focusIR May 2024 Investor Webinar: Blue Whale, Kavango, Taseko Mines & CQS Natural Resources. Catch up with the webinar here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksNAUT.L Regulatory News (NAUT)

  • There is currently no data for NAUT

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Well Test Result

27 Aug 2008 07:00

RNS Number : 0570C
Global Energy Development PLC
27 August 2008
 



Immediate Release 27 August 2008

GLOBAL ENERGY DEVELOPMENT PLC

TWO FURTHER SUCCESSFUL TEST RESULTS FOR TILODIRAN 3 WELL

FOUR PRODUCTIVE FORMATIONS TESTED IN TOTAL

Global Energy Development PLC (the "Company"), the Latin America focused petroleum exploration and production company (LSE-AIM: "GED"), which operates in Colombia through its wholly-owned subsidiary Harken de Colombia Limited, is pleased to announce two further successful test results for the Tilodiran 3 well within the Colombian Rio Verde contract. These results confirm four productive formations in the Tilodiran 3 well and the overall Tilodiran field.

The Tilodiran 3 well was drilled directionally to a total depth of 13,200 feet and a conventional drill stem test ("DST") was performed in the Mirador formation. The interval was perforated from 11,652 to 11,662 feet resulting in a stabilized natural flow rate of 105 barrels of oil per day ("bopd") of 21 degrees API gravity, with a water cut of 0.5% on a choke of 18/64" and a flowing wellhead pressure of 21 psi. The results of the test conclusively demonstrate the existence of a previously unrecognized oil bearing reservoir in the Mirador formation in the Tilodiran fieldThe observed flow rate is less than has been observed in Mirador reservoirs with similar log-derived petrophysical properties in the Llanos basin. Therefore, management anticipates that allowing the formation to produce at higher pressure differentials on pump for an extended time period may result in more typical production rates for this reservoir.

The Company next performed a combined test of the Middle/Upper Gacheta formation, from perforations at 12,672 to 12,680 feet and 12,690 to 12,694 feet, and the Lower Gacheta formation, from perforations at 12,744 to 12,748 feet and 12,806 to 12,814 feet. This resulted in a stabilized natural flow rate of 480 bopd of 16.9 degrees API gravity on a choke of 28/64", a gas/oil ratio ("GOR") of 280 scf per barrel and a water cut of 2%, which analyses as completion fluid and is expected to further reduce as the well continues to clean up. A surfactant stimulation had been performed on both the intervals. However, the improvement in rate indicates the treatment was not effective in stimulating the Middle/Upper Gacheta interval, which is currently producing 518 bopd on pump in the Tilodiran 2 well. Consequently, this interval has been isolated and a stimulation treatment will be performed over the next few days.  The Middle/Upper Gacheta tested at a natural flow rate of 120 bopd in the Tilodiran 2 well, comparable to the Tilodiran 3 test, and when this well was completed with an electric submersible pump the rate increased to 814 bopd.

The previously tested Ubaque and Lower Gacheta formationin the Tilodiran 3 well produced at stabilized natural flow rates of 322 bopd and 400 bopd respectively. 

At the conclusion of the testing of the Tilodiran 3 well, the Company will analyse all the available flow and pressure data to determine the optimum completion to maximize production rates and reserve recovery.  An electric submersible pump will be installed in the well to enhance the production. 

Information available so far from the drilling of the Tilodiran 3 well and drainage area estimates from the Tilodiran 2 well indicates, in the management's opinion, that the Tilodiran field is larger than previously mapped and that further development wells could be drilled. A 3D seismic program is currently being designed to better image the extended flanks of the field and pick drilling locations.

For further information:

Global Energy Development PLC

Catherine Miles, Company Secretary +44 (0) 20 7763 7177

www.globalenergyplc.com +44 (0) 7909918034

Landsbanki Securities (UK) Limited  +44 (0) 20 7426 9000

Fred Walsh / Sebastian Jones

Notes to Editors:

The Company's shares have been traded on AIM, a market operated by the London Stock Exchange, since March 2002 (LSE-AIM: "GED"). The Company's balanced portfolio covers the countries of ColombiaPeru and Panama and comprises a base of production, developmental drilling and workover opportunities and several high-potential exploration projects.

The information contained within this announcement has been reviewed by Mr. Stephen Voss and Mr. Stephen Newton, both Directors of the Company. Mr. Voss is a Registered Professional Engineer in Texas and has been a Member of SPE for 25 years. Mr. Newton holds a Mining/Petroleum Engineering degree from the University of QueenslandBrisbane and a Master of Science Petroleum Engineering degree from Imperial College London. He has been a Member of SPE for 35 years.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLILFVETTIRFIT
Date   Source Headline
4th Mar 20117:00 amRNSReserve Report
4th Feb 20117:00 amRNSExtension Of Loan Agreement
31st Jan 20117:00 amRNSTotal Voting Rights
20th Jan 20117:00 amRNSStrategy Update and Nomination
17th Jan 20117:00 amRNSPurchase and Cancellation of Loan Notes
13th Dec 20107:00 amRNSFarm-Out Agreement
12th Oct 20101:01 pmRNSInterim Report
12th Oct 20107:00 amRNSOperating Update
16th Sep 20107:00 amRNSInterim Results
15th Sep 20107:00 amRNSLoan Agreement
30th Jul 20107:00 amRNSContract Relinquishment
15th Jul 20107:00 amRNSOperations Update
9th Jul 20107:00 amRNSDirector Shareholding
30th Jun 20107:00 amRNSDirector Shareholding
15th Jun 20107:00 amRNSWell Testing Result
28th May 20107:00 amRNSWell Testing Update
14th May 20104:26 pmRNSResult of AGM
19th Apr 201010:00 amRNSAdvisory Board
19th Apr 20109:30 amRNSPosting Of Annual Report And Accounts
6th Apr 20107:00 amRNSAppointment
29th Mar 20107:00 amRNSWell Spudded
11th Mar 20107:00 amRNSThree Year Plan
11th Mar 20107:00 amRNSFinal Results
10th Mar 20107:00 amRNSRig Mobilisation
12th Feb 20107:00 amRNSRig Contract
3rd Feb 20107:00 amRNSNew Reserve Report
24th Sep 20095:23 pmRNSPosting of Interim Report
3rd Sep 20097:00 amRNSInterim Results
27th Jul 20097:00 amRNSAcquisition of Seismic
30th Jun 20093:52 pmRNSUpdate to Total Voting Rights
19th May 200912:06 pmRNSAnnual Report & Accounts
20th Apr 20097:00 amRNSFinal Results
30th Mar 20097:00 amRNSChange of Adviser
17th Feb 20097:00 amRNSOperations Update
30th Jan 20097:00 amRNSDirectorate Change
19th Dec 20082:50 pmRNSShare Option Grant
7th Nov 20083:41 pmRNSDirector Shareholding
7th Nov 20083:38 pmRNSChange of Nomad
9th Oct 20082:10 pmRNSChange of Adviser Name
2nd Oct 20087:00 amRNSEnvironmental Approval
22nd Sep 20087:00 amRNSInterim Results
8th Sep 20087:00 amRNSWell Test Result
27th Aug 20087:00 amRNSWell Test Result
8th Aug 20087:00 amRNSWell Test Result
6th Aug 200812:01 pmRNSNotifiable Interest
4th Aug 20087:00 amRNSWell Test Result
16th Jul 20089:44 amRNSShare Option Grant
2nd Jul 20084:35 pmRNSResult of AGM
2nd Jul 20087:00 amRNSAGM Update
1st Jul 200812:03 pmRNSNotifiable Interest

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.