aug 20187:00 amRNSCorporate Update
9th Aug 201812:02 pmRNSPrice Monitoring Extension
7th Aug 20187:00 amRNSCorporate Update
20th Jul 20182:11 pmRNSHolding(s) in Company
16th Jul 20187:00 amRNSCorporate Update
2nd Jul 20184:40 pmRNSSecond Price Monitoring Extn
2nd Jul 20184:35 pmRNSPrice Monitoring Extension
14th Jun 20182:57 pmRNSDirector/PDMR Shareholding
14th Jun 20187:00 amRNSCorporate Update
5th Jun 20185:18 pmRNSCorporate Update
4th Jun 20187:00 amRNSOperational Update
14th May 201810:45 amRNSHolding(s) in Company
9th Apr 20188:36 amRNSRestoration - Pantheon Resources plc
9th Apr 20188:28 amRNSSuspension - Pantheon Resources Plc
9th Apr 20188:25 amRNSOperational Update
27th Mar 20187:00 amRNSInterim Results for the Six Months Ended 31/12/17
9th Mar 20187:00 amRNSOperational Update
23rd Feb 20187:00 amRNSOperational Update
9th Feb 20187:00 amRNSOperational Update
4th Jan 20183:25 pmRNSDirector/PDMR Shareholding
3rd Jan 20187:00 amRNSSpudding of VOBM#5 and Operational Update
21st Dec 20177:00 amRNSIncrease in working interest in the VOBM#5 well
15th Dec 201712:19 pmRNSResult of AGM
15th Dec 201710:00 amRNSAGM Statement
11th Dec 20177:07 amRNSOperational Update
6th Dec 20177:00 amRNSOperational Update
30th Nov 20177:00 amRNSOperational Update
22nd Nov 20177:00 amRNSFinal Results for the Year Ended 30 June 2017
15th Nov 20177:00 amRNSCommencement of First Gas Production
31st Oct 20177:00 amRNSOperational Update
11th Oct 20177:00 amRNSOperational Update
29th Sep 20177:00 amRNSOperational Update
25th Sep 20177:00 amRNSSettlement of Lease Dispute
14th Sep 20177:00 amRNSOperational Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.