Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPantheon Resources plc Regulatory News (PANR)

Share Price Information for Pantheon Resources plc (PANR)

Share Price is delayed by 15 minutes
Get Live Data
17.00    3.48 (25.74%)
Bid:
16.78
Ask:
17.07
Spread: 0.29 (1.728%)
Market Cap: £247.84m
PANR Live PriceLast checked at - London Stock Exchange

Intraday Pantheon Resources plc Share Chart

Drilling Update

29 Sep 2008 07:00

RNS Number : 5065E
Pantheon Resources PLC
29 September 2008
Β 

Press release

Β 29Β SeptemberΒ 2008

PantheonΒ ResourcesΒ plcΒ -Β Bullseye Confirmed as a SignificantΒ Discovery

Pantheon ResourcesΒ plcΒ ("Pantheon")Β or ("the Company"), the AIM-quotedΒ oil and gas exploration company active in the Gulf of Mexico,Β issues the following drilling updateΒ for the Jumonville #1 well.

Initial testing of the upper portion of the Jumonville #1 Miogyp reservoir commenced on Thursday 25thΒ September 2008. Of the 47 feet of Miogyp sand, the upper eight feet wereΒ perforated.Β The well initially flowed 520 barrels per day of 40.8 API gravity light oil, with no water,Β and 293,000 cubic feet per day ofΒ naturalΒ gas through a restricted 7/64 inch choke.

The current surface flowing pressure of 7,323 pounds per square inch (psi) is effectively unchanged from the original measurements. This indicates that the Miogyp reservoir is capable of much greater deliverability.

The initial perforations and flow rates have been restricted to avoid damage to the reservoir during this testing period. It is probable that the flow rate will be increased once permanent production and distribution facilitiesΒ are completed; these are currently expected in about two weeks. An increased flow rate would be necessary to determine the full deliverability of the reservoir.Β 

Commercial production has already begun, as temporary production facilities are in place. Oil is being sold at a US$2.50 per barrel premium to the WTI benchmark. Natural gas will be flared until the gas sales flow line is completed over the coming weeks.

Separately, flow testing ofΒ theΒ Camerina intervalΒ was not possible in the current borehole. The Camerina sands are located approximately two hundred feet above the Miogyp section.Β 

Jumonville # 2 WellΒ 

With the Jumonville #1 well proving a success, it has been agreed to proceed with a further exploration/appraisal/developmentΒ well;Β Jumonville #2.Β There is further significantΒ potentialΒ upside with the Jumonville # 2 well. This well is designed to test the deeper Cib Haz interval. It will also delineate the Miogyp reservoirΒ at a distanceΒ some 1,500 feet to the west of Jumonville #1 with the aim to increase reserves. It is also planned to test the Camerina formation in the offset drilling at Jumonville #2.

Planning and permitting has already begunΒ to drillΒ Jumonville #2Β from the existing location.Β A drilling rig has been located and it is expected to spud Jumonville # 2 within six to eight weeks. The drilling plan allows for formation fluid testing prior to setting intermediate casing across the Miogyp/Camerina interval. The wellΒ isΒ thenΒ planned toΒ be continued to the deeper objective at 14,400 feet.

As production facilities will be completed,Β this would permitΒ a successful wellΒ to beΒ put on-line immediately after completion.Β Further delineation drilling is also being planned.Β 

Discoveries in the two objectives above the Cib Haz (Miogyp and Camerina) provide confidence for thisΒ deeper target. The deeper Cib Haz interval is contained in theΒ same trapping mechanismΒ as the proven Miogyp reservoir. It is thus considered to have a high probability of success. Seismic data indicateΒ substantiallyΒ thicker reservoir sand over a larger area in the deeper reservoir.Β 

There are now two wells on the Bullseye prospect, Jumonville #1 and an old well,Β Acosta #1. The latter was never tested but 50 feet of Miogyp sand were encountered. These twoΒ wellsΒ combined with theΒ plannedΒ Jumonville #2 well and the existing 3D seismic data provide confidence in the structural definition of the field. This aids reservesΒ evaluationΒ and future planning for development drilling.Β In addition, in the event of a successful test of the deeper reservoir, the combined reserves of the Camerina, Miogyp and Cib HazΒ would make Bullseye one of the largest onshore discoveries inΒ South LouisianaΒ in recent years.

Jay Cheatham, CEO of Pantheon, said, "This is a very significant discovery for the company and we are obviously pleased with the testing results from a mechanically restrictive well bore. Another well is needed to ascertain completely the full reservoir extent. The bottom water drive found in the initial test will allow the wells to be flowed at a higher rate without compromising ultimate reservoir recovery"

Pantheon is participating with an 11.25%Β working interest in the Bullseye prospect. BackΒ inΒ rights haveΒ nowΒ been exercisedΒ reducing Pantheon's working interest from 15%.Β 

In accordance with the AIM Rules, the information in thisΒ announcementΒ has been reviewed andΒ approvedΒ by Jay Cheatham, who has over 30 years'Β relevant experience within the sector.

For further information on Pantheon Resources plc, see the website at www.pantheonresources.com

- end -

Further information:

Pantheon Resources PLC

Jay Cheatham CEO

+44Β 20 7484 5359

Oriel Securities Limited

Michael Shaw

+44 20 7710 7600

.

This information is provided by RNS
The company news service from the London Stock Exchange
Β 
END
Β 
Β 
DRLSEEEFASASEEU
Date   Source Headline
14th Jan 20197:00 amRNSAcquisition of controlling interest in Vision
9th Jan 20197:00 amRNSUpdate on the Acquisition and Capital Raising
28th Dec 20181:45 pmRNSPosting of Circular and Notice of General Meeting
21st Dec 20182:09 pmRNSResult of Capital Raising
21st Dec 20187:02 amRNSPlacing, Subscription and Acquisition
21st Dec 20187:00 amRNSFinal Results for the Year Ended 30 June 2018
17th Dec 201810:52 amRNSProposed acquisition of controlling interest
4th Dec 20187:02 amRNSSecond Price Monitoring Extn
4th Dec 20187:01 amRNSPrice Monitoring Extension
3rd Dec 20184:40 pmRNSSecond Price Monitoring Extn
3rd Dec 20184:35 pmRNSPrice Monitoring Extension
28th Nov 20187:00 amRNSFirst production Tyler County
2nd Nov 20187:00 amRNSTyler County Pipeline Update
25th Oct 20187:00 amRNSChange of Adviser
22nd Oct 20187:00 amRNSDirectorate Change and Operational Update
6th Sep 20184:35 pmRNSPrice Monitoring Extension
24th Aug 20187:00 amRNSCorporate Update
9th Aug 201812:02 pmRNSPrice Monitoring Extension
7th Aug 20187:00 amRNSCorporate Update
20th Jul 20182:11 pmRNSHolding(s) in Company
16th Jul 20187:00 amRNSCorporate Update
2nd Jul 20184:40 pmRNSSecond Price Monitoring Extn
2nd Jul 20184:35 pmRNSPrice Monitoring Extension
14th Jun 20182:57 pmRNSDirector/PDMR Shareholding
14th Jun 20187:00 amRNSCorporate Update
5th Jun 20185:18 pmRNSCorporate Update
4th Jun 20187:00 amRNSOperational Update
14th May 201810:45 amRNSHolding(s) in Company
9th Apr 20188:36 amRNSRestoration - Pantheon Resources plc
9th Apr 20188:28 amRNSSuspension - Pantheon Resources Plc
9th Apr 20188:25 amRNSOperational Update
27th Mar 20187:00 amRNSInterim Results for the Six Months Ended 31/12/17
9th Mar 20187:00 amRNSOperational Update
23rd Feb 20187:00 amRNSOperational Update
9th Feb 20187:00 amRNSOperational Update
4th Jan 20183:25 pmRNSDirector/PDMR Shareholding
3rd Jan 20187:00 amRNSSpudding of VOBM#5 and Operational Update
21st Dec 20177:00 amRNSIncrease in working interest in the VOBM#5 well
15th Dec 201712:19 pmRNSResult of AGM
15th Dec 201710:00 amRNSAGM Statement
11th Dec 20177:07 amRNSOperational Update
6th Dec 20177:00 amRNSOperational Update
30th Nov 20177:00 amRNSOperational Update
22nd Nov 20177:00 amRNSFinal Results for the Year Ended 30 June 2017
15th Nov 20177:00 amRNSCommencement of First Gas Production
31st Oct 20177:00 amRNSOperational Update
11th Oct 20177:00 amRNSOperational Update
29th Sep 20177:00 amRNSOperational Update
25th Sep 20177:00 amRNSSettlement of Lease Dispute
14th Sep 20177:00 amRNSOperational Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.