We would love to hear your thoughts about our site and services, please take our survey here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPantheon Res Regulatory News (PANR)

Share Price Information for Pantheon Res (PANR)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 35.20
Bid: 34.95
Ask: 35.30
Change: 1.60 (4.76%)
Spread: 0.35 (1.001%)
Open: 34.40
High: 36.00
Low: 33.85
Prev. Close: 33.60
PANR Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Commencement of Operations - Re-entry of Alkaid-2

27 Sep 2023 07:00

RNS Number : 7485N
Pantheon Resources PLC
27 September 2023
 

27 September 2023

Pantheon Resources plc

 Commencement of Operations - Re-entry of Alkaid-2

Pantheon Resources plc (AIM: PANR) ("Pantheon" or the "Company" or the "Group"), the oil and gas company with a 100% working interest in the Kodiak and Ahpun projects, collectively spanning 193,000 contiguous acres in close proximity to pipeline and transportation infrastructure on Alaska's North Slope, is pleased to advise that operations for the re-entry at Alkaid-2 have now commenced.

 

Objectives

 

The Alkaid-2 re-entry has three primary objectives:

 

(i) to gather the best possible reservoir fluid samples for pressure-volume temperature ("PVT") analysis;

(ii) to determine initial reservoir pressure; and

(iii) test the improvements in the frac design discussed in recent Company webinars

 

The objective of the operations at Alkaid-2 is not to target maximum flow rates. Pantheon will deliberately restrict the flow rates to minimise gas production into the well bore and allow optimum data collection. 

Re-entry to assess SMD

 

The Alkaid-2 well was positioned to target the Zone of Interest ("ZOI") in the optimum location and is on the edge of the mapped SMD reservoir. Notwithstanding the thinner SMD interval at this location when compared to the core of the Ahpun Field, the well encountered encouraging hydrocarbon indications en route to the deeper ZOI.

 

The programme of operations to achieve the three primary objectives includes:

 

1. Make well safe in preparation for operations

2. Run a plug to isolate the Alkaid ZOI below the SMD horizon

3. Perforate a limited section to ensure injection pressures are high enough to propagate the frac lobes horizontally as desired

4. Pump 11,000 bbls of water and 400,000 lbs of 100 mesh sand

5. Flow back slowly to prevent or limit gas flashing in the reservoir (i.e. exsolving from solution in an uncontrolled manner) in order to gather the most representative fluid samples possible

6. Monitor pressures throughout to assess frac efficiency and original reservoir pressure.

 

 

Jay Cheatham, CEO, said: "We are pleased that operations for the re-entry at Alkaid-2 have now begun. As stated, we are not targeting maximum flow rates, instead, this programme is designed to allow for as much data gathering as possible. Whilst the location of the Alkaid-2 well is not ideal for the shallower SMD horizon, the Company was pleasantly surprised to have logged oil pay when drilling through the SMD en route to the primary target, the ZOI. This has provided a low cost option to assess both the productivity of the shallower horizon and test our improved frac design."

 

Background

 

The Alkaid-2 well was drilled in 2022 and was positioned to prioritise testing of the primary target (or 'zone of interest', "ZOI"), being the oil zone successfully flow tested in the Alkaid-1 well in 2019. Testing of the ZOI was compromised in Alkaid-2 as a result of wellbore blockages, necessitating a number of cleanout and other remedial operations. Ultimately, the ZOI produced an IP30 production rate of c.505 barrels per day ("BPD") of marketable liquid hydrocarbons consisting of oil, condensate and NGLs, as well as natural gas.

 

As previously announced, extensive analysis has been undertaken on the Alkaid-2 ZOI results with the data supporting a commercial development based upon 10,000ft lateral development wells, a doubling of the frac efficiency to 40% and assuming no improvement in reservoir quality. The data indicates that well productivity has the potential to improve materially based upon better frac design. Tony Beilman, Pantheon's recently appointed Senior VP of Engineering, and an expert in fracking in North America, believes that with iterative optimisation, Pantheon has the potential to meet typical performance benchmarks, a 4x improvement upon that achieved in the ZOI. One of the primary objectives of the upcoming Shelf Margain Deltaic test is to assess the efficacy of an updated frac design.

 

 

 

-ENDS-

 Further information, please contact:

 

Pantheon Resources plc

+44 20 7484 5361

David Hobbs, Executive Chairman

Jay Cheatham, CEO

Justin Hondris, Director, Finance and Corporate Development

 

Canaccord Genuity plc (Nominated Adviser and broker)

Henry Fitzgerald-O'Connor, Gordon Hamilton

 

+44 20 7523 8000

 

BlytheRay 

Tim Blythe, Megan Ray, Matthew Bowld

+44 20 7138 3204

 

 

Notes to Editors

Pantheon Resources plc is an AIM listed Oil & Gas company focused on developing the Ahpun and Kodiak fields located on state land on the Alaska North Slope ("ANS"), onshore USA where it has a 100% working interest in 193,000 acres. Management estimates these fields to produce Expected Ultimate Recovery of contingent resources amounting to some 2 billion barrels of marketable liquids to be delivered through the Trans Alaska Pipeline System ("TAPS").

Pantheon's stated objective is to demonstrate sustainable market recognition of a value of $5-$10/bbl of recoverable resources by end 2028. This will require targeting Final Investment Decision ("FID") on the Ahpun field by the end of 2025, building production to 20,000 barrels per day of marketable liquids into the TAPS main oil line, and applying the resultant cashflows to support the FID on the Kodiak field by the end of 2028.

A major differentiator to other ANS projects is the close proximity to existing roads and pipelines which offers a significant competitive advantage to Pantheon, allowing for materially lower infrastructure costs and the ability to support the development with a significantly lower pre-cashflow funding requirement than is typical in Alaska.

The Company's project portfolio has been endorsed by world renowned experts. Netherland, Sewell & Associates ("NSAI") estimate a 2C contingent recoverable resource in the Kodiak project that total 962.5 million barrels of marketable liquids and 4,465 billion cubic feet of natural gas. NSAI is currently working on estimates for the Ahpun Field.

This information is provided by Reach, the non-regulatory press release distribution service of RNS, part of the London Stock Exchange. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
NRAZZGZLRVDGFZM
Date   Source Headline
24th Apr 20247:00 amRNSTR-1: Notification of major holdings
10th Apr 20244:53 pmRNSWebinar and update
9th Apr 20247:00 amRNSKodiak resource upgraded to 1.2 billion barrels
2nd Apr 20244:30 pmRNSDirector/PDMR Notification
28th Mar 20247:05 amRNSProgress on Funding and Development Planning
21st Mar 202411:51 amRNSTR-1: Notification of major holdings
18th Mar 20247:00 amRNSUnaudited Interim Results
14th Mar 20247:00 amRNSQuarterly Repayment of Unsecured Convertible Bonds
5th Mar 20245:05 pmRNSResponse to Share Price Volatility
2nd Feb 20247:00 amRNSTR-1: Notification of major holdings
1st Feb 20247:00 amRNSDirector/PDMR notification
24th Jan 20243:15 pmRNSResult of AGM & Investor Presentation Details
23rd Jan 20247:00 amRNSAnnual General Meeting
2nd Jan 20247:00 amRNSTR-1: Notification of major holdings
19th Dec 20237:00 amRNSFinal Results for the Year Ended 30 June 2023
14th Dec 20237:04 amRNSSuccessful Acquisition of Leases
12th Dec 20237:00 amRNSAppointment of Independent Non-Executive Director
21st Nov 20234:36 pmRNSStrategy Update
15th Nov 20231:54 pmRNSInvestor Presentation via Investor Meet Company
14th Nov 202311:56 amRNSBond Payment, Placement & Corporate Update
19th Oct 20237:00 amRNSValidation of frac design and fluid sampling
18th Oct 20237:00 amRNSPantheon Presenting at OTC Oil and Gas Conference
4th Oct 20237:00 amRNSReplacement TR-1: Notification of major holdings
3rd Oct 20234:02 pmRNSTR-1: Notification of major holdings
27th Sep 20237:00 amRNSCommencement of Operations - Re-entry of Alkaid-2
14th Sep 20233:34 pmRNSWebinar and update
8th Sep 20238:20 amRNSInvestor Presentation Webinar
7th Sep 20237:00 amRNSPrivate Placement
30th Aug 20237:00 amRNSDirector/PDMR Notification
29th Aug 20237:00 amRNSExpert Report Confirms Estimate for Kodiak Field
28th Jul 20237:57 amRNSReplacement Operational Update
28th Jul 20237:00 amRNSOperational Update
14th Jul 20239:30 amRNSInvestor Presentation via Investor Meet Company
10th Jul 20237:00 amRNSInvestor Presentation via Investor Meet Company
3rd Jul 20238:53 amRNSAppointment of Independent Non-Executive Director
28th Jun 20234:58 pmRNSWebinar and Strategy Update
26th Jun 202312:54 pmRNSUpcoming Webinar - Registration Details
15th Jun 20233:50 pmRNSIssue of Equity and Total Voting Rights
8th Jun 20237:00 amRNSAppointment of Executive Chairman
1st Jun 20237:00 amRNSLease Award
23rd May 20234:32 pmRNSUpdate on Fundraise
18th May 20235:40 pmRNSBlock Listing Six Monthly return
17th May 20237:00 amRNSResult of Capital Raise
16th May 20235:07 pmRNSRetail Offer via PrimaryBid
16th May 20234:59 pmRNSProposed Placing and Subscription
21st Apr 20237:00 amRNSOperational and corporate update
31st Mar 20237:00 amRNSUnaudited Interim Results
22nd Mar 20235:09 pmRNSResult of AGM
20th Mar 20234:45 pmRNSAGM update
20th Mar 20237:00 amRNSAGM webinar & corporate update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.