Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPantheon Resources plc Regulatory News (PANR)

Share Price Information for Pantheon Resources plc (PANR)

Share Price is delayed by 15 minutes
Get Live Data
17.50    3.98 (29.44%)
Bid:
17.33
Ask:
17.63
Spread: 0.30 (1.731%)
Market Cap: £255.13m
PANR Live PriceLast checked at - London Stock Exchange

Intraday Pantheon Resources plc Share Chart

Drilling Update

29 Sep 2008 07:00

RNS Number : 5065E
Pantheon Resources PLC
29 September 2008
 

Press release

 29 September 2008

Pantheon Resources plc - Bullseye Confirmed as a Significant Discovery

Pantheon Resources plc ("Pantheon") or ("the Company"), the AIM-quoted oil and gas exploration company active in the Gulf of Mexico, issues the following drilling update for the Jumonville #1 well.

Initial testing of the upper portion of the Jumonville #1 Miogyp reservoir commenced on Thursday 25th September 2008. Of the 47 feet of Miogyp sand, the upper eight feet were perforated. The well initially flowed 520 barrels per day of 40.8 API gravity light oil, with no water, and 293,000 cubic feet per day of natural gas through a restricted 7/64 inch choke.

The current surface flowing pressure of 7,323 pounds per square inch (psi) is effectively unchanged from the original measurements. This indicates that the Miogyp reservoir is capable of much greater deliverability.

The initial perforations and flow rates have been restricted to avoid damage to the reservoir during this testing period. It is probable that the flow rate will be increased once permanent production and distribution facilities are completed; these are currently expected in about two weeks. An increased flow rate would be necessary to determine the full deliverability of the reservoir. 

Commercial production has already begun, as temporary production facilities are in place. Oil is being sold at a US$2.50 per barrel premium to the WTI benchmark. Natural gas will be flared until the gas sales flow line is completed over the coming weeks.

Separately, flow testing of the Camerina interval was not possible in the current borehole. The Camerina sands are located approximately two hundred feet above the Miogyp section. 

Jumonville # 2 Well 

With the Jumonville #1 well proving a success, it has been agreed to proceed with a further exploration/appraisal/development well; Jumonville #2. There is further significant potential upside with the Jumonville # 2 well. This well is designed to test the deeper Cib Haz interval. It will also delineate the Miogyp reservoir at a distance some 1,500 feet to the west of Jumonville #1 with the aim to increase reserves. It is also planned to test the Camerina formation in the offset drilling at Jumonville #2.

Planning and permitting has already begun to drill Jumonville #2 from the existing location. A drilling rig has been located and it is expected to spud Jumonville # 2 within six to eight weeks. The drilling plan allows for formation fluid testing prior to setting intermediate casing across the Miogyp/Camerina interval. The well is then planned to be continued to the deeper objective at 14,400 feet.

As production facilities will be completed, this would permit a successful well to be put on-line immediately after completion. Further delineation drilling is also being planned. 

Discoveries in the two objectives above the Cib Haz (Miogyp and Camerina) provide confidence for this deeper target. The deeper Cib Haz interval is contained in the same trapping mechanism as the proven Miogyp reservoir. It is thus considered to have a high probability of success. Seismic data indicate substantially thicker reservoir sand over a larger area in the deeper reservoir. 

There are now two wells on the Bullseye prospect, Jumonville #1 and an old wellAcosta #1. The latter was never tested but 50 feet of Miogyp sand were encountered. These two wells combined with the planned Jumonville #2 well and the existing 3D seismic data provide confidence in the structural definition of the field. This aids reserves evaluation and future planning for development drilling. In addition, in the event of a successful test of the deeper reservoir, the combined reserves of the Camerina, Miogyp and Cib Haz would make Bullseye one of the largest onshore discoveries in South Louisiana in recent years.

Jay Cheatham, CEO of Pantheon, said, "This is a very significant discovery for the company and we are obviously pleased with the testing results from a mechanically restrictive well bore. Another well is needed to ascertain completely the full reservoir extent. The bottom water drive found in the initial test will allow the wells to be flowed at a higher rate without compromising ultimate reservoir recovery"

Pantheon is participating with an 11.25% working interest in the Bullseye prospect. Back in rights have now been exercised reducing Pantheon's working interest from 15%. 

In accordance with the AIM Rules, the information in this announcement has been reviewed and approved by Jay Cheatham, who has over 30 years' relevant experience within the sector.

For further information on Pantheon Resources plc, see the website at www.pantheonresources.com

- end -

Further information:

Pantheon Resources PLC

Jay Cheatham CEO

+44 20 7484 5359

Oriel Securities Limited

Michael Shaw

+44 20 7710 7600

.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLSEEEFASASEEU
Date   Source Headline
14th Dec 20225:00 pmRNSQuarterly Repayment of Unsecured Convertible Bonds
8th Dec 20227:00 amRNSReservoir modelling report from Schlumberger
18th Nov 20221:22 pmRNSBlock Listing Six Monthly Return
10th Nov 20227:00 amRNSAcquisition of Key Leases & Operational Update
25th Oct 20227:00 amRNSOperational Update, Alkaid #2 Well
3rd Oct 20224:22 pmRNSTotal Voting Rights
26th Sep 20227:00 amRNSOperational Update, Alkaid #2 Well
20th Sep 20227:00 amRNSDirector/PDMR Notification
13th Sep 20221:21 pmRNSQuarterly Repayment of Unsecured Convertible Bonds
7th Sep 20222:30 pmRNSPantheon Graduates to the OTCQX Best Market
6th Sep 20227:00 amRNSOperational and Corporate Update
23rd Aug 20222:36 pmRNSReplacement Theta West #1 – Independent VAS Report
23rd Aug 20227:00 amRNSTheta West #1 Well – Independent Expert VAS Report
18th Aug 20227:00 amRNSOperational Update, Alkaid #2 Well
29th Jul 20227:00 amRNSOperational Update, Alkaid #2 Well
7th Jul 20227:00 amRNSSpudding of Alkaid #2 Well
28th Jun 20227:00 amRNSTR-1: Notification of major holdings
14th Jun 202210:34 amRNSQuarterly Repayment of Unsecured Convertible Bonds
31st May 20221:10 pmRNSTotal Voting Rights
18th May 20229:53 amRNSBlock Listing Application to AIM
16th May 20227:00 amRNSRig Contract Executed & Investor Presentation
4th May 20227:00 amRNSPartial Conversion of Unsecured Convertible Bonds
25th Apr 20227:00 amRNSResource Upgrade
20th Apr 20227:00 amRNSUpcoming Webinar – Registration Details
6th Apr 202210:01 amRNSConfirmation of Upcoming Webinar
5th Apr 20225:58 pmRNSTR-1: Notification of major holdings
31st Mar 20227:00 amRNSInterim Results for Six Months Ended 31/12/21
24th Mar 20227:00 amRNSTheta West #1 Testing Update
15th Mar 20227:00 amRNSIssue of Equity
9th Mar 20229:35 amRNSQuarterly Repayment of Unsecured Convertible Bonds
4th Mar 20222:14 pmRNSConversion of Shares
4th Mar 20227:00 amRNSOperations Update
21st Feb 20227:00 amRNSOperational Update
18th Feb 20227:00 amRNSPartial Conversion of Unsecured Convertible Bonds
15th Feb 20227:00 amRNSTheta West #1 Operational Update
7th Feb 20227:00 amRNSTalitha #A Testing Update
24th Jan 20224:53 pmRNSWebinar
24th Jan 202212:17 pmRNSResult of AGM
24th Jan 20227:00 amRNSSpudding of Theta West #1 Well & Operations Update
20th Jan 20227:00 amRNSExercise of Warrants
19th Jan 20227:02 amRNSAnnual Grant of Share Options to Directors & Staff
19th Jan 20227:00 amRNSDirector/PDMR Notification
13th Jan 20227:00 amRNSIssue of Equity & Exercise of Share Options
12th Jan 20229:10 amRNSTheta West Drilling Permit Approval & AGM Webinar
7th Jan 202212:05 pmRNSAnnual General Meeting & Covid Precautions
6th Jan 20227:00 amRNSOperations Update
4th Jan 20227:00 amRNSTR-1: Notification of major holdings
17th Dec 20219:23 amRNSTR-1: Notification of major holdings
17th Dec 20217:00 amRNSOperations Update
16th Dec 20217:00 amRNSTR-1: Notification of major holdings

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.