Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPantheon Resources plc Regulatory News (PANR)

Share Price Information for Pantheon Resources plc (PANR)

Share Price is delayed by 15 minutes
Get Live Data
16.37    -1.35 (-7.62%)
Bid:
16.42
Ask:
16.50
Spread: 0.08 (0.487%)
Market Cap: £238.66m
PANR Live PriceLast checked at - London Stock Exchange

Intraday Pantheon Resources plc Share Chart

Drilling Update

5 Jun 2009 07:16

RNS Number : 4311T
Pantheon Resources PLC
05 June 2009
 

Press release

 June 2009

Drilling Update 

Pantheon Resources plc ("Pantheon" or the "Company"), the AIM-quoted oil and gas exploration company active in Louisiana and Texas, issues the following operational update.

Jumonville #2, Bullseye Prospect, Iberville Parish, Louisiana

The testing programme is focusing on three separate intervals in the Jumonville #2 well: 

the Miogyp (this zone is currently producing in Jumonville #1); 

the Cib Haz 6; and 

the Cib Haz 7.

The first phase of testing has commenced in the deepest of these intervals, the Cib Haz 7, where approximately 21 foot ('ft') of a 27 ft interval was perforated. Communications with the perforated interval appear to be limited which is inconsistent with other technical data derived from the well which includes side wall cores and a full suite of electric logs. Accordingly the forward operation will be to re-enter the well with a wireline tool. The aim is to determine whether the charge perforation array discharged correctly, or whether there is some blockage in the wellbore.

This apparent lack of communication is surprising and is inconsistent with the technical data derived from the well. These data included side wall cores and a full suite of electric logs. 

The results obtained from the wireline tool will be evaluated and a revised testing programme will be determinedOptions for the new testing programme might include re-perforating the interval, cleanout of any blockage or other actions determined by the new well bore analysis. 

The Cib Haz interval being tested (Cib Haz 7) appears to have reservoir properties similar to those in an analogue well that produced from the Cib Haz interval at similar depths and pressures. This is located approximately eight miles west of the Bullseye prospect in the Bayou Sorrel Field. The reservoir in the Bayou Sorrel Field appears to have similar seismic appearance to the Bullseye reservoir with possible multiple stacked sandstone packages. A major difference between the two wells is that the producing interval in the analogue well is much less sand-rich than either of the two potential Cib Haz reservoirs in Jumonville #2.

Dependent upon the outcome of the test results, the Jumonville #2 well will be put on immediate production from either one of the two Cib Haz intervals or else the known productive Miogyp sandstone. The latter is about 20 feet thick in the Jumonville #2 well. Surface facilities are being installed and connected to the already established sales line that currently handles the Jumonville #1 oil and gas production.

Vision Rice University #1Tyler County 

The Vision Rice University #1 well has experienced significant delays since encountering very high pressure gradients and natural gas flows. As previously announced, these delays have resulted in additional costs becoming payable by the Company. After setting a slotted liner in the horizontal segment of the wellbore, service company personnel failed to set a production packer, on two separate occasions. These failures required the well to be killed with heavy drilling mud on both occasions. On the third attempt, a packer and production tubing were successfully installed.

During subsequent clean-up operations the well bore became blocked with packer debris and de-hydrated drilling mud. This caused further delays. The operator has proposed to move a coiled tubing unit on location to perform the necessary clean-out operations as soon as suitable equipment becomes availableOnce the Company receives clarity on timing from the operator it will inform the market accordingly. Whilst these delays are unfortunate the Company does not believe the prospectivity of the well to be affected materially.

Jay Cheatham, CEO of Pantheon stated, "The blockages and delays that have occurred in the testing of both Jumonville #2 and Vision Rice University # 1 whilst frustrating, are not unusual when dealing with extremely high pressure reservoirs. I am confident that both operations will be successful in dealing with these issues."

In accordance with the AIM Rules, the information in this announcement has been reviewed and signed off by Jay Cheatham, who has over 30 years' relevant experience within the sector.

For further information on Pantheon Resources plc, see the website at www.pantheonresources.com

 

Enquiries:

Pantheon Resources plc

Jay Cheatham, CEO

+44 20 7484 5359

Oriel Securities Limited (Nominated Adviser)

Michael Shaw

+44 20 7710 7600

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLSSLSMISUSEFM
Date   Source Headline
15th Feb 20217:00 amRNSTalitha #A – Operations Update
12th Feb 202110:08 amRNSNotification of major holdings
10th Feb 20211:19 pmRNSNotification of major holdings
3rd Feb 20212:52 pmRNSConversion of Shares
28th Jan 20217:00 amRNSAnnual Grant of Share Options
27th Jan 20217:00 amRNSFinal Results for the Year Ended 30 June 2020
19th Jan 20217:01 amRNSAcquisition of remaining 10.8% WI in Talitha
14th Jan 20217:31 amRNSAcquisition of New Acreage
14th Jan 20217:24 amRNSDispute Update – East Texas
14th Jan 20217:18 amRNSSpudding of Talitha #A Well
30th Dec 20207:00 amRNSExtension of Reporting Deadline & Operating Update
30th Nov 20207:00 amRNSNotification of major hioldings
25th Nov 20207:00 amRNSContract for a Drilling Rig for Talitha #A well
20th Nov 20207:00 amRNSResult of Capital Raise
19th Nov 20205:08 pmRNSRetail Offer via PrimaryBid.com
19th Nov 20205:02 pmRNSProposed Placing and Subscription
17th Nov 20204:18 pmRNSNotification of major holdings
13th Nov 202010:42 amRNSFormal Approval of the Talitha Unit
3rd Nov 202012:23 pmRNSFormal Approval of the Alkaid Unit
22nd Oct 20207:00 amRNSChange of Advisor
13th Oct 20207:00 amRNSUpgraded management resource estimates – Kuparuk
25th Sep 20207:00 amRNSReceipt of Independent Resource Report – Talitha
7th Sep 20207:00 amRNSTalitha Production Unit & Operational Update
1st Sep 20208:35 amRNSAlkaid Production Unit & Operational Update
16th Jul 20204:40 pmRNSSecond Price Monitoring Extn
16th Jul 20204:35 pmRNSPrice Monitoring Extension
7th Jul 20207:00 amRNSIssuance of Share Options to Directors and staff
22nd Apr 20204:41 pmRNSSecond Price Monitoring Extn
22nd Apr 20204:35 pmRNSPrice Monitoring Extension
21st Apr 20207:00 amRNSImplementation of cost saving initiatives
2nd Apr 20204:36 pmRNSPrice Monitoring Extension
1st Apr 20204:41 pmRNSSecond Price Monitoring Extn
1st Apr 20204:36 pmRNSPrice Monitoring Extension
31st Mar 202012:08 pmRNSSecond Price Monitoring Extn
31st Mar 202012:03 pmRNSPrice Monitoring Extension
27th Mar 202012:07 pmRNSSecond Price Monitoring Extn
27th Mar 202012:02 pmRNSPrice Monitoring Extension
23rd Mar 20204:41 pmRNSSecond Price Monitoring Extn
23rd Mar 20204:38 pmRNSPrice Monitoring Extension
23rd Mar 20203:35 pmRNSUpgraded resource estimates & Company presentation
20th Mar 20204:30 pmRNSResult of AGM
20th Mar 202010:24 amRNSInterim Results for 6 months ended 31/12/2019
19th Mar 20209:19 amRNSUpdate on AGM & investor presentation
18th Mar 20204:43 pmRNSSecond Price Monitoring Extn
18th Mar 20204:38 pmRNSPrice Monitoring Extension
16th Mar 20204:41 pmRNSSecond Price Monitoring Extn
16th Mar 20204:36 pmRNSPrice Monitoring Extension
13th Mar 20202:56 pmRNSForthcoming AGM and Coronavirus precautions
9th Mar 20204:41 pmRNSSecond Price Monitoring Extn
9th Mar 20204:37 pmRNSPrice Monitoring Extension

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.