Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPantheon Resources plc Regulatory News (PANR)

Share Price Information for Pantheon Resources plc (PANR)

Share Price is delayed by 15 minutes
Get Live Data
15.85    -0.52 (-3.18%)
Bid:
15.91
Ask:
16.30
Spread: 0.39 (2.451%)
Market Cap: £231.08m
PANR Live PriceLast checked at - London Stock Exchange

Intraday Pantheon Resources plc Share Chart

Drilling Update

5 Jun 2009 07:16

RNS Number : 4311T
Pantheon Resources PLC
05 June 2009
 

Press release

 June 2009

Drilling Update 

Pantheon Resources plc ("Pantheon" or the "Company"), the AIM-quoted oil and gas exploration company active in Louisiana and Texas, issues the following operational update.

Jumonville #2, Bullseye Prospect, Iberville Parish, Louisiana

The testing programme is focusing on three separate intervals in the Jumonville #2 well: 

the Miogyp (this zone is currently producing in Jumonville #1); 

the Cib Haz 6; and 

the Cib Haz 7.

The first phase of testing has commenced in the deepest of these intervals, the Cib Haz 7, where approximately 21 foot ('ft') of a 27 ft interval was perforated. Communications with the perforated interval appear to be limited which is inconsistent with other technical data derived from the well which includes side wall cores and a full suite of electric logs. Accordingly the forward operation will be to re-enter the well with a wireline tool. The aim is to determine whether the charge perforation array discharged correctly, or whether there is some blockage in the wellbore.

This apparent lack of communication is surprising and is inconsistent with the technical data derived from the well. These data included side wall cores and a full suite of electric logs. 

The results obtained from the wireline tool will be evaluated and a revised testing programme will be determinedOptions for the new testing programme might include re-perforating the interval, cleanout of any blockage or other actions determined by the new well bore analysis. 

The Cib Haz interval being tested (Cib Haz 7) appears to have reservoir properties similar to those in an analogue well that produced from the Cib Haz interval at similar depths and pressures. This is located approximately eight miles west of the Bullseye prospect in the Bayou Sorrel Field. The reservoir in the Bayou Sorrel Field appears to have similar seismic appearance to the Bullseye reservoir with possible multiple stacked sandstone packages. A major difference between the two wells is that the producing interval in the analogue well is much less sand-rich than either of the two potential Cib Haz reservoirs in Jumonville #2.

Dependent upon the outcome of the test results, the Jumonville #2 well will be put on immediate production from either one of the two Cib Haz intervals or else the known productive Miogyp sandstone. The latter is about 20 feet thick in the Jumonville #2 well. Surface facilities are being installed and connected to the already established sales line that currently handles the Jumonville #1 oil and gas production.

Vision Rice University #1Tyler County 

The Vision Rice University #1 well has experienced significant delays since encountering very high pressure gradients and natural gas flows. As previously announced, these delays have resulted in additional costs becoming payable by the Company. After setting a slotted liner in the horizontal segment of the wellbore, service company personnel failed to set a production packer, on two separate occasions. These failures required the well to be killed with heavy drilling mud on both occasions. On the third attempt, a packer and production tubing were successfully installed.

During subsequent clean-up operations the well bore became blocked with packer debris and de-hydrated drilling mud. This caused further delays. The operator has proposed to move a coiled tubing unit on location to perform the necessary clean-out operations as soon as suitable equipment becomes availableOnce the Company receives clarity on timing from the operator it will inform the market accordingly. Whilst these delays are unfortunate the Company does not believe the prospectivity of the well to be affected materially.

Jay Cheatham, CEO of Pantheon stated, "The blockages and delays that have occurred in the testing of both Jumonville #2 and Vision Rice University # 1 whilst frustrating, are not unusual when dealing with extremely high pressure reservoirs. I am confident that both operations will be successful in dealing with these issues."

In accordance with the AIM Rules, the information in this announcement has been reviewed and signed off by Jay Cheatham, who has over 30 years' relevant experience within the sector.

For further information on Pantheon Resources plc, see the website at www.pantheonresources.com

 

Enquiries:

Pantheon Resources plc

Jay Cheatham, CEO

+44 20 7484 5359

Oriel Securities Limited (Nominated Adviser)

Michael Shaw

+44 20 7710 7600

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLSSLSMISUSEFM
Date   Source Headline
8th Oct 20157:00 amRNSCommencement of testing operations
9th Sep 20157:00 amRNSDrilling Update
28th Jul 20157:00 amRNSSpudding of VOBM#1 well
16th Jul 20157:00 amRNSDrill Site and Roadworks Complete
3rd Jun 20151:32 pmRNSHolding(s) in Company
1st Jun 20157:00 amRNSUpdated Corporate Presentation
7th May 20157:00 amRNSDrilling Rig Contracted
30th Mar 20157:00 amRNSHalf Yearly Report
25th Mar 20157:07 amRNSOperational Update
2nd Mar 20158:58 amRNSChange of Nominated Adviser
29th Dec 201412:17 pmRNSResult of AGM
15th Dec 20143:45 pmRNSHolding(s) in Company
15th Dec 20147:00 amRNSDirector/PDMR Shareholding
4th Dec 20143:00 pmRNSNotice of AGM
2nd Dec 20147:30 amRNSFinal Results
19th Nov 20147:00 amRNSCompany Update
3rd Nov 20148:58 amRNSHolding(s) in Company
27th Oct 20145:55 pmRNSHolding(s) in Company
23rd Oct 20144:06 pmRNSHolding(s) in Company
22nd Oct 20145:10 pmRNSHolding(s) in Company
21st Oct 20145:43 pmRNSHolding(s) in Company
21st Oct 20143:15 pmRNSTotal Voting Rights
16th Oct 201411:04 amRNSResult of General Meeting
10th Oct 201412:00 pmRNSSuccessful Acquisition of Key Leases
7th Oct 201412:45 pmRNSHolding(s) in Company
7th Oct 201412:30 pmRNSHolding(s) in Company
7th Oct 201411:15 amRNSHolding(s) in Company
6th Oct 20145:41 pmRNSHolding(s) in Company
2nd Oct 20143:25 pmRNSTotal Voting Rights
1st Oct 20141:21 pmRNSPosting of Circular
30th Sep 20149:45 amRNSIssue of Share Options
30th Sep 20147:03 amRNSPlacing of Shares & Revised Joint Venture
14th Apr 20147:00 amRNSDirector/PDMR Shareholding
31st Mar 20147:00 amRNSHalf Yearly Report
13th Dec 201311:53 amRNSResult of AGM
13th Dec 201310:00 amRNSAGM Statement
19th Nov 20136:11 pmRNSHolding(s) in Company
15th Nov 20137:00 amRNSFinal Results
2nd Sep 20133:07 pmRNSHolding(s) in Company
22nd Jul 20132:22 pmRNSTyler County Update
20th May 20132:53 pmRNSHolding(s) in Company
8th May 201312:41 pmRNSHolding(s) in Company
2nd May 201312:18 pmRNSHolding(s) in Company
27th Mar 20137:00 amRNSHalf Yearly Report
26th Mar 20132:30 pmRNSHolding(s) in Company
20th Feb 20132:26 pmRNSHolding(s) in Company
17th Dec 201211:22 amRNSHolding(s) in Company
14th Dec 20122:18 pmRNSResult of AGM
14th Dec 201210:00 amRNSAGM Statement
20th Nov 201212:09 pmRNSNotice of AGM and Presentation by JV Operator

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.