Stephan Bernstein, CEO of GreenRoc, details the PFS results for the new graphite processing plant. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPantheon Res Regulatory News (PANR)

Share Price Information for Pantheon Res (PANR)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 31.80
Bid: 31.65
Ask: 32.00
Change: 0.45 (1.44%)
Spread: 0.35 (1.106%)
Open: 32.80
High: 32.80
Low: 30.90
Prev. Close: 31.35
PANR Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Drilling Update

29 Sep 2008 07:00

RNS Number : 5065E
Pantheon Resources PLC
29 September 2008
 

Press release

 29 September 2008

Pantheon Resources plc - Bullseye Confirmed as a Significant Discovery

Pantheon Resources plc ("Pantheon") or ("the Company"), the AIM-quoted oil and gas exploration company active in the Gulf of Mexico, issues the following drilling update for the Jumonville #1 well.

Initial testing of the upper portion of the Jumonville #1 Miogyp reservoir commenced on Thursday 25th September 2008. Of the 47 feet of Miogyp sand, the upper eight feet were perforated. The well initially flowed 520 barrels per day of 40.8 API gravity light oil, with no water, and 293,000 cubic feet per day of natural gas through a restricted 7/64 inch choke.

The current surface flowing pressure of 7,323 pounds per square inch (psi) is effectively unchanged from the original measurements. This indicates that the Miogyp reservoir is capable of much greater deliverability.

The initial perforations and flow rates have been restricted to avoid damage to the reservoir during this testing period. It is probable that the flow rate will be increased once permanent production and distribution facilities are completed; these are currently expected in about two weeks. An increased flow rate would be necessary to determine the full deliverability of the reservoir. 

Commercial production has already begun, as temporary production facilities are in place. Oil is being sold at a US$2.50 per barrel premium to the WTI benchmark. Natural gas will be flared until the gas sales flow line is completed over the coming weeks.

Separately, flow testing of the Camerina interval was not possible in the current borehole. The Camerina sands are located approximately two hundred feet above the Miogyp section. 

Jumonville # 2 Well 

With the Jumonville #1 well proving a success, it has been agreed to proceed with a further exploration/appraisal/development well; Jumonville #2. There is further significant potential upside with the Jumonville # 2 well. This well is designed to test the deeper Cib Haz interval. It will also delineate the Miogyp reservoir at a distance some 1,500 feet to the west of Jumonville #1 with the aim to increase reserves. It is also planned to test the Camerina formation in the offset drilling at Jumonville #2.

Planning and permitting has already begun to drill Jumonville #2 from the existing location. A drilling rig has been located and it is expected to spud Jumonville # 2 within six to eight weeks. The drilling plan allows for formation fluid testing prior to setting intermediate casing across the Miogyp/Camerina interval. The well is then planned to be continued to the deeper objective at 14,400 feet.

As production facilities will be completed, this would permit a successful well to be put on-line immediately after completion. Further delineation drilling is also being planned. 

Discoveries in the two objectives above the Cib Haz (Miogyp and Camerina) provide confidence for this deeper target. The deeper Cib Haz interval is contained in the same trapping mechanism as the proven Miogyp reservoir. It is thus considered to have a high probability of success. Seismic data indicate substantially thicker reservoir sand over a larger area in the deeper reservoir. 

There are now two wells on the Bullseye prospect, Jumonville #1 and an old wellAcosta #1. The latter was never tested but 50 feet of Miogyp sand were encountered. These two wells combined with the planned Jumonville #2 well and the existing 3D seismic data provide confidence in the structural definition of the field. This aids reserves evaluation and future planning for development drilling. In addition, in the event of a successful test of the deeper reservoir, the combined reserves of the Camerina, Miogyp and Cib Haz would make Bullseye one of the largest onshore discoveries in South Louisiana in recent years.

Jay Cheatham, CEO of Pantheon, said, "This is a very significant discovery for the company and we are obviously pleased with the testing results from a mechanically restrictive well bore. Another well is needed to ascertain completely the full reservoir extent. The bottom water drive found in the initial test will allow the wells to be flowed at a higher rate without compromising ultimate reservoir recovery"

Pantheon is participating with an 11.25% working interest in the Bullseye prospect. Back in rights have now been exercised reducing Pantheon's working interest from 15%. 

In accordance with the AIM Rules, the information in this announcement has been reviewed and approved by Jay Cheatham, who has over 30 years' relevant experience within the sector.

For further information on Pantheon Resources plc, see the website at www.pantheonresources.com

- end -

Further information:

Pantheon Resources PLC

Jay Cheatham CEO

+44 20 7484 5359

Oriel Securities Limited

Michael Shaw

+44 20 7710 7600

.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLSEEEFASASEEU
Date   Source Headline
1st May 20247:00 amRNSIndependent Expert Report by LKA on Alkaid Horizon
24th Apr 20247:00 amRNSTR-1: Notification of major holdings
10th Apr 20244:53 pmRNSWebinar and update
9th Apr 20247:00 amRNSKodiak resource upgraded to 1.2 billion barrels
2nd Apr 20244:30 pmRNSDirector/PDMR Notification
28th Mar 20247:05 amRNSProgress on Funding and Development Planning
21st Mar 202411:51 amRNSTR-1: Notification of major holdings
18th Mar 20247:00 amRNSUnaudited Interim Results
14th Mar 20247:00 amRNSQuarterly Repayment of Unsecured Convertible Bonds
5th Mar 20245:05 pmRNSResponse to Share Price Volatility
2nd Feb 20247:00 amRNSTR-1: Notification of major holdings
1st Feb 20247:00 amRNSDirector/PDMR notification
24th Jan 20243:15 pmRNSResult of AGM & Investor Presentation Details
23rd Jan 20247:00 amRNSAnnual General Meeting
2nd Jan 20247:00 amRNSTR-1: Notification of major holdings
19th Dec 20237:00 amRNSFinal Results for the Year Ended 30 June 2023
14th Dec 20237:04 amRNSSuccessful Acquisition of Leases
12th Dec 20237:00 amRNSAppointment of Independent Non-Executive Director
21st Nov 20234:36 pmRNSStrategy Update
15th Nov 20231:54 pmRNSInvestor Presentation via Investor Meet Company
14th Nov 202311:56 amRNSBond Payment, Placement & Corporate Update
19th Oct 20237:00 amRNSValidation of frac design and fluid sampling
18th Oct 20237:00 amRNSPantheon Presenting at OTC Oil and Gas Conference
4th Oct 20237:00 amRNSReplacement TR-1: Notification of major holdings
3rd Oct 20234:02 pmRNSTR-1: Notification of major holdings
27th Sep 20237:00 amRNSCommencement of Operations - Re-entry of Alkaid-2
14th Sep 20233:34 pmRNSWebinar and update
8th Sep 20238:20 amRNSInvestor Presentation Webinar
7th Sep 20237:00 amRNSPrivate Placement
30th Aug 20237:00 amRNSDirector/PDMR Notification
29th Aug 20237:00 amRNSExpert Report Confirms Estimate for Kodiak Field
28th Jul 20237:57 amRNSReplacement Operational Update
28th Jul 20237:00 amRNSOperational Update
14th Jul 20239:30 amRNSInvestor Presentation via Investor Meet Company
10th Jul 20237:00 amRNSInvestor Presentation via Investor Meet Company
3rd Jul 20238:53 amRNSAppointment of Independent Non-Executive Director
28th Jun 20234:58 pmRNSWebinar and Strategy Update
26th Jun 202312:54 pmRNSUpcoming Webinar - Registration Details
15th Jun 20233:50 pmRNSIssue of Equity and Total Voting Rights
8th Jun 20237:00 amRNSAppointment of Executive Chairman
1st Jun 20237:00 amRNSLease Award
23rd May 20234:32 pmRNSUpdate on Fundraise
18th May 20235:40 pmRNSBlock Listing Six Monthly return
17th May 20237:00 amRNSResult of Capital Raise
16th May 20235:07 pmRNSRetail Offer via PrimaryBid
16th May 20234:59 pmRNSProposed Placing and Subscription
21st Apr 20237:00 amRNSOperational and corporate update
31st Mar 20237:00 amRNSUnaudited Interim Results
22nd Mar 20235:09 pmRNSResult of AGM
20th Mar 20234:45 pmRNSAGM update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.