Sapan Gai, CCO at Sovereign Metals, discusses their superior graphite test results. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPantheon Res Regulatory News (PANR)

Share Price Information for Pantheon Res (PANR)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 31.80
Bid: 31.65
Ask: 32.00
Change: 0.45 (1.44%)
Spread: 0.35 (1.106%)
Open: 32.80
High: 32.80
Low: 30.90
Prev. Close: 31.35
PANR Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Commencement of Operations - Re-entry of Alkaid-2

27 Sep 2023 07:00

RNS Number : 7485N
Pantheon Resources PLC
27 September 2023
 

27 September 2023

Pantheon Resources plc

 Commencement of Operations - Re-entry of Alkaid-2

Pantheon Resources plc (AIM: PANR) ("Pantheon" or the "Company" or the "Group"), the oil and gas company with a 100% working interest in the Kodiak and Ahpun projects, collectively spanning 193,000 contiguous acres in close proximity to pipeline and transportation infrastructure on Alaska's North Slope, is pleased to advise that operations for the re-entry at Alkaid-2 have now commenced.

 

Objectives

 

The Alkaid-2 re-entry has three primary objectives:

 

(i) to gather the best possible reservoir fluid samples for pressure-volume temperature ("PVT") analysis;

(ii) to determine initial reservoir pressure; and

(iii) test the improvements in the frac design discussed in recent Company webinars

 

The objective of the operations at Alkaid-2 is not to target maximum flow rates. Pantheon will deliberately restrict the flow rates to minimise gas production into the well bore and allow optimum data collection. 

Re-entry to assess SMD

 

The Alkaid-2 well was positioned to target the Zone of Interest ("ZOI") in the optimum location and is on the edge of the mapped SMD reservoir. Notwithstanding the thinner SMD interval at this location when compared to the core of the Ahpun Field, the well encountered encouraging hydrocarbon indications en route to the deeper ZOI.

 

The programme of operations to achieve the three primary objectives includes:

 

1. Make well safe in preparation for operations

2. Run a plug to isolate the Alkaid ZOI below the SMD horizon

3. Perforate a limited section to ensure injection pressures are high enough to propagate the frac lobes horizontally as desired

4. Pump 11,000 bbls of water and 400,000 lbs of 100 mesh sand

5. Flow back slowly to prevent or limit gas flashing in the reservoir (i.e. exsolving from solution in an uncontrolled manner) in order to gather the most representative fluid samples possible

6. Monitor pressures throughout to assess frac efficiency and original reservoir pressure.

 

 

Jay Cheatham, CEO, said: "We are pleased that operations for the re-entry at Alkaid-2 have now begun. As stated, we are not targeting maximum flow rates, instead, this programme is designed to allow for as much data gathering as possible. Whilst the location of the Alkaid-2 well is not ideal for the shallower SMD horizon, the Company was pleasantly surprised to have logged oil pay when drilling through the SMD en route to the primary target, the ZOI. This has provided a low cost option to assess both the productivity of the shallower horizon and test our improved frac design."

 

Background

 

The Alkaid-2 well was drilled in 2022 and was positioned to prioritise testing of the primary target (or 'zone of interest', "ZOI"), being the oil zone successfully flow tested in the Alkaid-1 well in 2019. Testing of the ZOI was compromised in Alkaid-2 as a result of wellbore blockages, necessitating a number of cleanout and other remedial operations. Ultimately, the ZOI produced an IP30 production rate of c.505 barrels per day ("BPD") of marketable liquid hydrocarbons consisting of oil, condensate and NGLs, as well as natural gas.

 

As previously announced, extensive analysis has been undertaken on the Alkaid-2 ZOI results with the data supporting a commercial development based upon 10,000ft lateral development wells, a doubling of the frac efficiency to 40% and assuming no improvement in reservoir quality. The data indicates that well productivity has the potential to improve materially based upon better frac design. Tony Beilman, Pantheon's recently appointed Senior VP of Engineering, and an expert in fracking in North America, believes that with iterative optimisation, Pantheon has the potential to meet typical performance benchmarks, a 4x improvement upon that achieved in the ZOI. One of the primary objectives of the upcoming Shelf Margain Deltaic test is to assess the efficacy of an updated frac design.

 

 

 

-ENDS-

 Further information, please contact:

 

Pantheon Resources plc

+44 20 7484 5361

David Hobbs, Executive Chairman

Jay Cheatham, CEO

Justin Hondris, Director, Finance and Corporate Development

 

Canaccord Genuity plc (Nominated Adviser and broker)

Henry Fitzgerald-O'Connor, Gordon Hamilton

 

+44 20 7523 8000

 

BlytheRay 

Tim Blythe, Megan Ray, Matthew Bowld

+44 20 7138 3204

 

 

Notes to Editors

Pantheon Resources plc is an AIM listed Oil & Gas company focused on developing the Ahpun and Kodiak fields located on state land on the Alaska North Slope ("ANS"), onshore USA where it has a 100% working interest in 193,000 acres. Management estimates these fields to produce Expected Ultimate Recovery of contingent resources amounting to some 2 billion barrels of marketable liquids to be delivered through the Trans Alaska Pipeline System ("TAPS").

Pantheon's stated objective is to demonstrate sustainable market recognition of a value of $5-$10/bbl of recoverable resources by end 2028. This will require targeting Final Investment Decision ("FID") on the Ahpun field by the end of 2025, building production to 20,000 barrels per day of marketable liquids into the TAPS main oil line, and applying the resultant cashflows to support the FID on the Kodiak field by the end of 2028.

A major differentiator to other ANS projects is the close proximity to existing roads and pipelines which offers a significant competitive advantage to Pantheon, allowing for materially lower infrastructure costs and the ability to support the development with a significantly lower pre-cashflow funding requirement than is typical in Alaska.

The Company's project portfolio has been endorsed by world renowned experts. Netherland, Sewell & Associates ("NSAI") estimate a 2C contingent recoverable resource in the Kodiak project that total 962.5 million barrels of marketable liquids and 4,465 billion cubic feet of natural gas. NSAI is currently working on estimates for the Ahpun Field.

This information is provided by Reach, the non-regulatory press release distribution service of RNS, part of the London Stock Exchange. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
NRAZZGZLRVDGFZM
Date   Source Headline
1st Jun 20167:00 amRNSUpdate on VOS#1 Well
17th May 20167:00 amRNSOperational Update
25th Apr 20167:00 amRNSOperational Update
30th Mar 20167:00 amRNSInterim Results
9th Mar 20167:00 amRNSResult of Placing
8th Mar 20164:45 pmRNSProposed Placing
29th Feb 20167:00 amRNSOperational Update
22nd Jan 20167:00 amRNSTesting and Production Update
12th Jan 20167:00 amRNSVOS#1 Well - Testing Update
15th Dec 20156:07 pmRNSResult of AGM
15th Dec 201510:00 amRNSAGM Statement
3rd Dec 20157:00 amRNSCompletion of Drilling on VOS#1 Well
20th Nov 20157:00 amRNSAnnual Financial Report
28th Oct 20157:00 amRNSCompletion of Testing at VOBM#1 Well
22nd Oct 20157:00 amRNSOperational Update
8th Oct 20157:00 amRNSCommencement of testing operations
9th Sep 20157:00 amRNSDrilling Update
28th Jul 20157:00 amRNSSpudding of VOBM#1 well
16th Jul 20157:00 amRNSDrill Site and Roadworks Complete
3rd Jun 20151:32 pmRNSHolding(s) in Company
1st Jun 20157:00 amRNSUpdated Corporate Presentation
7th May 20157:00 amRNSDrilling Rig Contracted
30th Mar 20157:00 amRNSHalf Yearly Report
25th Mar 20157:07 amRNSOperational Update
2nd Mar 20158:58 amRNSChange of Nominated Adviser
29th Dec 201412:17 pmRNSResult of AGM
15th Dec 20143:45 pmRNSHolding(s) in Company
15th Dec 20147:00 amRNSDirector/PDMR Shareholding
4th Dec 20143:00 pmRNSNotice of AGM
2nd Dec 20147:30 amRNSFinal Results
19th Nov 20147:00 amRNSCompany Update
3rd Nov 20148:58 amRNSHolding(s) in Company
27th Oct 20145:55 pmRNSHolding(s) in Company
23rd Oct 20144:06 pmRNSHolding(s) in Company
22nd Oct 20145:10 pmRNSHolding(s) in Company
21st Oct 20145:43 pmRNSHolding(s) in Company
21st Oct 20143:15 pmRNSTotal Voting Rights
16th Oct 201411:04 amRNSResult of General Meeting
10th Oct 201412:00 pmRNSSuccessful Acquisition of Key Leases
7th Oct 201412:45 pmRNSHolding(s) in Company
7th Oct 201412:30 pmRNSHolding(s) in Company
7th Oct 201411:15 amRNSHolding(s) in Company
6th Oct 20145:41 pmRNSHolding(s) in Company
2nd Oct 20143:25 pmRNSTotal Voting Rights
1st Oct 20141:21 pmRNSPosting of Circular
30th Sep 20149:45 amRNSIssue of Share Options
30th Sep 20147:03 amRNSPlacing of Shares & Revised Joint Venture
14th Apr 20147:00 amRNSDirector/PDMR Shareholding
31st Mar 20147:00 amRNSHalf Yearly Report
13th Dec 201311:53 amRNSResult of AGM

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.