Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPantheon Resources plc Regulatory News (PANR)

Share Price Information for Pantheon Resources plc (PANR)

Share Price is delayed by 15 minutes
Get Live Data
16.31    2.79 (20.64%)
Bid:
16.33
Ask:
16.59
Spread: 0.26 (1.592%)
Market Cap: £237.78m
PANR Live PriceLast checked at - London Stock Exchange

Intraday Pantheon Resources plc Share Chart

Drilling Update

29 Sep 2008 07:00

RNS Number : 5065E
Pantheon Resources PLC
29 September 2008
 

Press release

 29 September 2008

Pantheon Resources plc - Bullseye Confirmed as a Significant Discovery

Pantheon Resources plc ("Pantheon") or ("the Company"), the AIM-quoted oil and gas exploration company active in the Gulf of Mexico, issues the following drilling update for the Jumonville #1 well.

Initial testing of the upper portion of the Jumonville #1 Miogyp reservoir commenced on Thursday 25th September 2008. Of the 47 feet of Miogyp sand, the upper eight feet were perforated. The well initially flowed 520 barrels per day of 40.8 API gravity light oil, with no water, and 293,000 cubic feet per day of natural gas through a restricted 7/64 inch choke.

The current surface flowing pressure of 7,323 pounds per square inch (psi) is effectively unchanged from the original measurements. This indicates that the Miogyp reservoir is capable of much greater deliverability.

The initial perforations and flow rates have been restricted to avoid damage to the reservoir during this testing period. It is probable that the flow rate will be increased once permanent production and distribution facilities are completed; these are currently expected in about two weeks. An increased flow rate would be necessary to determine the full deliverability of the reservoir. 

Commercial production has already begun, as temporary production facilities are in place. Oil is being sold at a US$2.50 per barrel premium to the WTI benchmark. Natural gas will be flared until the gas sales flow line is completed over the coming weeks.

Separately, flow testing of the Camerina interval was not possible in the current borehole. The Camerina sands are located approximately two hundred feet above the Miogyp section. 

Jumonville # 2 Well 

With the Jumonville #1 well proving a success, it has been agreed to proceed with a further exploration/appraisal/development well; Jumonville #2. There is further significant potential upside with the Jumonville # 2 well. This well is designed to test the deeper Cib Haz interval. It will also delineate the Miogyp reservoir at a distance some 1,500 feet to the west of Jumonville #1 with the aim to increase reserves. It is also planned to test the Camerina formation in the offset drilling at Jumonville #2.

Planning and permitting has already begun to drill Jumonville #2 from the existing location. A drilling rig has been located and it is expected to spud Jumonville # 2 within six to eight weeks. The drilling plan allows for formation fluid testing prior to setting intermediate casing across the Miogyp/Camerina interval. The well is then planned to be continued to the deeper objective at 14,400 feet.

As production facilities will be completed, this would permit a successful well to be put on-line immediately after completion. Further delineation drilling is also being planned. 

Discoveries in the two objectives above the Cib Haz (Miogyp and Camerina) provide confidence for this deeper target. The deeper Cib Haz interval is contained in the same trapping mechanism as the proven Miogyp reservoir. It is thus considered to have a high probability of success. Seismic data indicate substantially thicker reservoir sand over a larger area in the deeper reservoir. 

There are now two wells on the Bullseye prospect, Jumonville #1 and an old wellAcosta #1. The latter was never tested but 50 feet of Miogyp sand were encountered. These two wells combined with the planned Jumonville #2 well and the existing 3D seismic data provide confidence in the structural definition of the field. This aids reserves evaluation and future planning for development drilling. In addition, in the event of a successful test of the deeper reservoir, the combined reserves of the Camerina, Miogyp and Cib Haz would make Bullseye one of the largest onshore discoveries in South Louisiana in recent years.

Jay Cheatham, CEO of Pantheon, said, "This is a very significant discovery for the company and we are obviously pleased with the testing results from a mechanically restrictive well bore. Another well is needed to ascertain completely the full reservoir extent. The bottom water drive found in the initial test will allow the wells to be flowed at a higher rate without compromising ultimate reservoir recovery"

Pantheon is participating with an 11.25% working interest in the Bullseye prospect. Back in rights have now been exercised reducing Pantheon's working interest from 15%. 

In accordance with the AIM Rules, the information in this announcement has been reviewed and approved by Jay Cheatham, who has over 30 years' relevant experience within the sector.

For further information on Pantheon Resources plc, see the website at www.pantheonresources.com

- end -

Further information:

Pantheon Resources PLC

Jay Cheatham CEO

+44 20 7484 5359

Oriel Securities Limited

Michael Shaw

+44 20 7710 7600

.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLSEEEFASASEEU
Date   Source Headline
21st Jul 20098:05 amRNSBullseye Project Update
30th Jun 20097:00 amRNSCommercial Production at Jumonville #2
25th Jun 20097:55 amRNSCorporate Update
15th Jun 20098:01 amRNSDrilling Update - Bullseye Prospect
5th Jun 20097:16 amRNSDrilling Update
29th Apr 20094:29 pmRNSCorporate Update
22nd Apr 20098:20 amRNSDrilling Update
14th Apr 20097:56 amRNSDrilling Update
7th Apr 20098:00 amRNSDrilling Update
6th Apr 20098:43 amRNSDrilling Update Replacement
6th Apr 20098:15 amRNSDrilling Update
2nd Apr 20093:31 pmRNSHolding(s) in Company
1st Apr 20099:48 amRNSHolding(s) in Company
31st Mar 20099:10 amRNSOperational Update
30th Mar 200911:52 amRNSHalf Yearly Report
18th Mar 20099:34 amRNSHolding(s) in Company
9th Mar 200912:40 pmRNSHolding(s) in Company
27th Feb 200910:43 amRNSHolding(s) in Company
24th Feb 200911:59 amRNSCompletion of Vision Rice University #1 Well
22nd Jan 20097:41 amRNSOperational Update
6th Jan 20098:00 amRNSOperational Update
23rd Dec 20088:16 amRNSBullseye Update
18th Dec 20084:49 pmRNSHolding(s) in Company
16th Dec 20085:27 pmRNSDirector/PDMR Shareholding
15th Dec 20083:56 pmRNSResult of AGM
15th Dec 20087:56 amRNSAGM Statement
9th Dec 200810:29 amRNSOil encountered at Acosta #1 Well
21st Nov 20089:26 amRNSNotice of AGM
19th Nov 20087:00 amRNSFinal Results
13th Nov 20087:00 amRNSDrilling Update
30th Oct 20087:50 amRNSDrilling Update
20th Oct 20087:00 amRNSDrilling Report
8th Oct 20088:10 amRNSDrilling Update
3rd Oct 200812:30 pmRNSAppointment of Executive Director
29th Sep 20087:00 amRNSDrilling Update
25th Sep 20087:54 amRNSDrilling Update
16th Sep 200812:24 pmRNSResult of EGM
12th Sep 20089:32 amRNSHolding(s) in Company
9th Sep 20088:09 amRNSOperations Update
2nd Sep 200812:44 pmRNSHolding(s) in Company
1st Sep 20088:39 amRNSHolding(s) in Company
1st Sep 20087:35 amRNSDrilling Update
28th Aug 20089:12 amRNSDrilling update
26th Aug 20086:18 pmRNSHolding(s) in Company
26th Aug 200811:20 amRNSEGM Notice
26th Aug 20087:00 amRNSDrilling Update
18th Aug 20087:00 amRNSDrilling Update
14th Aug 200810:16 amRNSTotal Voting Rights
14th Aug 20087:47 amRNSDrilling Update
6th Aug 20085:42 pmRNSDirector/PDMR Shareholding

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.