Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPantheon Resources plc Regulatory News (PANR)

Share Price Information for Pantheon Resources plc (PANR)

Share Price is delayed by 15 minutes
Get Live Data
17.72    4.20 (31.07%)
Bid:
17.57
Ask:
17.80
Spread: 0.23 (1.309%)
Market Cap: £258.34m
PANR Live PriceLast checked at - London Stock Exchange

Intraday Pantheon Resources plc Share Chart

Drilling Update

29 Sep 2008 07:00

RNS Number : 5065E
Pantheon Resources PLC
29 September 2008
 

Press release

 29 September 2008

Pantheon Resources plc - Bullseye Confirmed as a Significant Discovery

Pantheon Resources plc ("Pantheon") or ("the Company"), the AIM-quoted oil and gas exploration company active in the Gulf of Mexico, issues the following drilling update for the Jumonville #1 well.

Initial testing of the upper portion of the Jumonville #1 Miogyp reservoir commenced on Thursday 25th September 2008. Of the 47 feet of Miogyp sand, the upper eight feet were perforated. The well initially flowed 520 barrels per day of 40.8 API gravity light oil, with no water, and 293,000 cubic feet per day of natural gas through a restricted 7/64 inch choke.

The current surface flowing pressure of 7,323 pounds per square inch (psi) is effectively unchanged from the original measurements. This indicates that the Miogyp reservoir is capable of much greater deliverability.

The initial perforations and flow rates have been restricted to avoid damage to the reservoir during this testing period. It is probable that the flow rate will be increased once permanent production and distribution facilities are completed; these are currently expected in about two weeks. An increased flow rate would be necessary to determine the full deliverability of the reservoir. 

Commercial production has already begun, as temporary production facilities are in place. Oil is being sold at a US$2.50 per barrel premium to the WTI benchmark. Natural gas will be flared until the gas sales flow line is completed over the coming weeks.

Separately, flow testing of the Camerina interval was not possible in the current borehole. The Camerina sands are located approximately two hundred feet above the Miogyp section. 

Jumonville # 2 Well 

With the Jumonville #1 well proving a success, it has been agreed to proceed with a further exploration/appraisal/development well; Jumonville #2. There is further significant potential upside with the Jumonville # 2 well. This well is designed to test the deeper Cib Haz interval. It will also delineate the Miogyp reservoir at a distance some 1,500 feet to the west of Jumonville #1 with the aim to increase reserves. It is also planned to test the Camerina formation in the offset drilling at Jumonville #2.

Planning and permitting has already begun to drill Jumonville #2 from the existing location. A drilling rig has been located and it is expected to spud Jumonville # 2 within six to eight weeks. The drilling plan allows for formation fluid testing prior to setting intermediate casing across the Miogyp/Camerina interval. The well is then planned to be continued to the deeper objective at 14,400 feet.

As production facilities will be completed, this would permit a successful well to be put on-line immediately after completion. Further delineation drilling is also being planned. 

Discoveries in the two objectives above the Cib Haz (Miogyp and Camerina) provide confidence for this deeper target. The deeper Cib Haz interval is contained in the same trapping mechanism as the proven Miogyp reservoir. It is thus considered to have a high probability of success. Seismic data indicate substantially thicker reservoir sand over a larger area in the deeper reservoir. 

There are now two wells on the Bullseye prospect, Jumonville #1 and an old wellAcosta #1. The latter was never tested but 50 feet of Miogyp sand were encountered. These two wells combined with the planned Jumonville #2 well and the existing 3D seismic data provide confidence in the structural definition of the field. This aids reserves evaluation and future planning for development drilling. In addition, in the event of a successful test of the deeper reservoir, the combined reserves of the Camerina, Miogyp and Cib Haz would make Bullseye one of the largest onshore discoveries in South Louisiana in recent years.

Jay Cheatham, CEO of Pantheon, said, "This is a very significant discovery for the company and we are obviously pleased with the testing results from a mechanically restrictive well bore. Another well is needed to ascertain completely the full reservoir extent. The bottom water drive found in the initial test will allow the wells to be flowed at a higher rate without compromising ultimate reservoir recovery"

Pantheon is participating with an 11.25% working interest in the Bullseye prospect. Back in rights have now been exercised reducing Pantheon's working interest from 15%. 

In accordance with the AIM Rules, the information in this announcement has been reviewed and approved by Jay Cheatham, who has over 30 years' relevant experience within the sector.

For further information on Pantheon Resources plc, see the website at www.pantheonresources.com

- end -

Further information:

Pantheon Resources PLC

Jay Cheatham CEO

+44 20 7484 5359

Oriel Securities Limited

Michael Shaw

+44 20 7710 7600

.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLSEEEFASASEEU
Date   Source Headline
15th Nov 20078:43 amRNSProduction Update - Oct 2007
13th Nov 20079:29 amRNSHolding(s) in Company
2nd Nov 20074:23 pmRNSHolding(s) in Company
2nd Nov 20072:50 pmRNSOption Grant
25th Oct 200712:12 pmRNSHolding(s) in Company
25th Oct 200712:09 pmRNSHolding(s) in Company
25th Oct 200712:08 pmRNSHolding(s) in Company
19th Oct 20072:42 pmRNSHolding(s) in Company
16th Oct 20077:01 amRNSSpudding of Nottoway Prospect
16th Oct 20077:00 amRNSProduction Update
4th Oct 20077:01 amRNSProduction Update - Sept 2007
19th Sep 20077:01 amRNSFirst Production-Dunn Deep #2
17th Sep 20072:38 pmRNSHolding(s) in Company
17th Sep 20072:26 pmRNSProduction Update-August 2007
14th Sep 20075:20 pmRNSHolding(s) in Company
11th Sep 200710:43 amRNSFirst Production from Wilson
7th Sep 20077:01 amRNSDunn Deep Update
3rd Sep 20073:00 pmRNSHolding(s) in Company
3rd Sep 20077:01 amRNSAppointment of Director
15th Aug 20077:00 amRNSDrilling Programme Update
7th Aug 20077:01 amRNSAddition to Portfolio
6th Aug 20077:59 amRNSProduction Update - July 2007
30th Jul 20074:24 pmRNSHolding(s) in Company
25th Jul 20074:08 pmRNSHolding(s) in Company
17th Jul 20077:00 amRNSAddition to portfolio
10th Jul 20074:21 pmRNSHolding(s) in Company
5th Jul 200711:45 amRNSHolding(s) in Company
5th Jul 20077:46 amRNSProduction Update - June 2007
25th Jun 20072:58 pmRNSProduction Update-June 2007
25th Jun 20077:36 amRNSProduction Update - June 2007
19th Jun 200711:45 amRNSHolding(s) in Company
18th Jun 20078:32 amRNSWilson Update
8th Jun 20073:13 pmRNSProduction Update - May 2007
6th Jun 20072:57 pmRNSHolding(s) in Company
4th Jun 20078:12 amRNSWilson Test Result
29th May 20079:40 amRNSWilson Drilling Update
22nd May 20078:33 amRNSWilson Drilling Update
21st May 20077:30 amRNSAddition to portfolio
16th May 20077:49 amRNSDrilling Update on Wilson
14th May 20074:03 pmRNSHolding(s) in Company
10th May 20078:47 amRNSProduction Update- April 2007
3rd May 200710:50 amRNSHolding(s) in Company
2nd May 20078:19 amRNSHolding(s) in Company
27th Apr 20072:03 pmRNSHolding(s) in Company
20th Apr 20077:01 amRNSWilson Drilling Update
11th Apr 20077:01 amRNSProduction Update-March 2007
10th Apr 20077:43 amRNSNatural Gas Encountered
5th Apr 20077:01 amRNSDrilling Report
30th Mar 20076:06 pmRNSInterim Results
29th Mar 200710:55 amRNSProject Wharton Spudded

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.